| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹355.8 CrAdmitted-Finance | ₹355.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹386.3 Cr+₹30.5 Cr (8.57%)Admitted-Finance 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | ₹386.3 Cr+₹30.5 Cr (8.57%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | VASCON ENGINEERS LTD L1 | SHREE GAUTAM CONSTRUCTION COMPANY LIMITED L2 |
|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | |||||
| 2.00 | All kinds of soil | 10,090 | Cum | 143 ₹14,42,870 Lowest | 260 ₹26,23,400 |
| 3.00Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. | |||||
| 4.00 | Ordinary rock | 5,068.21 | Cum | 208 ₹10,54,188.51 Lowest | 315 ₹15,96,487.41 |
| 5.00 | Hard rock (blasting prohibited) | 2,448 | Cum | 351 ₹8,59,248 Lowest | 1,600 ₹39,16,800 |
| 6.00Excavating trenches of required width for pipe, cables etc including excavation for sockets ,& dressing of sides ,ramming of bottoms ,depth upto 1.5m including getting out the excavated soil,& then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming ,watering, etc and disposing of surplus excavated soil as directed, within lead of 50m. | |||||
| 7.00All kinds of soil | |||||
| 8.00 | Pipes, cables etc exceeding 80 mm dia but not exceeding 300 mm dia | 1,131 | RM | 143 ₹1,61,733 Lowest | 330 ₹3,73,230 |
| 9.00Excavating trenches of required width for pipes, cables, etc including excavation for sockets,depth upto 1.5 m, including getting out the excavated matterials, returning the soil as requred in layers not exceeding 20 cm in depth including consolidating each deposited layers by by ramming, watering,etc. and stacking serviceable material for measurements and disposal of unserviceable matterial for measurement and disposal of unserviceable matterial as directed within a lead of 50m: | |||||
| 10.00Ordinary rock | |||||
Tender Value
Refer Docs
EMD Value
₹3.4 Cr
Closing Date
22 May 2023, 5:00 pmClosed
Nodal Officer
e-Procurement Cell, Jharkhand State Building Construction Corporation Ltd., Beside Jharkhand Mantralaya Dhurwa, Ranchi-834004.
Remaining work of Construction of Medical College and Up gradation of District Hospital at Koderma
2023_JSBCC_68298_1
JSBCCL/151/2022-23
Open Tender
Civil Works - Buildings
Item Rate
900 days
Koderma
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Yes
JSBCCL
₹3.4 Cr
JSBCCL
6 Jul 2023
29 Mar 2023
24 May 2023
29 Mar 2023
22 May 2023
29 Mar 2023
3 Apr 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | - | - | - | - |
| - | All kinds of soil | - | Cum | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. | - | - | - | - |
| - | Ordinary rock | 0.6 | Cum | - | - |
| - | Hard rock (blasting prohibited) | - | Cum | - | - |
| - | Excavating trenches of required width for pipe, cables etc including excavation for sockets ,& dressing of sides ,ramming of bottoms ,depth upto 1.5m including getting out the excavated soil,& then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming ,watering, etc and disposing of surplus excavated soil as directed, within lead of 50m. | - | - | - | - |
| - | All kinds of soil | - | - | - | - |
| - | Pipes, cables etc exceeding 80 mm dia but not exceeding 300 mm dia | - | RM | - | - |
| - | Excavating trenches of required width for pipes, cables, etc including excavation for sockets,depth upto 1.5 m, including getting out the excavated matterials, returning the soil as requred in layers not exceeding 20 cm in depth including consolidating each deposited layers by by ramming, watering,etc. and stacking serviceable material for measurements and disposal of unserviceable matterial for measurement and disposal of unserviceable matterial as directed within a lead of 50m: | - | - | - | - |
| - | Ordinary rock | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_91945.xls
BOQ Document • 2.01 MB
117966162.pdf
Tender Document • 0.46 MB
TECHNICAL-SPECIFICATION-KODERMA-MEDICAL-COLLEGE-APPROVED-MAKE-LIST.pdf
Tender Document • 1.08 MB
SBD-151.pdf
Tender Document • 3.03 MB
117966164.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .