Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.3 CrAccepted-AOC M THERWADI PO BENWADI TA KARJAT DIST AHILYANAGAR 414 402 | AHILYANAGAR | AHILYANAGAR | MAHARASHTRA | 414402 | L1 | Accepted-AOC Ist Lowest Accept | |
| 2 | L2₹33.0 Cr+₹1.5 Cr (4.88%)Rejected-Finance GAT NO 562 1 A SURLI ROAD KARMALA CHOWK TEMBHURNI TAL MADHA DIST SOLAPUR 413 211 | TEMBHURNI | SOLAPUR | MAHARASHTRA | 413211 | L2 | Rejected-Finance L2 |
Tender Value
₹27.2 Cr
EMD Value
₹13.6 L
Closing Date
20 Jul 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engr.P.W.Division A.nagar
Executive Engr. P.W.Division A.nagar
Concreting with Improvement to Nimgaon Khalu Kautha Ajnuj Pedgaon Shedgaon Road MDR 03 Km. 0/00 to 11/000,Tal. Shrigonda, Dist. Ahmednagar
2023_PWR_922555_1
E-Tender Notice No.11 for 2023-24
Open Tender
Civil Works
Item Rate
730 days
Shrigonda
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,540
₹13.6 L
Chief Engineer.P.W.Region Office, Bandhkam Bhavan,
7 Oct 2023
5 Jul 2023
24 Jul 2023
5 Jul 2023
20 Jul 2023
5 Jul 2023
12 Jul 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Concreting with Improvement to Nimgaon Khalu kautha Ajnuj Pedgaon Shedgaon Road MDR 03 Km 0/00 to 11/000 Tal. Shrigonda Dist.Ahmednagar. | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 milimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 milimetre in thickness. | 24,248 | One Square Metre | - | - |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metre, stacking serviceable and unserviceable materials separately etc. complete. | 2,112.99 | One Cubic Metre | - | - |
| 4 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres,stacking servicable and unserviceable materials seperately. | 16.87 | One Cubic Metre | - | - |
| 5 | Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 8,580.39 | One Cubic Metre | - | - |
| 6 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 12,870.59 | One Cubic Metre | - | - |
| 7 | Excavation for catch/ side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 11,676.15 | One Cubic Metre | - | - |
| 8 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50 metre including all lifts, laying in layers of 20 centimetre to 30 centimetre thickness breaking clods, dressing to the required lines, curves, grades and section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97% of standard proctor density etc. complete (Material obtained from Other sources). | 7,130.19 | One Cubic Metre | - | - |
| 9 | Watering and compacting of embankment formed of materials obtained from the road cutting, within a lead of 50 metre, not less than 97 percent of standard proctor density after laying them in layers of 20 centimetre to 30 centimetre with vibratory roller. | 19,305.88 | One Cubic Metre | - | - |
| 10 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centimetre to 30 centimetre breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of over 300 metre to 500 metre inclusive from the site of excavation to the site of deposition as directed. | 2,112.99 | One Cubic Metre | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT.pdf
Tender Notice • 5.13 MB
BOQ_1607394.xls
BOQ Document • 0.29 MB
124432209.pdf
Tender Document • 0.72 MB
124432211.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .