Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹772.4 Cr
EMD Value
₹15.4 Cr
Closing Date
2 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 4 members)
Yes (up to 3 members)
Two Packet System
EPC [ Single Stage ]
Yes
02/11/2026 16:00
Lowest to Highest
180 days
Expenditure
Capital (Works)
NL
14 conditions · 3 needing a document upload
Financial capacity of the bidder shall be as per clause no.2.2 of Requestfor proposal (RFP) Document.
Technical capacity of the bidder shall be as per clause no. 2.2 of Request for proposal (RFP) Document.
Important: All documents uploaded and remarks / confirmation entered by the bidders against any eligibility condition shall be opened as part of technical bid only
14 conditions · 3 needing a document upload
Please refer to RFP Document for all details.
Uploading of NEFT FORM- As per the format attached with the RFP document.
Uploading of certificate by local suppliers in regard to meeting the Minimum Local Content requirement to avail benefits under Public Procurement Policy Order-2017 (A) for procurement order of value less than Rs.10 crores: self certificate in accordance with Para-9 (a) of Public Procurement (preference to Make in India) Order 2017. (B) For Procurement Order of value more than Rs.10 crores, the certificate from Statutory auditor/cost auditor/practicing CA as the case may be in accordance with Para-9 (b) of Public Procurement (Preference to Make in India) Order 2017.
Please refer to RFP Document in detail for uploading of document.
It is the responsibility of the tenderer to see corrigendum, if any to tender notice up to the date of tender opening.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Civil Engineering Works, Electrification Works and Signalling & Telecommunication Works of New Single Broad Gauge line of Bansgaon(Excluding)(Chainage 76+000) -Barhalganj (Including) (Chainage43+060) Section (Length: 32.940 Km) in connection with Sahjanwa - Dohrighat New Broad Gauge Railway Line Project of North Eastern Railway"
DYCE-CON-BR-EPC-02-2026~NER
DYCE-CON-BR-EPC-02-2026
Open
Works - General
900 Days
Gorakhpur, Uttar Pradesh
₹0
₹15.4 Cr
30 Sept 2026
30 Sept 2026
18 Nov 2026
2 Nov 2026
139 items across 5 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | 1440.00 | — | — | ||
| Boring, providing and installation of bored cast in-situ Reinforced Cement Concrete piles using Hydraulic piling Rig of specified diameter and length below pile cap of specified grade with Design Mix Cement Concrete, using 20mm graded crushed stone aggregate and coarse sand of approved quality, to carry a safe working load not less than specified, concreting by machine batching, machine mixing, scaffolding, using Admixture in approved proportion (as per IS:9103), placing with tremie pipe, chipping off of pile top to remove laitance concrete above cut off level etc., pumping and bailing out water complete in all respect as per approved drawing, specification and direction of the Engineer in charge. Note: 1. Payment for only cement, reinforcement shall be made extra.2. Length of the pile for payment shall be measured up to the bottom of RCC pile Cap.3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. 1200mm diameter | — | — | — | 1,17,65,577.6 | |
| — | 4.00 | — | — | ||
| Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Initial load test up to 50 ton capacity pile | — | — | — | 2,03,379.92 | |
| — | 4.00 | — | — | ||
| Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Initial load test above 50 ton and up to 100 T capacity pile | — | — | — | 2,46,691.36 | |
