Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | -41.00% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 L+₹38,574.24 (13.8%)Admitted-Finance | -32.88% | ₹3.2 L+₹38,574.24 (13.8%) | L2 | Admitted-Finance |
| 3 | L3₹3.5 L+₹65,224.68 (23.3%)Admitted-Finance | -27.27% | ₹3.5 L+₹65,224.68 (23.3%) | L3 | Admitted-Finance |
| 4 | L4₹3.9 L+₹1.1 L (37.5%)Admitted-Finance | -18.89% | ₹3.9 L+₹1.1 L (37.5%) | L4 | Admitted-Finance |
| 5 | L5₹4.0 L+₹1.2 L (42.8%)Admitted-Finance | -15.78% | ₹4.0 L+₹1.2 L (42.8%) | L5 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,500
Closing Date
29 Mar 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer PWD R B Division JMC
construction of 01 no Washroom and other repair work in Ever Green Park (Park no 34) in Sec-7, Channi Himmat ward no 50 Jammu.
2026_HAUDD_306512_1
PWD(RB)DIV/JMC/76 of 2025-26 Dated 20-03-2026
Open Tender
Civil Works
Percentage
90 days
ward no 50
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer PWD R B Division JMC
₹9,500
30 Mar 2026
20 Mar 2026
29 Mar 2026
20 Mar 2026
29 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | - | Cum | 592.9 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8graded stone aggregate 40 mm nominal size) | - | Cum | 5,202.9 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | 5,733.6 | - |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 9,395.7 | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | 123.2 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. | - | Sqm | 286.35 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: column, piller, piers | - | Sqm | 723.2 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: suspended floor,roofs etc | - | Sqm | 718.2 | - |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | - | Cum | 7,571.55 | - |
| 10 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | - | Cum | 1,455.65 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_995192.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .