| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.6 L+₹14,835.13 (2.29%)Admitted-Fee/PreQual/Technical/Finance PASUMALAITHANGAL GINGEE VILUPPURAM | ₹6.6 L+₹14,835.13 (2.29%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | R SELVARAJ L2 | RENGASAMY S L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of cremation shed and Compound wall@Keelapuliyur BC Buriyal ground in Keelapuliyur pt Earth work excavation and deposting on bank with intial lead and lift in stiff clay black cotton soils and ordinary gravely soil etc complete | 4.84 | cum | 270 ₹1,306.8 | 263 ₹1,272.92 Lowest |
| 2.00 | Filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete | 1.9 | cum | 1,750 ₹3,325 | 1,689 ₹3,209.1 Lowest |
| 3.00 | Foundation concrete in C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete | 6.43 | sqm | 5,350 ₹34,400.5 | 5,298 ₹34,066.14 Lowest |
| 4.00 | Supplying and fabrication of steel for R.C.C. works including cost and conveyance to site and all labour charges etc., complete. | 492 | sqm | 95 ₹46,740 | 92 ₹45,264 Lowest |
| 5.00 | Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel angles etc.,complete complying with standard specifications for all R.C.C. Works | 20.7 | cum | 600 ₹12,420 | 547 ₹11,322.9 Lowest |
| 6.00 | concrete in C.C.1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete | 1.41 | cum | 6,125 ₹8,636.25 | 6,054 ₹8,536.14 Lowest |
| 7.00 | concrete in C.C.1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete | 3.53 | cum | 6,750 ₹23,827.5 | 6,606 ₹23,319.18 Lowest |
| 8.00 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel angles etc.,complete complying with standard specifications for all R.C.C. Works | 43.66 | sqm | 1,125 ₹49,117.5 | 1,095 ₹47,807.7 Lowest |
| 9.00 | R.C.C.1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 6.6 | cum | 9,125 ₹60,225 | 9,048 ₹59,716.8 Lowest |
| 10.00 | Plastering in c.m(1:3) to 10 mm thick including cost and coveyance to site and all labour charges etc complete | 66.12 | sqm | 350 ₹23,142 | 324 ₹21,422.88 Lowest |
Tender Value
₹6.5 L
EMD Value
₹6,540
Closing Date
11 Aug 2026, 3:00 pmClosed
BDO VP Veppur
Block Development office Veppur
Construction of cremation shed and Compound wall at Keelapuliyur BC Buriyal ground in Keelapuliyur pt
2026_RDTN_688547_1
A4/209/2026
Open Tender
Civil Works
Item Rate
180 days
Block Development office Veppur
As Per Tender Documents
2 documents required · 2 mandatory
₹0
₹6,540
17 Sept 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of cremation shed and Compound wall@Keelapuliyur BC Buriyal ground in Keelapuliyur pt Earth work excavation and deposting on bank with intial lead and lift in stiff clay black cotton soils and ordinary gravely soil etc complete | 1 | cum | - | - |
| 2 | Filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete | - | cum | - | - |
| 3 | Foundation concrete in C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete | 1 | sqm | - | - |
| 4 | Supplying and fabrication of steel for R.C.C. works including cost and conveyance to site and all labour charges etc., complete. | - | sqm | - | - |
| 5 | Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel angles etc.,complete complying with standard specifications for all R.C.C. Works | 1 | cum | - | - |
| 6 | concrete in C.C.1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete | 1 | cum | - | - |
| 7 | concrete in C.C.1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete | 1 | cum | - | - |
| 8 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel angles etc.,complete complying with standard specifications for all R.C.C. Works | 1 | sqm | - | - |
| 9 | R.C.C.1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 1 | cum | - | - |
| 10 | Plastering in c.m(1:3) to 10 mm thick including cost and coveyance to site and all labour charges etc complete | - | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_827717.xls
BOQ • 0.27 MB
Part.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .