| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.6 LAccepted-AOC H 29 COOLIE LINE METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹7.6 L Quoted ₹6.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹7.1 LRejected-AOC 72 133 THOTTILPATTY SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹7.1 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KSS Engineering Contractor L2 | MEGALA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. | 1 | No | 14,100 ₹14,100 | 14,053 ₹14,053 |
| 2.00 | Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate and transporting of scrap to Central Stores/M.T.P.S-I. | 100 | M2 | 1,200 ₹1.2 L | 1,147 ₹1.1 L |
| 3.00 | Charges for transporting of 6mm M.S./ Chequered plates from Central Stores/MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 metre level and welding the same. | 100 | M2 | 2,500 ₹2.5 L | 2,257 ₹2.3 L |
| 4.00 | Charges transporting the materials to outside workshop cutting in to required size, bending to the required size and profile, transporting back to MTPS boiler area. | 1.5 | Ton | 22,000 ₹33,000 | 21,433 ₹32,149.50 |
| 5.00 | Charges for transporting the refractory from store and unloading at site,leading, lifting , stacking at 7m to 52m and removing the waste refractory from boiler lowering to the ground floor,loading to tipper and disposing at waste disposal area of MTPS-I | 1,000 | Kgs | 5 ₹5,000 | 4 ₹4,000 |
| 6.00 | Charges for chipping removal of old defective refractory, cleaning, surface preparation, mixing the refractory with water application and curing the patch worked refractory in Boiler at various elevation | 1,000 | Kgs | 18 ₹18,000 | 17.65 ₹17,650 |
| 7.00 | HR Sheet 3.15mm thickness Material IS 2062 | 2.5 | Tons | 77,000 ₹1.9 L | 76,398 ₹1.9 L |
| 8.00 | Wire Mesh Length :2500mmwidth:750mm, weaving squaregap:16mm, Material : SS316 | 6 | Nos. | 11,700 ₹70,200 | 11,517 ₹69,102 |
| 9.00 | Cutting Gas | 1 | Set | 4,000 ₹4,000 | 3,949 ₹3,949 |
| 10.00 | Ms welding electrode 4 mm | 6 | Kgs | 500 ₹3,000 | 481 ₹2,886 |
Tender Value
Refer Docs
EMD Value
₹7,200
Closing Date
19 Aug 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM AOH 2025 Unit IV Boiler pressure parts Cutting and removing of heavily worn out CRH and HRH tubes roof plate and fabrication and erection of new HR Sheet and allied works in the penthouse area at 52 mtr level
2025_EB_589357_1
CE / MTPS-I / SE / M-I / BM /OT.233/ 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹7,200
Yes
14 May 2026
5 Aug 2025
20 Aug 2025
5 Aug 2025
19 Aug 2025
5 Aug 2025
Amount
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.
Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate and transporting of scrap to Central Stores/M.T.P.S-I.
Charges for transporting of 6mm M.S./ Chequered plates from Central Stores/MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 metre level and welding the same.
Charges transporting the materials to outside workshop cutting in to required size, bending to the required size and profile, transporting back to MTPS boiler area.
Charges for transporting the refractory from store and unloading at site,leading, lifting , stacking at 7m to 52m and removing the waste refractory from boiler lowering to the ground floor,loading to tipper and disposing at waste disposal area of MTPS-I
Charges for chipping removal of old defective refractory, cleaning, surface preparation, mixing the refractory with water application and curing the patch worked refractory in Boiler at various elevation
HR Sheet 3.15mm thickness Material IS 2062
Wire Mesh Length :2500mmwidth:750mm, weaving squaregap:16mm, Material : SS316
Cutting Gas
Ms welding electrode 4 mm
T & P's and consumables
KSS Engineering Contractor (BID ID -1431061)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_704042.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid