| 1 | L1₹51.2 CrAccepted-AOC NO 12 RAMVILAS NAGAR NGO B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | ₹51.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹59.3 CrRejected-AOC 39 3A 1 DHARMAPURI MAIN ROAD CHIKKANAMPATTY VILLAGE KADAIYAMPATTY TK SALEM DT 636 309 | SALEM | TAMIL NADU | 636309 | ₹59.3 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹59.4 CrRejected-AOC | ₹59.4 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹59.6 CrRejected-AOC 74 T N H B COLONY NEAR BALAMURUGAN TEMPLE MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | ₹59.6 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹60.4 CrRejected-AOC NO 6 7 TEACHER RAJAMANICKAM 3RD STREET CHENNAI BANGALORE NH SHENBAKKAM VELLORE 632 008 | VELLORE | TAMIL NADU | 632008 | ₹60.4 Cr | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | J K CONSTRUCTIONS L5 | RPP INFRA PROJECTS LIMITED L6 | EKK Infrastructure LImited L7 | M/s. Sindu Muruga Constructions Pvt. Ltd., L1 | SPL INFRASTRUCTURE PVT. LTD L8 | Sri Sivaram and co L4 | D.Tamilrajan L3 | TPS CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Part A - Formation of Road | |||||||||||
| 1.01 | Clearing Heavy Jungle.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc., Complete complying with standard specification and as directed by SIPCOT officers. | 97,296 | Sqm | 7 ₹6.8 L | 7 ₹6.8 L | 2.17 ₹2.1 L | 4.5 ₹4.4 L | 6 ₹5.8 L | 7 ₹6.8 L | 9.63 ₹9.4 L | 7.47 ₹7.3 L |
| 1.02 | Earth work excavation for cutting work in all class of soils such as hard stiff clay, stiff black cotton soil, etc., as per SS20-B ( HGS SS.20B) and deposting the same to the road side as directed by Engineer in charge etc., Complete complying with standard specification and as directed by SIPCOT officers. | 12,497 | Cum | 100 ₹12.5 L | 108 ₹13.5 L | 59.83 ₹7.5 L | 160 ₹20.0 L | 110 ₹13.7 L | 98 ₹12.2 L | 127.83 ₹16.0 L | 101.64 ₹12.7 L |
| 1.03 | Supply and laying NP4 class - 300m dia pipes including collar as directed by Engineer in charge etc., Complete complying with standard specification and as directed by SIPCOT officers. | 1,505 | Rm | 970 ₹14.6 L | 833 ₹12.5 L | 782.74 ₹11.8 L | 700 ₹10.5 L | 2,100 ₹31.6 L | 960 ₹14.4 L | 976.81 ₹14.7 L | 1,268 ₹19.1 L |
| 1.04 | Forming Embankment using Carted earth with a lead of 20 km having CBR value not less then 8% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 95% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc., Complete complying with standard specification and as directed by SIPCOT officers. (Forming Embankment using Carted earth at 95% Compaction) | 1,27,977 | Cum | 579 ₹7.4 Cr | 602 ₹7.7 Cr | 618.6 ₹7.9 Cr | 400 ₹5.1 Cr | 635 ₹8.1 Cr | 570 ₹7.3 Cr | 66.95 ₹85.7 L | 450 ₹5.8 Cr |
| 1.05 | Forming Subgrade using Carted earth with alead of 20 km having CBR value not less than 8% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification. (Forming Subgrade using Carted Earth at 97% Compaction) | 69,192 | Cum | 582 ₹4.0 Cr | 613 ₹4.2 Cr | 625.04 ₹4.3 Cr | 425 ₹2.9 Cr | 635 ₹4.4 Cr | 575 ₹4.0 Cr | 501.6 ₹3.5 Cr | 450 ₹3.1 Cr |
| 1.06 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. | 18,041 | Cum | 1,618 ₹2.9 Cr | 1,683 ₹3.0 Cr | 1,812.6 ₹3.3 Cr | 1,250 ₹2.3 Cr | 2,200 ₹4.0 Cr | 1,600 ₹2.9 Cr | 2,125.52 ₹3.8 Cr | 1,900 ₹3.4 Cr |
| 1.07 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- III of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. | 12,738 | Cum | 1,825 ₹2.3 Cr | 1,874 ₹2.4 Cr | 1,862.95 ₹2.4 Cr | 1,345 ₹1.7 Cr | 2,200 ₹2.8 Cr | 1,800 ₹2.3 Cr | 2,321.49 ₹3.0 Cr | 1,900 ₹2.4 Cr |
| 1.08 | Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 150mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 and as directed by SIPCOT Officers. | 24,780 | Cum | 1,977 ₹4.9 Cr | 2,003 ₹5.0 Cr | 2,064.35 ₹5.1 Cr | 1,435 ₹3.6 Cr | 2,400 ₹5.9 Cr | 1,950 ₹4.8 Cr | 2,558.23 ₹6.3 Cr | 2,100 ₹5.2 Cr |
| 1.09 | Providing and laying Prime coat over wet mix macadam surface using 7.00 Kg bitumen for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 502 of MORT & H specifications. | 99,119 | Sqm | 67 ₹66.4 L | 66 ₹65.4 L | 32.63 ₹32.3 L | 50 ₹49.6 L | 45 ₹44.6 L | 66 ₹65.4 L | 80.96 ₹80.2 L | 60 ₹59.5 L |
Tender Value
₹79.5 Cr
EMD Value
₹39.8 L
Closing Date
9 Feb 2026, 3:30 pmClosed
Managing Director
SIPCOT Head office Egmore Chennai
Formation of Approach Road from Km 84/4 of G.W.T Road (NH 48) from Ch 0000 4 270 including Construction of Minor Bridges at CH 780, 260, 200 and Box Culverts to SIPCOT Industrial Park , Panapakkam, Ranipet District.
2026_SIPCT_640407_1
NIT.No.50/CD/T.No.50/2025-26
Open Tender
Civil Works
SIPCOT Industrial Park, Panapakkam, Ranipet Distr
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹39.8 L
SIPCOT Head office
9 Mar 2026
8 Jan 2026
10 Feb 2026
8 Jan 2026
9 Feb 2026
27 Jan 2026
20 Jan 2026
Part A - Formation of Road
Clearing Heavy Jungle.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc., Complete complying with standard specification and as directed by SIPCOT officers.
Earth work excavation for cutting work in all class of soils such as hard stiff clay, stiff black cotton soil, etc., as per SS20-B ( HGS SS.20B) and deposting the same to the road side as directed by Engineer in charge etc., Complete complying with standard specification and as directed by SIPCOT officers.
Supply and laying NP4 class - 300m dia pipes including collar as directed by Engineer in charge etc., Complete complying with standard specification and as directed by SIPCOT officers.
Forming Embankment using Carted earth with a lead of 20 km having CBR value not less then 8% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 95% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc., Complete complying with standard specification and as directed by SIPCOT officers. (Forming Embankment using Carted earth at 95% Compaction)
Forming Subgrade using Carted earth with alead of 20 km having CBR value not less than 8% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification. (Forming Subgrade using Carted Earth at 97% Compaction)
Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers.
Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- III of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers.
Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 150mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 and as directed by SIPCOT Officers.
Providing and laying Prime coat over wet mix macadam surface using 7.00 Kg bitumen for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 502 of MORT & H specifications.
Providing and laying Tack coat over treated wet mix macadam surface using 2.50 Kg bitumen to cut back for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 503 of MORT & H specifications.
Providing and laying to 110 mm thickness Dense Bituminous macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG40 bitumen for premixing for 10 Sq.meter includin cost and conveyance of all materials to CMP site including cost and conveyance of bitumen and other materilas to CMP site heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hoti mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 110 mm with mechanical paver to the specified grades and cross sections and compaction by vibratory Pneumatic Roller to the required density etc., including labour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver(in 2 layers of 60 mm + 50 mm ) site etc., including hire,fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper ttrucks, paver finisher/9 m paver finisher, vibratary/Pneumatic Roller, and al other tools & plants required including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 505 MORTH REV. V Specification and as per directed SIPCOT Officers.(Grade II) in 2 layers of 50mm+60mm)
Providing and laying 40mm compacted thickness bituminous concrete using 0.13 cum of 19.0 - 9.5 mm graded IRC size HBG metal 0.17 cum of 9.5-2.36mm IRC graded metal and 0.26 Cum. of 2.36 mm and below size graded metal with 50.30 Kg of bitumen grade VG 40 confirming to IS 73 for pre mixing for 10 Sq. meter and using materials as per table 500 - 17 and staifying the physical requirement for material for course aggregates for BC as per table 500 - 16 of MORTH REV-V including cost and conveyance of all materials to CMP site , heating the bitumen andaggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveyin the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidation 80-100 kn vibratory/Pneumatic road roller to the required density etc., includinglabour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire, fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper trucks, paver finaisher/9 m paver finisher /Vibratory/Pneumatice road roller , and all other tools and plants requried, including fuel and all other incidental charges etc., complete as per specification using CMPP as per clause 507 OF MORTH REV. specification and as directed by SIPCOT Officers. (Grade II)
Vibrated Cement concrete in CC M 15 using 20mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc., complete as per relevant standard specification for BASE CONCRETE FOR MEDIAN KERBWALL KERB WALLS.
Providing Barrier Type Kerb for median / islands using vibrated cement concrete of grade M20 (1:1.5:3)using 20 and 12mm ISS HBG metal from approved quarry, including cost and conveyance of all materials to work site,including hire and fuel charges of all them achineries employed for thiswork, including all labour charges fo rmixing, laying, curing, painting, including all other incidental charges etc., Complete complying with standard specification and as directed by SIPCOT officers.
Filling with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 407 for Median and Traffic Island etc., Complete complying with standard specification and as directed by SIPCOT officers.
Part - B - Construction of Single Cell Box Culverts ( 1 x 2.00 x 2.00) at Ch 0 + 060, 4+240.
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., Complete complying with standard specification and as directed by SIPCOT officers. dressing the bed up to sill level .
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., Complete complying with standard specification and as directed by SIPCOT officers for foundation
Vibrated Cement concrete in CC M15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., Complete complying with standard specification and as directed by SIPCOT officers. for foundation.
Vibrated Reinforced Cement concrete in M 25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CELL BOX
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant steel (TMT Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., Complete complying with standard specification and as directed by SIPCOT officers.
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., Complete complying with standard specification and as directed by SIPCOT officers.
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, complete as per relevant standard specification, wearing coat of 75mm uniform thickness over deck slab and approach slab
Vibrated cement concrete of grade M20 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc, complete as per relevent standard specifications for Wings walls, & parapet wall.
Part C - Construction of Minor Bridges at Ch 0+780 (7 Spans x 8.60 m)
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specification for dressing the bed up to sill level and Flexible Aprons.
Earthwork excavation in all classes of soil not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of Abutments, Pier and Wing Walls
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of toe walls of Revetment
Vibrated Cement concrete in CC M 10 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for LEVELLING COURSE FOR FOOTINGS OF ABUTMENTS, PIER AND WING WALLS- BELOW SILL.
Vibrated Cement concrete in CC M 20 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for ABUTMENTS, PIER AND WING WALLS- BELOW SILL.
Vibrated Cement concrete in M 15 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for TOE WALLS OF REVETMENT..
Vibrated Cement concrete in CC M 20 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc., complete as per relevant standard specification for SUBSTRUCTURE OF ABUTMENT, PIER & WINGS - ABOVE SILL LEVEL..
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for BED BLOCK CUM DIRT WALL
Providing and fixing PVC seepage pipes of 100mm dia at 1.0 m c/c to drain the back fill behind the abutments and wings placed inclined position including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, etc., Complete complying with standard specification and as directed by SIPCOT officers.
Providing and fixing KRAFT PAPER for full width of seating of deck slab including cost and conveyance to work site labour for fixing the same in correct position and all other incidental charges etc., Complete complying with standard specification and as directed by SIPCOT officers.
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for DECK SLAB AND SAFETY KERB
Providing filter media behind abutment and wings for 600 mm thick using filter material conforming to claise 309.3.2.8 of MOST/1997 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to work site including all other incidental charges, etc., Complete complying with standard specification and as directed by SIPCOT officers.
Filling behind Abutments and Wing wall with clean Gritty Gravel including cost and conveyance of Gravel having phi value more that 35 and confirming to appendex-6 of IRC 78-200 including cost and conveyance of gravel to work site, laying, Handling charges and filling in layers tamping under optimum moisture content to get the Maximum density, including watering with all leads for water and all other incidental charges, etc., Complete complying with standard specification and as directed by SIPCOT officers.
Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including Shalimar pad and joint sealant and fixing them in position etc., Complete complying with standard specification and as directed by SIPCOT officers.
Vibrated Cement concrete in CC 1:2:4 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for BASE COURSE OR APPROACH SLAB
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for APPROACH SLAB
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, complete as per relevant standard specification, wearing coat of 75mm uniform thickness over deck slab and approach slab
Vibrated Reinforced Cement concrete in M40 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CRASH BARRIER
Vibrated Cement concrete in CC M 15 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc., complete as per relevant standard specification for CRASH BARRIER TYPE PARAPET WALL.
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for HAND RAILS AND POSTS.
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position tc., Complete complying with standard specification and as directed by SIPCOT officers.
Supply and fabrication of Fe – 500D steel with high strength corrosion resistant steel (TMT ) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges tc., Complete complying with standard specification and as directed by SIPCOT officers.
Supplying and fixing PVC pipes of 150mm dia for Service utlities including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, etc. complete for Safety Kerb
Providing Gravel backing to the required thickness for Revetment slopes including cost and conveyance of gravel to work site and including labour charges for mixing with water so as to attain a plastic state and levelling and laying tc., Complete complying with standard specification and as directed by SIPCOT officers.
Manufacturing and fixing of precast cement concrete blocks of size 25cmx25cmx30cm in cement concrete 1:2:4 and fixing them in apron and revetment slopes including cost of all materials from approved source to work site including cost of moulding, mixing, laying in mould, curing with soft potable water and conveying the moulds to work site including labour charges for fixing the blocks to the correct line and level and pointing with cement mortar 1:3 to full depth and all incidental chargestc., Complete complying with standard specification and as directed by SIPCOT officers.
Part D - Construction of Minor Bridges at Ch 1+260 (1 Span x 5.60 m)
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specification for dressing the bed up to sill level and Flexible Aprons.
Earthwork excavation in SDR not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of Abutments, Pier and Wing Walls
Earthwork excavation in SDR except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of toe walls of Revetment
Vibrated Cement concrete in CC M 10 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for LEVELLING COURSE FOR FOOTINGS OF ABUTMENTS, PIER AND WING WALLS- BELOW SILL.
Vibrated Cement concrete in CC M 20 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for ABUTMENTS, PIER AND WING WALLS- BELOW SILL.
Vibrated Cement concrete in M 15 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for TOE WALLS OF REVETMENT..
Vibrated Cement concrete in CC M 20 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc., complete as per relevant standard specification for SUBSTRUCTURE OF ABUTMENT, PIER & WINGS - ABOVE SILL LEVEL..
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for BED BLOCK CUM DIRT WALL
Providing and fixing PVC seepage pipes of 100mm dia at 1.0 m c/c to drain the back fill behind the abutments and wings placed inclined position including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, tc., Complete complying with standard specification and as directed by SIPCOT officers.
Providing and fixing KRAFT PAPER for full width of seating of deck slab including cost and conveyance to work site labour for fixing the same in correct position and all other incidental charges tc., Complete complying with standard specification and as directed by SIPCOT officers.
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for DECK SLAB AND SAFETY KERB
Providing filter media behind abutment and wings for 600 mm thick using filter material conforming to claise 309.3.2.8 of MOST/1997 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to work site including all other incidental charges, tc., Complete complying with standard specification and as directed by SIPCOT officers.
Filling behind Abutments and Wing wall with clean Gritty Gravel including cost and conveyance of Gravel having phi value more that 35 and confirming to appendex-6 of IRC 78-200 including cost and conveyance of gravel to work site, laying, Handling charges and filling in layers tamping under optimum moisture content to get the Maximum density, including watering with all leads for water and all other incidental charges, tc., Complete complying with standard specification and as directed by SIPCOT officers.
Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including Shalimar pad and joint sealant and fixing them in position tc., Complete complying with standard specification and as directed by SIPCOT officers.
Vibrated Cement concrete in CC 1:2:4 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for BASE COURSE OR APPROACH SLAB
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for APPROACH SLAB
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, complete as per relevant standard specification, wearing coat of 75mm uniform thickness over deck slab and approach slab
Vibrated Reinforced Cement concrete in M40 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CRASH BARRIER
Vibrated Cement concrete in CC M 15 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc., complete as per relevant standard specification for CRASH BARRIER TYPE PARAPET WALL.
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for HAND RAILS AND POSTS.
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position tc., Complete complying with standard specification and as directed by SIPCOT officers.
Supply and fabrication of Fe – 500D steel with high strength corrosion resistant steel (TMT ) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges tc., Complete complying with standard specification and as directed by SIPCOT officers.
Supplying and fixing PVC pipes of 150mm dia for Service utlities including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, etc. complete for Safety Kerb
Providing Gravel backing to the required thickness for Revetment slopes including cost and conveyance of gravel to work site and including labour charges for mixing with water so as to attain a plastic state and levelling and laying tc., Complete complying with standard specification and as directed by SIPCOT officers.
Manufacturing and fixing of precast cement concrete blocks of size 25cmx25cmx30cm in cement concrete 1:2:4 and fixing them in apron and revetment slopes including cost of all materials from approved source to work site including cost of moulding, mixing, laying in mould, curing with soft potable water and conveying the moulds to work site including labour charges for fixing the blocks to the correct line and level and pointing with cement mortar 1:3 to full depth and all incidental charges tc., Complete complying with standard specification and as directed by SIPCOT officers.
Part E - Construction of Minor Bridges at Ch 4+000 (7 Spans x 8.60 m)
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specification for dressing the bed up to sill level and Flexible Aprons.
Earthwork excavation in all classes of soil not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of Abutments, Pier and Wing Walls
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of toe walls of Revetment
Vibrated Cement concrete in CC M 10 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for LEVELLING COURSE FOR FOOTINGS OF ABUTMENTS, PIER AND WING WALLS- BELOW SILL.
Vibrated Cement concrete in CC M 20 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for ABUTMENTS, PIER AND WING WALLS- BELOW SILL.
Vibrated Cement concrete in M 15 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for TOE WALLS OF REVETMENT..
Vibrated Cement concrete in CC M 20 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc., complete as per relevant standard specification for SUBSTRUCTURE OF ABUTMENT, PIER & WINGS - ABOVE SILL LEVEL..
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for BED BLOCK CUM DIRT WALL
Providing and fixing PVC seepage pipes of 100mm dia at 1.0 m c/c to drain the back fill behind the abutments and wings placed inclined position including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, tc., Complete complying with standard specification and as directed by SIPCOT officers.
Providing and fixing KRAFT PAPER for full width of seating of deck slab including cost and conveyance to work site labour for fixing the same in correct position and all other incidental charges tc., Complete complying with standard specification and as directed by SIPCOT officers.
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for DECK SLAB AND SAFETY KERB
Providing filter media behind abutment and wings for 600 mm thick using filter material conforming to claise 309.3.2.8 of MOST/1997 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to work site including all other incidental charges,tc., Complete complying with standard specification and as directed by SIPCOT officers.
Filling behind Abutments and Wing wall with clean Gritty Gravel including cost and conveyance of Gravel having phi value more that 35 and confirming to appendex-6 of IRC 78-200 including cost and conveyance of gravel to work site, laying, Handling charges and filling in layers tamping under optimum moisture content to get the Maximum density, including watering with all leads for water and all other incidental charges, tc., Complete complying with standard specification and as directed by SIPCOT officers.
Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including Shalimar pad and joint sealant and fixing them in position tc., Complete complying with standard specification and as directed by SIPCOT officers.
Vibrated Cement concrete in CC 1:2:4 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for BASE COURSE OR APPROACH SLAB
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for APPROACH SLAB
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, complete as per relevant standard specification, wearing coat of 75mm uniform thickness over deck slab and approach slab
Vibrated Reinforced Cement concrete in M40 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CRASH BARRIER
Vibrated Cement concrete in CC M 15 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc., complete as per relevant standard specification for CRASH BARRIER TYPE PARAPET WALL.
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for HAND RAILS AND POSTS.
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position tc., Complete complying with standard specification and as directed by SIPCOT officers.
Supply and fabrication of Fe – 500D steel with high strength corrosion resistant steel (TMT ) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges tc., Complete complying with standard specification and as directed by SIPCOT officers.
Supplying and fixing PVC pipes of 150mm dia for Service utlities including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, tc., Complete complying with standard specification and as directed by SIPCOT officers. for Safety Kerb
Providing Gravel backing to the required thickness for Revetment slopes including cost and conveyance of gravel to work site and including labour charges for mixing with water so as to attain a plastic state and levelling and laying tc., Complete complying with standard specification and as directed by SIPCOT officers.
Manufacturing and fixing of precast cement concrete blocks of size 25cmx25cmx30cm in cement concrete 1:2:4 and fixing them in apron and revetment slopes including cost of all materials from approved source to work site including cost of moulding, mixing, laying in mould, curing with soft potable water and conveying the moulds to work site including labour charges for fixing the blocks to the correct line and level and pointing with cement mortar 1:3 to full depth and all incidental charges tc., Complete complying with standard specification and as directed by SIPCOT officers.
Part - F - Construction of Single Cell Box Culverts(1x2.00x2.00) AT Ch 0+400, 0+980, 1+360, 1+520, 1+780, 2+000, 2+400, 2+520, 2+800, 3+000, 3+280, 3+500, 3+860.
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specification for dressing the bed up to sill level .
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation
Vibrated Cement concrete in CC M15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for foundation.
Vibrated Reinforced Cement concrete in M 25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CELL BOX
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant steel (TMT Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete.
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position tc., Complete complying with standard specification and as directed by SIPCOT officers.
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, complete as per relevant standard specification, wearing coat of 75mm uniform thickness over deck slab and approach slab
Vibrated cement concrete of grade M20 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc, complete as per relevent standard specifications for Wings walls, & parapet wall.
Sub Total of Total Amount in Column BA (ie. Qty x Unit Rate)
Added GST of 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Technicalannexure1.pdf
Tender Documents • 0.61 MB
Technicalannexure2.pdf
Tender Documents • 1.19 MB
BOQ_766862.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid