Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-Finance KALYANESWARI PASCHIM BARDHAMAN WEST BENGAL | KALYANESWARI | PASCHIM BARDHAMAN | WEST BENGAL | L1 | Accepted-Finance Offered lowest rate | |
| 2 | L2₹25.0 L+₹12,413.79 (0.50%)Rejected-Finance 223 N DHARMAPALLY TENTULTALA ASANSOL BURDWAN WEST BENGAL 713304 | ASANSOL | BURDWAN | WEST BENGAL | 713304 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹25.1 L+₹22,380.81 (0.90%)Rejected-Finance 266 1 S B GORAI ROAD BESIDE VIDYASAGAR MAIDAN ASANSOL 713301 | ASANSOL | BURDWAN | WEST BENGAL | 713301 | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹51,250
Closing Date
3 Feb 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION, PHE
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Leakage repairing and extension of existing DN 250 mm raw water common header and repairing and rewinding one no. Pontoon mounted pumping machinery on river Fulhar at Intake Station of Balupur water supply scheme with other allied works in the distri
2023_PHED_445321_6
WBPHED/EE/MLMD/NIeT_28 of 2022-2023
Open Tender
Electrical Work/ Equipment
Item Rate
45 days
Doulatpur PHE Complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
5 documents required · 5 mandatory
₹51,250
Yes
9 Mar 2023
17 Jan 2023
6 Feb 2023
17 Jan 2023
3 Feb 2023
17 Jan 2023
Amount
Carrying one (01) nos. damaged 22 KW single stage non-clog Submersible pump motor set (Q-172M3/hr, H-20Mtr, Sl No. 1NASA116005) complete from the site for necessary repairing of the same at workshop at Malda by hiring suitable four wheeler vehicle including loading & unloading at both the ends as per direction of EIC.
Supply of the following spares as per existing sample for the one no. motor set
Rotor Bush
O Ring
Carbide type mechanical seal (equivalent type)
Deep Groove Ball bearing (SKF Make equivalent type)
Rubber 'O' ring for mechanical seal housing,motor end cover and stuffing box bush
Mechanical seal oil (grade 20-40)
Hex. Bolt (nominal dia. Size of 20 mm & 32 mm.)
Dismantling non-clog Submersible pump motor set part by part for necessary repairing and replacement of the damaged spares as per direction.
Machining of the existing damaged pump shaft after remetalizing the wornout portions for proper matching of newly supplied rotor bush.
Making the rotor grinding properly at workshop and cleaning the stator core and straightening of the stator core part by part by cleaning oil and other cleaning materials as per direction of E.I.C.
Rewinding the 22 KW motor by supplying suitable gauge PVC insulated copper wire & by other required materials as per direction of EIC. (The rate has been derived after deduction the cost of old damaged copper wire.)
Heating, baking and heat vernishing of the above 22 kW motor incl. supply of 'Dr. Bend F-50 Varnish' incl. 8 hrs. heat chamber complete the job as per direction of E.I.C.
Reassembling the non-clog Submersible pump motor set with newly supplied spares in item no 2.01 to 2.07 and old serviceable spares by experienced mechanics as per direction of EIC.
Painting the Pump motor set after repairing by supplying approved make paint of two coats after through scraping out the old paint rust as per direction.
Carrying of newly repaired pump-motor set from work shop at Malda to the site by hiring suitable four wheeler vehicle including loading & unloading at both the ends as per direction of EIC.
Re-installation, testing and comissioning of the newly repaired pump by engaging electrician and hiring boat and terminating cable and reconnecting delivery pipe line upto entire satisfaction of E.I.C.
Supply, delivery and storage of following materials at site:
80 mm dia Cast Iron kinetic double orifice air released valve as per relevant IS, PN-1.0. :-N.B. : Test Certificate to be produced for each valve.
MS pipe T (250mm X 250mm X 80 mm) of length 1 mtr,thickness 12 mm- 1 no
Short piece (250mm X 250mm) of length 1 mtr, thickness 12 mm having both side flanged and 8 nos. holes and 10 nos. hole respactively at both side- 2 nos
Hiring charges of JCB and engaging labour for uprooting of the laid raw water pipe line (planted upto 3 ft depth and about 4 ft below riverine soil) after excavation of earth by manual labour (where JCB inaccesible) for repairing and reconnecting with the DN 250 mm flexible rubber hose (previously supplied) all complete as per direction of EIC
Charges for Leakage repairing, sand chokage washing of the existing DN 250 mm dia flexible rubber hose and DN 250 mm Schd-80 PVC pipe (ASTMD-1785) for raw water common header by supply and fixing gasket, washer and nut and bolts by skilled plumber including earth filling with excavated soil and sand all complete as per direction of EIC.
Supply delivery at site and storage of DN 250 mm flexible rubber hose having proper reinforcement, flanged ends each of length 3 Meters suitable for installing on floating barge at river for raw water pumping main at outdoor installations. Hose should have burst pressure no less than 8 kg/sqcm (Make-Asian Supply Agency/ Techno Corporation/ approved vendor of PHED)
Carrying of 250 mm dia rubber hose pipe as in sl no 15.00 from river embankment to Barge position by suitable mode of carraige preferably through head load mode of transfer (1 no. Hose pipe carrying required 4 nos. labour and can carry 4 nos. pipe in 8 hours considering 0.8 KM inside the river bed) considering critical accidental swamp land in Fulhar river.
Fitting fixing of 250 mm dia rubber hose pipe as in sl no 15.00 with the existing hose pipe and making new rubber insertion (100 Kg approx) and new MS nut, bolt of TATA/GKW make (300 Kg approx) all complete as per direction of EIC. (1 pipe fittings need two nos flange joint, 35 nos new+ 3 nos. old )
Fiiting and fixing of all items as mentioned in 12.01 to 12.03 including supply of all erection materials, rubber insertion, required quantity of nuts and bolts, valve supports etc. as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method without hampering the normal water supply, earth work in excavation of foundation trenches or drains for incorporating air valve in betwwen of rising main to avoid brusting ( work shall be completed in all respect and as per direction of EIC)
MAKE AS PER DEPARTMENTAL APPROVED VENDOR LIST CIRCULATED VIDE MEMO NO.PHE/IV/2277/W-181/19 DATED- 25/09/2019
Add GST @ 18%
Add Cess @ 1%
BENGAL CONSTRUCTION
M/S. SWAPAN BANERJEE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .