Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | -15.75% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 L+₹26,172.50 (5.64%)Admitted-Finance | -11.00% | ₹4.9 L+₹26,172.50 (5.64%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 L+₹1.0 L (22.3%)Admitted-Finance | +3.00% | ₹5.7 L+₹1.0 L (22.3%) | L3 | Admitted-Finance |
| 4 | L4₹5.8 L+₹1.1 L (24.6%)Admitted-Finance | +4.99% | ₹5.8 L+₹1.1 L (24.6%) | L4 | Admitted-Finance |
Tender Value
₹5.5 L
EMD Value
₹11,020
Closing Date
15 Apr 2026, 6:00 pmClosed
Executive Engineer
EE PWD ELE DIV. BARAN
5. ALL IN ALL COMPREHENSIVE MAINTAINANCE OF 21 NOS. OF AIR COOLING MACHINE IN SRG HOSPITAL, JHALAWAR
2026_CEPWD_549613_5
NITNO44/2025-26 EE PWD ELE.DIV. BARAN
Open Tender
Electrical Works
Percentage
365 days
BARAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
AS PER TENDER NIT
₹11,020
Yes
EE PWD ELE DIV. BARAN
21 Apr 2026
6 Apr 2026
16 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | All in all comprehensive maintenance of central air cooling plant including motor with blower, air washer section with nozzles, drift eliminators, starter panel, water pump, ducting, grills etc. complete in all respect as per OEM's guidelines and standard terms & conditions of PWD to meet efficient performance of the equipment.(10000 CFM) | 600 | per 100 CFM per Year | - | - |
| 2 | All in all comprehensive maintenance of central air cooling plant including motor with blower, air washer section with nozzles, drift eliminators, starter panel, water pump, ducting, grills etc. complete in all respect as per OEM's guidelines and standard terms & conditions of PWD to meet efficient performance of the equipment.(20000 CFM) | - | per 100 CFM per Year | - | - |
| 3 | All in all comprehensive maintenance of central air cooling plant including motor with blower, air washer section with nozzles, drift eliminators, starter panel, water pump, ducting, grills etc. complete in all respect as per OEM's guidelines and standard terms & conditions of PWD to meet efficient performance of the equipment.(25000 CFM) | - | per 100 CFM per Year | - | - |
stage.html
html • 0.03 MB
techsummary_979831.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.74 MB
Tendernotice_2.pdf
PDF • 0.46 MB
BOQ_979831.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .