| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.6 LAccepted-AOC KARMALA | KARMALA | MAHARASHTRA | ₹19.6 L | 1 | Accepted-AOC re |
| 2 | 2₹19.6 LSame as 1Rejected-AOC | ₹19.6 LSame as 1 | 2 | Rejected-AOC ac |
| 3 | 3₹19.6 LSame as 1Rejected-AOC | ₹19.6 LSame as 1 | 3 | Rejected-AOC ac |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹19.6 L
EMD Value
₹20,000
Closing Date
24 Mar 2026, 6:00 pmClosed
Add CEO ZP SOLAPUR
EE2 ZP Solapur
STBT and WBM to Mangi Pothare to Nilaj Road V.R. 27 Ch.0/00 to 7/00 Tal Karmala Dist Solapur
2026_SOLAP_1287682_1
STBT and WBM to Mangi Pothare to Nilaj Road V.R. 27 Ch.0/00 to 7/00 Tal Karmala Dist Solapur
Open Tender
Civil Works - Roads
Percentage
180 days
Zp solapur
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹20,000
17 Sept 2026
17 Mar 2026
25 Mar 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | 210 | Square meter | 7 | ₹1,470 |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 30.38 | Cubic meter | 119 | ₹3,615.22 |
| 3 | Picking the road surface including sectioning etc. complete (BT) surface.) | 1,866 | Square meter | 44 | ₹82,104 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate) | 140.18 | Cubic meter | 2,770.85 | ₹3,88,403.9 |
| 5 | Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials,preparing the existing road surface, spreading 40 mm. stone metal layers 30% crusher broken metal + 70% Hand broken (bybreaking rubble obtained by blasting) heating and spraying the bitumen of VG-30 grade @ 2 Kg/sqm, spreading 12 mm.sizechips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as perTechnical Specification Clause 506 etc. complete. Including picking of existing WBM surface. | 1,869 | Square meter | 284.2 | ₹5,31,169.8 |
| 6 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 3.00 kg/10 sqm.VG-30 bulk bitumen | 1,869 | Square meter | 21.9 | ₹40,931.1 |
| 7 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previouslyprepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired ompaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix typehot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | 1,869 | Square meter | 199.95 | ₹3,73,706.55 |
| 8 | Providing bituminous Type A liquid seal coat on bituminous surfaceincluding supplying all materials and bitumen of specified gradepreparing existing road surface, heating and applying bitumen @ 0.98KgSqm. by mechanical means, spreading chips and rolling, by staticroller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumenrates are considered to arrive at rates) | 1,869 | Square meter | 81.75 | ₹1,52,790.75 |
| 9 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 18.69 | Cubic meter | 638.3 | ₹11,929.83 |
| 10 | Spreading hard murum for side width etc. complete | 18.69 | Cubic meter | 79 | ₹1,476.51 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
SBD.pdf
Tender Documents • 2.02 MB
BOQ_2214145.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .