Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | -15.00% | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L1₹3.1 LAdmitted-Finance | -15.00% | ₹3.1 L | L1 | Admitted-Finance |
| 3 | L1₹3.1 LAdmitted-Finance | -15.00% | ₹3.1 L | L1 | Admitted-Finance |
| 4 | L1₹3.1 LAdmitted-Finance | -15.00% | ₹3.1 L | L1 | Admitted-Finance |
| 5 | L1₹3.1 LAdmitted-Finance | -15.00% | ₹3.1 L | L1 | Admitted-Finance |
Tender Value
₹3.6 L
EMD Value
₹18,046
Closing Date
1 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
NNM
Road construction work with CCC in Ahuja Dairy lane on Bhopal Singh Road in ward no. 52.
2026_NNMEE_1149594_6
241/SNV-106 L1/2026
Open Tender
Civil Works
60 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹472
NAGAR AYUKT NAGAR NIGAM
₹18,046
19 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinery soil (loam,caly or sand) i/c lift upto 1.5 m and lead upto 30 m and i/c filling watering and ramming of excavated | 9.72 | Cum | 90 | ₹874.8 | BI01010001010000000000000515BI0100001138 |
| 2 | Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion of 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work. | 2.59 | Cum | 2,930 | ₹7,594.56 | BI01010001010000000000000515BI0100001139 |
| 3 | M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work. | 11.38 | Cum | 4,600 | ₹52,343.4 | BI01010001010000000000000515BI0100001140 |
| 4 | 12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. | 58.1 | Sqm | 160 | ₹9,296 | BI01010001010000000000000515BI0100001141 |
| 5 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 2.3 | Cum | 5,650 | ₹12,995 | BI01010001010000000000000515BI0100001142 |
| 6 | Supply and stacking 53mm to 22.5mm size stone aggregate | 5.61 | Cum | 1,991.2 | ₹11,168.24 | BI01010001010000000000000515BI0100001143 |
| 7 | Laying spreading and consolidation but upto 10cm. (loose) thick coat. but excluding roller charges. | 5.61 | Cum | 115 | ₹645.01 | BI01010001010000000000000515BI0100001144 |
| 8 | Consinction of un-reinforced dowel jointed at expansion and constuction joint only plan cement concrete pavement thickness as per disign over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1.5:3) coarse and fine aggregates confirming to lS 383 maximum size of coarse aggegate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capicity and appropriate weight batcher using approvd mix design laid in approved fixed side form work (steel channal laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) sprading the concrete with shovels, rakes compacled using needing screed and plate vibrators and finished in constinous operating including provision of contraction and expansion construction joints as per norms | 33.71 | Cum | 6,800 | ₹2,29,224.6 | BI01010001010000000000000515BI0100001145 |
| 9 | Trimix for cc road etc including hire and fuel charges of concrete floter + all completion of work | 204.3 | sqm | 100 | ₹20,430 | BI01010001010000000000000515BI0100001146 |
| 10 | Providing and applying concrete hardner on c.c road top surface etc all completion of work 24x0.735x(108/107)+17.80x1%(Labour Cess) | 326.88 | kg | 17.98 | ₹5,877.3 | BI01010001010000000000000515BI0100001147 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_2152172.xls
BOQ • 0.25 MB
NNMT1.pdf
Tender Documents • 6.29 MB
6.pdf
Additional Documents • 0.14 MB
Download all tender documents and submit your bid