| — | 4.00 | — | — | ||
| Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Initial load test above 100 ton and up to 250 T capacity pile | — | — | — | 3,32,252.64 | |
| — | 4.00 | — | — | ||
| Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Extra for every increase of 50 ton in pile capacity or part thereof over 250 ton | — | — | — | 18,265 | |
| — | 4.00 | — | — | ||
| Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Routine Load Test up to 50 ton capacity pile | — | — | — | 1,01,689.96 | |
| — | 4.00 | — | — | ||
| Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Routine Load Test above 50 ton capacity up to 100 ton capacity pile | — | — | — | 1,23,345.68 | |
| — | 4.00 | — | — | ||
| Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Routine Load Test above 100 ton capacity up to 250 ton capacity pile | — | — | — | 1,66,126.32 | |
| — | 78.00 | — | — | ||
| Lateral load testing of single pile in accordance with "IS Code of practice IS:2911 (Part-IV) for determining safe allowable lateral load of pile" with all labour, material, tool & plants, equipment, machinery, etc complete as per drawing and specification as directed by the Engineer. Piles with lateral load capacity of up to 50 ton | — | — | — | 14,96,510.34 | |
| — | 78.00 | — | — | ||
| Lateral load testing of single pile in accordance with "IS Code of practice IS:2911 (Part-IV) for determining safe allowable lateral load of pile" with all labour, material, tool & plants, equipment, machinery, etc complete as per drawing and specification as directed by the Engineer. Piles with lateral load capacity of above 50 ton and up to 100 ton | — | — | — | 22,68,767.28 | |
| — | 162860.16 | — | — | ||
| Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes. | — | — | — | 1,62,77,872.99 | |
| — | 714.16 | — | — | ||
| Supply and using Cement at Worksite Ordinary Portland Cement 43 grade approved brands/makes | — | — | — | 47,20,176.25 | |
| — | — | — | 1,59,41,831.7 | ||
| — | 5.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BARHALJGANJSIP.pdf
ATTACHMENT
GOLABAZARSIP.pdf
ATTACHMENT
UrwaBazarSIP_compressed.pdf
ATTACHMENT
BANWARPARHALT_compressed.pdf
ATTACHMENT
BARHALGANJSB_compressed.pdf
ATTACHMENT
BHARULIHALT_compressed.pdf
ATTACHMENT
SBGOLABAZAR_compressed.pdf
ATTACHMENT
SBURUABAZAR_compressed.pdf
ATTACHMENT
KM.30.00To35.00KM_compressed.pdf
ATTACHMENT
KM.35.00To40.00KM._compressed.pdf
ATTACHMENT
KM75.00To80.00KM._compressed.pdf
ATTACHMENT
KM.40.00To45.00KM._compressed.pdf
ATTACHMENT
KM.45.00To50.00KM._compressed.pdf
ATTACHMENT
KM.50.00To55.00KM._compressed.pdf
ATTACHMENT
KM.55.00To60.00KM._compressed.pdf
ATTACHMENT
KM.60.00To65.00KM._compressed.pdf
ATTACHMENT
KM.65.00To70.00KM._compressed.pdf
ATTACHMENT
KM.70.00To75.00KM._compressed.pdf
ATTACHMENT
UrwaBazar_compressed.pdf
ATTACHMENT
Banvarpar_compressed_1.pdf
ATTACHMENT
Barhalganj_compressed2.pdf
ATTACHMENT
BharauliHALT_compressed.pdf
ATTACHMENT
Golabazar03.10.20241_compressed.pdf
ATTACHMENT
POWERSUPPLYDIAGRAMELECTRICAL_compressed.pdf
ATTACHMENT
BR.NO.15LHS.pdf
ATTACHMENT
BR.NO.16LHS.pdf
ATTACHMENT
BR.NO.17LHS.pdf
ATTACHMENT
BR.NO.18LHS.pdf
ATTACHMENT
BR.NO.19LHS.pdf
ATTACHMENT
BR.NO.22LHS.pdf
ATTACHMENT
BR.NO.23LHS.pdf
ATTACHMENT
BR.NO.24LHS.pdf
ATTACHMENT
BR.NO.25.pdf
ATTACHMENT
BRIDGENO.16A.pdf
ATTACHMENT
BRIDGENO.20.pdf
ATTACHMENT
BRIDGENO.26LHS.pdf
ATTACHMENT
BRIDGENO.27LHS.pdf
ATTACHMENT
BRIDGENO.28LHS.pdf
ATTACHMENT
BRIDGENO.28ALHS.pdf
ATTACHMENT
BRIDGENO.29LHS.pdf
ATTACHMENT
BRIDGENO.30.pdf
ATTACHMENT
BRIDGENO.31LHS.pdf
ATTACHMENT
BRIDGENO.31ALHS.pdf
ATTACHMENT
BRIDGENO.32LHS.pdf
ATTACHMENT
BRIDGENO.33.pdf
ATTACHMENT
BRIDGENO.34LHS.pdf
ATTACHMENT
BRIDGENO.35LHS.pdf
ATTACHMENT
BRIDGENO.36LHS.pdf
ATTACHMENT
BRIDGENO.40LHS.pdf
ATTACHMENT
BRIDGENO.41.pdf
ATTACHMENT
BRIDGENO.42RUB.pdf
ATTACHMENT
BRIDGENO.43.pdf
ATTACHMENT
BRIDGENO.44LHS.pdf
ATTACHMENT
BRIDGENO.47ALHS.pdf
ATTACHMENT
BRIDGENO.48LHS.pdf
ATTACHMENT
BRIDGENO.49LHS.pdf
ATTACHMENT
BRIDGENO.49ALHS.pdf
ATTACHMENT
BRIDGENO.50LHS.pdf
ATTACHMENT
BRIDGENO.50ACH.64900.0M.pdf
ATTACHMENT
BRIDGENO.51LHS.pdf
ATTACHMENT
BRIDGENO.52LHS.pdf
ATTACHMENT
BRIDGENO.53LHS.pdf
ATTACHMENT
BRIDGENO.54.pdf
ATTACHMENT
BRIDGENO.55.pdf
ATTACHMENT
BRIDGENO.56.pdf
ATTACHMENT
BRIDGENO.60.pdf
ATTACHMENT
BRIDGENO.60ALHS.pdf
ATTACHMENT
BRIDGENO.61RUB.pdf
ATTACHMENT
BRIDGENO.61A.pdf
ATTACHMENT
BRIDGENO.62LHS.pdf
ATTACHMENT
BRIDGENO.63.pdf
ATTACHMENT
BRIDGENO.64.pdf
ATTACHMENT
BRIDGENO.68LHS.pdf
ATTACHMENT
BRIDGENO.69LHS.pdf
ATTACHMENT
BRIDGENO.69ALHS_1.pdf
ATTACHMENT
BRIDGENO.70.pdf
ATTACHMENT
MAJORBR.NO.46.pdf
ATTACHMENT
MAJORBRIDGENO.39_1.pdf
ATTACHMENT
MAJORBRIDGENO.59.pdf
ATTACHMENT
MAJORBRIDGENO.65.pdf
ATTACHMENT
MINORBRIDGENO.38.pdf
ATTACHMENT
RUBBRIDGENO.37.pdf
ATTACHMENT
TypeIIQtrsDS_compressed.pdf
ATTACHMENT
TypeIIIQtrsDS_compressed.pdf
ATTACHMENT
TROLLYREFUSE171220_251104_231625new.pdf
ATTACHMENT
TOWERWAGONSHED.pdf
ATTACHMENT
TypePlanVIPpublictoiletpayanduseNew.pdf
ATTACHMENT
LONGITUDNALDrain.pdf
ATTACHMENT
IRWMACS12.pdf
ATTACHMENT
BRIDGENO.35ALHS_1.pdf
ATTACHMENT
RCCL-typeRetainingwall1.50m-compressed.pdf
ATTACHMENT
RCCL-typeRetainingwall2.00m-compressed.pdf
ATTACHMENT
BRIDGENO.45_1.pdf
ATTACHMENT
GADOFMERCHANTROOMATPHYSTN.212-compressed.pdf
ATTACHMENT
BRIDGENO.47LHS_1.pdf
ATTACHMENT
BRIDGENO.57_1.pdf
ATTACHMENT
BRIDGENO.58LHS_1.pdf
ATTACHMENT
subway.pdf
ATTACHMENT
eBGPolicyinEPCGCCPMSPSSAGCPGMS_1.pdf
ATTACHMENT
2025-08-19-RDSO_T_9792_ALT_2.pdf
ATTACHMENT
2025-08-19-RDSO_T_9843_ALT_2.pdf
ATTACHMENT
2025-08-22-StatusofIRconcretesleeperPlantsupdatedason30072511.pdf
ATTACHMENT
2026-03-23-FRSforCantedTurnoutforuseonNLGCandMultiTrackingProjects1.pdf
ATTACHMENT
AdobeScan04Jun2026Annexure-E.pdf
ATTACHMENT
Approachroaddrawing.pdf
ATTACHMENT
CirculatingareaRoadPlateform.pdf
ATTACHMENT
DrawingofCableDuctAnnexure-A_compressed.pdf
ATTACHMENT
GluedJointManualcorrectionslip.pdf
ATTACHMENT
heightgaugeTI-DRG-CIV-HGAUGE-RDSO-00002-05-01.pdf
ATTACHMENT
IndicativeBoundarywall.pdf
ATTACHMENT
IndicativeRetainingWall.pdf
ATTACHMENT
LowCostPPShelterNew.pdf
ATTACHMENT
OHEdepot-psiohe.JPG.pdf
ATTACHMENT
PFwall.pdf
ATTACHMENT
PolicyOFCLayingdated2.1.2026Annexure-B.pdf
ATTACHMENT
policyofferruleAnnexure-C.pdf
ATTACHMENT
RCCL-typeRetainingwall1.50m-compressed_1.pdf
ATTACHMENT
RCCL-typeRetainingwall2.00m-compressed_1.pdf
ATTACHMENT
RCCL-typeRetainingwall3.00m-compressed.pdf
ATTACHMENT
RCCL-typeRetainingwall4.00m-compressed.pdf
ATTACHMENT
RCCoverheadtankreferencedrawing1_compressed_1.pdf
ATTACHMENT
RCCoverheadtankreferencedrawing2_compressed.pdf
ATTACHMENT
Retainingwallhtup6mtrs.pdf
ATTACHMENT
TrackMachineRestRoom.pdf
ATTACHMENT
TypePlanVIPpublictoiletpayanduseNew_1.pdf
ATTACHMENT
wingwall-rotated_260129_172505.pdf
ATTACHMENT
BR.NO.20ALHS_1.pdf
ATTACHMENT
BR.NO.21_1.pdf
ATTACHMENT
0053INSPECTIONCRADLE_compressed.pdf
ATTACHMENT
CBS-0046SIDEPATHWAY_compressed.pdf
ATTACHMENT
PPShelterNew.pdf
ATTACHMENT
RBletterforpassengeramenities.pdf
ATTACHMENT
FinalRFPForEPCPhase-II30.09.2026.pdf
ATTACHMENT
FinalEPCAgreementDocumentBasgaon-Barhalganjupdated30.09.26_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .