| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹25.7 L+₹50,261.50 (1.99%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹25.2 L
EMD Value
₹26,000
Closing Date
6 Oct 2023, 5:00 pmClosed
se edc
sonbhadra
Capacity enhancement of 11/0.4 KV Sub-station
2023_PVVNV_825931_2
58/edc(so)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased ref Tender Doc.
2 documents required · 2 mandatory
₹3,540
SE EDC SONEBHADRA Bank A/c No.089105000853
₹26,000
25 Oct 2023
9 Sept 2023
7 Oct 2023
9 Sept 2023
6 Oct 2023
9 Sept 2023
Amount
Supply of following materials as per RESSPO/PuVVNL norms at the work site.
PCC Pole 805 Mtr Long
Top Channel MS 125x65x2240 mm Long
MS Angle 75x75x6,2080mm.with Clampe & boltand Nut (TF Base)
ACSR Weasel conductor
11 K.V. Disc Insulator T&C Type 4500Kg. With Fitting
11 K.V. Pin Insulator With pin
LT PVC Cable Al. 1X240 sq.mm
LT PVC Cable Al. 1X400 sq.mm
LT PVC Cable Al. 3.5X70 sq.mm
LT PVC Cable Al. 3.5X150 sq.mm
LT XLPE Cable Al. 3.5X70 sq.mm.
Stay Complete
Earthing Complete
25 KVA Three Phase T/F, 11/0.4 KV
63 KVA Three Phase T/F, 11/0.4 KV
100 KVA Three Phase T/F, 11/0.4 KV
250 KVA Three Phase T/F, 11/0.4 KV
400 KVA Three Phase T/F, 11/0.4 KV
Stay Rod set Complete
Stay Wire 7/10 swg
Supply of DE-CENTRALIZED MATERIALS (Provided By Contactor)
F- Bracket/Clamp With Nut & Bolt
Al. Lug 250 sq.mm
Al. Crimping Lug 240 Sq.mm
Al. Crimping Lug 220 Sq.mm
Al. Crimping Lug 95 sq.mm
Coper L.Piece 50X225X10 Sq.mm
MS Nut & Bolt
Stay Clamp with Nut Bolt
Construction of Plinth
Work of following materials as per RESSPO/PuVVNL norms at the work site.
Shifting, loading, carriage (Sonbhadra) & Erection of Double Pole structure on 8.5 mtr. PCC Pole by erecting single pole near old installed 10 KVA Transformer including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (MS Angle 75x75x6,2080mm.with Clampe & boltand Nut (TF Base), Top channel with clamps, disc insulator T & C type, disc fitting T & C type, composite polymer pin, insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, barbed wire earthing, grouting of Stay Rod including all work as per norms etc. complete).
Shifting, loading, carriage & Laying, spreading, lifting and final sagging of 3 phases 3 wire 11 KV Line and 3 phase 4 wire 0.440 KV Line of ACSR Weasal conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos./04 Nos. conductor in parallel.
To connect the overhead line to the transformer's all phases by lugging both the ends of the LT PVC Cable Al. 1X240 sq.mm with the crimping lugs.
To connect the overhead line to the transformer's all phases by lugging both the ends of the LT PVC Cable Al. 1X400 sq.mm with the crimping lugs.
To connect the overhead line to the transformer's all phases by lugging both the ends of the LT PVC Cable Al. 3.5X70 sq.mm with the crimping lugs.
To connect the overhead line to the transformer's all phases by lugging both the ends of the LT PVC Cable Al. 3.5X150 sq.mm with the crimping lugs.
To connect the overhead line to the transformer's all phases by lugging both the ends of the LT XLPE Cable Al. 3.5X70 sq.mm with the crimping lugs.
Grouting of Stay Rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
Shifting, loading, carriage & Erection to make proper Earthing Neutral and body of Transformers and poles with help of GI wire.
Shifting, loading, carriage of Materials & Making New Plinth
Shifting, loading, carriage of Materials & Making of Double Pole carriage and resetting on new Double Pole including complete work for Establishment of 25 KVA Three Phase T/F, 11/0.4 KV
Shifting, loading, carriage of Materials & resetting on Existing Double Pole including complete work for Establishment of 63 KVA Three Phase T/F, 11/0.4 KV
SShifting, loading, carriage of Materials & resetting on Existing Double Pole including complete work for Establishment of 100 KVA Three Phase T/F, 11/0.4 KV
SShifting, loading, carriage of Materials & resetting on Existing Double Pole/Plinth including complete work for Establishment of 250 KVA Three Phase T/F, 11/0.4 KV
Shifting, loading, carriage of Materials & Making of Plinth, carriage and resetting on new plinth including complete work for Establishment of 400 KVA T/F .
Taking off the old 10 KVA Transformer currently in use from the Single Pole/Double Pole/Plinth and Receive Back it to the ESC Sonbhadra.
Taking off the old 16 KVA Transformer currently in use from the Single Pole/Double Pole/Plinth and Receive Back it to the ESC Sonbhadra.
Taking off the old 25 KVA Transformer currently in use from the Single Pole/Double Pole/Plinth and Receive Back it to the ESC Sonbhadra.
Taking off the old 63 KVA Transformer currently in use from the Single Pole/Double Pole/Plinth and Receive Back it to the ESC Sonbhadra.
Taking off the old 100 KVA Transformer currently in use from the Single Pole/Double Pole/Plinth and Receive Back it to the ESC Sonbhadra.
Taking off the old 250 KVA Transformer currently in use from the Single Pole/Double Pole/Plinth and Receive Back it to the ESC Sonbhadra.
Fixing of Coper L.Piece 50X225X10 Sq.mm
M/s ANITA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .