Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 90 MYLAPORE CHENNAI TAMIL NADU 600004 | CHENNAI | TAMIL NADU | 600004 | Not Admitted-Fee/PreQual/Technical Others-Performance is not satisfactory in existing system |
Tender Value
₹12.8 L
EMD Value
₹25,580
Closing Date
27 Jun 2024, 3:00 pmClosed
Executive Engineer (Electrical)
Engineering Unit, Admin Block 3rd Floor, IIT Madras CHENNAI-600036
Provision of 20 HP VRF unit to Room Nos.020 and 021 of NAC-II in IIT Madras
2024_IITM_198640_1
09/2024-25/ELDB
Open Tender
Electrical Works
Item Rate
30 days
IIT MADRAS CHENNAI
All required documents as specified in the tender
2 documents required · 2 mandatory
₹0
₹25,580
11 Jul 2024
18 Jun 2024
28 Jun 2024
18 Jun 2024
27 Jun 2024
19 Jun 2024
18 Jun 2024 - 19 Jun 2024
Amount
VRF AIRCONDTIONING SYSTEM
Supply & Installation of inverter based compressor with Variable refrigerant system connectable to multiple indoor units. Outdoor unit shall be factory assembled weather proof casing constructed from heavy gauge mild steel panels. The unit shall be completely factory wired and tested with necessary controls. The compressor shall be highly efficient Inverter scroll type compressor.Each module should have one inverter compressor.. Unit shall be equipped with oil recovery system to ensure stable operation with long refrigerant piping. The unit shall be compatible for BMS operation (optional). The unit shall have required electrical protection device as per manufacturer's recommendation.The ODU module should not trip due to communcation error if incase power supply failure to any indoor units.
10+10 =20 HP Outdoor Unit
Hiwall Mounted indoor Units
2 TR Capacity
Cordelss Remote controller
Supply and Fixing of Refnut Joints
Copper Refrigerant Piping with Insulation as per OEM Standard along with cable tray arrangement for exposed pipes as required
Gas Charging, Testing and commissioning
Control wiring between indoor and outdoor units with multi-core round PVC insulated copper conductor with outer PVC sheathed flexible wires laid in PVC Conduits.
Fixing of Central Controller Unit
Supply and Installation of PVC pipes as per ASTM D 1734 and suitable solvent cement jointed fittings of approved make, duly insulated with 9-mm nitrile rubber
32 MM DIA
Minor civil works like wall opening, civil pedestal and plastering etc as required to complete the work
MS structural work as required to provide outdoor unit stand, duct supports with necessary enamel painting etc
Airworld airconditioners
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .