Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.8 L+₹57,930.42 (8.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.0 L+₹78,352.66 (10.9%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹8.0 L+₹81,790.07 (11.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.1 L
EMD Value
₹20,220
Closing Date
21 Sept 2026, 4:00 pmClosed
Executive Engineer PWD RnB Division Chatroo
Executive Engineer PWD RnB Division Chatroo
Plz refer BOQ
2026_PWDJK_324612_1
e-NIT No. 59 of 2026-27 Dated 14/09/2026
Open Tender
Civil Works
Percentage
90 days
Chatroo
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RnB Division Chatroo
₹20,220
24 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1 metres: All kinds of soil : | 22.24 | cum | 479.3 | ₹10,659.63 |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | 4.32 | cum | 900 | ₹3,888 |
| 3 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | 5.01 | cum | 5,202.9 | ₹26,066.53 |
| 4 | P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size | 6.59 | cum | 7,788.4 | ₹51,325.56 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate | 1.99 | cum | 9,821.85 | ₹19,545.48 |
| 6 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:3:6 coarse sand 20mm nominal size crushed stone agg.) | 12.02 | cum | 5,733.6 | ₹68,917.87 |
| 7 | Centring and shuttering including proping, strutting & removal of the same. Up to plinth level | 65.75 | sqm | 286.35 | ₹18,827.51 |
| 8 | Centring and shuttering including proping, strutting & removal of the same for suspended floors , beams etc | 14.35 | sqm | 577.55 | ₹8,287.84 |
| 9 | Brick work with FPS bricks of class designation 75 in super structure in cement mortar 1:6 (1 cement, 6 coarse sand) | 10.88 | cum | 9,027.2 | ₹98,215.94 |
| 10 | Providing wood work in frames of doors, windows, clerestory windows & other frames, wrought framed & fixed in position Imported wood | 0.52 | cum | 55,000 | ₹28,600 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1095240.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .