Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹33.1 L+₹6,435 (0.19%)Rejected-Finance | L2 | Rejected-Finance Being not lowest | |
| 3 | L3₹34.8 L+₹1.7 L (5.24%)Rejected-Finance A 303 SHREE KRISHNA COMPLEX CO OP HSG SOC LTD WESTERN EXPRESS HIGHWAY OPP NATIONAL PARK BORIVALI E MUMBAI 400066 | MUMBAI SUBURBAN | MAHARASHTRA | 400066 | L3 | Rejected-Finance Being not lowest | |
| 4 | L4₹34.8 L+₹1.8 L (5.41%)Rejected-Finance 46 HUSENI LAKDA BAZAAR 242 BELLASIS ROAD MUMBAI 400008 | MUMBAI | MAHARASHTRA | 400008 | L4 | Rejected-Finance Being not lowest | |
| 5 | L5₹38.6 L+₹5.5 L (16.8%)Rejected-Finance FLAT NO 002 MAHAVIR VILLA CHS LTD PLOT NO 259 SECTOR 21 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L5 | Rejected-Finance Being not lowest |
| Sl No | Description | Qty | Unit | RAJENDRA CONSTRUCTION L5 | SUNRISE CONSTRUCTION CO L8 | Nilesh Construction L3 | Unitech Enterprises L4 | Sri Krishna Construction L7 | M/S S J CONSTRUCTION L6 | Bob Enterprises L10 | binta construction L1 | vikas construction & co L2 | SAHU AND SAHU CO. L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (un-reinforced) in ground floor & pavings n.exc 15 cm thickness (below or above GL) and removing debries out side MOD land, complete all as specified and directed. | 50 | Cum | 651 ₹32,550 | 300 ₹15,000 | 167 ₹8,350 | 300 ₹15,000 | 250 ₹12,500 | 180 ₹9,000 | 475 ₹23,750 | 350 ₹17,500 | 140 ₹7,000 Lowest | 200 ₹10,000 |
| 2.00 | Demolition of brickwork or stone boulders masonry built in CM incl all quins, arches, pillers etc, complete all as specified and directed. | 58 | Cum | 451 ₹26,158 | 10 ₹580 Lowest | 116 ₹6,728 | 150 ₹8,700 | 250 ₹14,500 | 180 ₹10,440 | 350 ₹20,300 | 350 ₹20,300 | 100 ₹5,800 | 200 ₹11,600 |
| 3.00 | M & L Sub base 100 mm thick cement concrete type D-2, 1:4:8 (40 mm graded aggregate), complete all as specified and directed. | 250 | Sqm | 399 ₹99,750 | 400 ₹1,00,000 | 230 ₹57,500 | 260 ₹65,000 | 350 ₹87,500 | 360 ₹90,000 | 520 ₹1,30,000 | 400 ₹1,00,000 | 200 ₹50,000 Lowest | 400 ₹1,00,000 |
| 4.00 | M&L for brick work with Sub class 'B' brick, straight or curved on plan exc 6m mean radius built in CM (1:4), complete all as specified and directed. | 40 | Cum | 6,501 ₹2,60,040 | 4,000 ₹1,60,000 | 3,960 ₹1,58,400 | 5,200 ₹2,08,000 | 4,500 ₹1,80,000 | 3,600 ₹1,44,000 Lowest | 6,000 ₹2,40,000 | 4,000 ₹1,60,000 | 4,500 ₹1,80,000 | 6,000 ₹2,40,000 |
| 5.00 | M & L for Pre-cast cement concrete block masonry with solid blocks type C1 (1:3:6) (20 mm graded aggregate) exc. 10 cm in width and setting in mortar (1:6), complete all as specified and directed by Engr In Charge. | 2 | Cum | 6,000 ₹12,000 | 5,000 ₹10,000 | 2,890 ₹5,780 Lowest | 7,000 ₹14,000 | 4,500 ₹9,000 | 6,300 ₹12,600 | 6,500 ₹13,000 | 3,000 ₹6,000 | 3,800 ₹7,600 | 7,000 ₹14,000 |
| 6.00 | M & L for Pre-cast cement concrete block masonry with hollow blocks type C1 (1:3:6) (16 mm graded aggregate) exc. 10 cm in width and setting in mortar (1:6), complete all as specified and directed by Engr In Charge. | 2 | Cum | 6,000 ₹12,000 | 5,000 ₹10,000 | 2,800 ₹5,600 Lowest | 7,000 ₹14,000 | 4,500 ₹9,000 | 5,400 ₹10,800 | 6,000 ₹12,000 | 3,000 ₹6,000 | 3,800 ₹7,600 | 7,000 ₹14,000 |
| 7.00 | Dismantling fencing wire mess any type any description including removing debris/rubbish materials off the site out side MOD land, complete all as specified and directed. | 600 | Sqm | 15 ₹9,000 | 50 ₹30,000 | 10 ₹6,000 | 10 ₹6,000 | 10 ₹6,000 | 9 ₹5,400 Lowest | 35 ₹21,000 | 15 ₹9,000 | 10 ₹6,000 | 10 ₹6,000 |
| 8.00 | Dismantling RCC post any section, including taking out embedded portion and making good disturbed ground; posts embedded in natural ground including removing debris/rubbish materials off the site out side MOD land, complete all as specified and directed. | 400 | RM | 25 ₹10,000 | 50 ₹20,000 | 18 ₹7,200 | 12 ₹4,800 | 10 ₹4,000 | 9 ₹3,600 Lowest | 40 ₹16,000 | 15 ₹6,000 | 100 ₹40,000 | 10 ₹4,000 |
| 9.00 | Dismantling structural or mild steel work including doors, gates but excluding framed trusses including removing debris/rubbish materials off the site out side MOD land, complete all as specified and directed. | 110 | Qtl | 501 ₹55,110 | 70 ₹7,700 | 110 ₹12,100 | 200 ₹22,000 | 70 ₹7,700 | 90 ₹9,900 | 150 ₹16,500 | 325 ₹35,750 | 50 ₹5,500 Lowest | 100 ₹11,000 |
| 10.00 | S&F in repair Galvanised, 2 strand, steel barbed wire 2.24mm dia barbed with 2mm dia barbs at 75mm spacings and straining and fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of galvanised mild steel wire, staples or steel pins, etc. as directed (each line wire to be measured), complete all as specified and directed. | 64 | 100 RM | 2,500 ₹1,60,000 | 1,400 ₹89,600 | 2,200 ₹1,40,800 | 1,200 ₹76,800 Lowest | 1,500 ₹96,000 | 1,350 ₹86,400 | 2,500 ₹1,60,000 | 2,000 ₹1,28,000 | 1,400 ₹89,600 | 2,500 ₹1,60,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
4 Oct 2025, 6:00 pmClosed
Kameshwar Prasad, IDSE, EE
GE(West), Colaba, Mumbai - 400005
REPAIR TO BRICKWORK, VIEW CUTTER, CHAIN LINK FENCING ETC AND CERTAIN MISC WORKS OF AREA-III UNDER AGE (B/R) CENTRAL AT GE (WEST) COLABA, MUMBAI
2025_MES_709668_2
8977/E8
Open Tender
Civil Works
Item Rate
180 days
GE(West), Colaba
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (W) Colaba, Mumbai
₹90,000
Yes
3 Nov 2025
19 Sept 2025
6 Oct 2025
19 Sept 2025
4 Oct 2025
27 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .