Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | ₹10.5 L | L1 | Accepted-AOC AOC |
| 2 | L2₹12 L+₹1.5 L (14.8%)Rejected-Finance | ₹12 L+₹1.5 L (14.8%) | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹12.8 L+₹2.3 L (22.3%)Rejected-Finance 2 SURI LANE KOLKATA 700 014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | ₹12.8 L+₹2.3 L (22.3%) | L3 | Rejected-Finance Higher than L1 |
| 4 | L4₹14.2 L+₹3.7 L (35.8%)Rejected-Finance | ₹14.2 L+₹3.7 L (35.8%) | L4 | Rejected-Finance Higher than L1 |
| 5 | L5₹15.1 L+₹4.7 L (44.7%)Rejected-Finance BIDHAN MARKET BARASAT | BARASAT | ₹15.1 L+₹4.7 L (44.7%) | L5 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | ALPHA ELECTRICALS L6 | MAHESWAR ELECTRICAL INDUSTRIES L3 | MONDAL ELECTRIC CO. L1 | KANJILAL and SONS L7 | MAA DURGA ELECTRIC CENTRE L9 | CARRYON ENGINEERS L4 | R.N.ROY ELECTRICAL CONTRACTOR L2 | TECHNO FAITH L5 | BANERJEE ENTERPRISE L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Day to day operation & maintenance of entire Electrical Installation Installation including Sub Station & compound Lights at whole campus of State Central Library,kolkata(Round the clock incl. Saturday,Sunday & others holidays) as per terms and Conditions by deputing following man power. | ||||||||||||
| 2.00Duty hrs: 10.00AM to 06.00 PM | ||||||||||||
| 3.00 | Skilled Electrician
1no x 12months =12 units | 12 | Per man power/ month/ Shift | 24,501 ₹2,94,012 | 16,500 ₹1,98,000 | 13,000 ₹1,56,000 Lowest | 20,397.45 ₹2,44,769.4 | 21,000 ₹2,52,000 | 20,500 ₹2,46,000 | 16,000 ₹1,92,000 | 21,000 ₹2,52,000 | 22,000 ₹2,64,000 |
| 4.00 | Un-Skilled Electrician
1 no. X 12 months = 12 units | 12 | Per man power/ month/ Shift | 15,496 ₹1,85,952 | 14,000 ₹1,68,000 | 11,500 ₹1,38,000 Lowest | 16,829.36 ₹2,01,952.32 | 17,500 ₹2,10,000 | 14,900 ₹1,78,800 | 14,000 ₹1,68,000 | 16,000 ₹1,92,000 | 17,500 ₹2,10,000 |
| 5.00Duty hrs: 06.00PM to 02.00 AM | ||||||||||||
| 6.00 | Semi-Skilled Electrician
1 no. X 12 months = 12 units | 12 | Per man power/ month/ Shift | 19,500 ₹2,34,000 | 16,500 ₹1,98,000 | 13,000 ₹1,56,000 Lowest | 18,509.04 ₹2,22,108.48 | 21,000 ₹2,52,000 | 17,600 ₹2,11,200 | 14,000 ₹1,68,000 | 19,000 ₹2,28,000 | 19,500 ₹2,34,000 |
| 7.00 | Unskilled/ Helper
1no x 12months =12 units | 12 | Per man power/ month/ Shift | 15,496 ₹1,85,952 | 14,000 ₹1,68,000 | 12,000 ₹1,44,000 Lowest | 16,829.36 ₹2,01,952.32 | 17,500 ₹2,10,000 | 14,900 ₹1,78,800 | 12,000 ₹1,44,000 Lowest | 16,000 ₹1,92,000 | 17,500 ₹2,10,000 |
| 8.00Duty hrs: 02.00 AM to 10.00 AM | ||||||||||||
| 9.00 | Semi-Skilled Electrician
1no x 12months =12 unit | 12 | Per man power/ month/ Shift | 19,500 ₹2,34,000 | 16,500 ₹1,98,000 | 12,000 ₹1,44,000 Lowest | 18,509.04 ₹2,22,108.48 | 21,000 ₹2,52,000 | 17,500 ₹2,10,000 | 14,500 ₹1,74,000 | 19,000 ₹2,28,000 | 19,500 ₹2,34,000 |
| 10.00 | Unskilled/ Helper
1no x 12months =12 units | 12 | Per man power/ month/ Shift | 15,496 ₹1,85,952 | 14,000 ₹1,68,000 | 12,000 ₹1,44,000 Lowest | 16,829.36 ₹2,01,952.32 | 17,500 ₹2,10,000 | 14,900 ₹1,78,800 | 12,500 ₹1,50,000 | 16,000 ₹1,92,000 | 17,500 ₹2,10,000 |
Tender Value
₹19.0 L
EMD Value
₹37,919
Closing Date
10 Jun 2025, 2:00 pmClosed
EE_KCED_PWD
Khadya_Bhawan_11A_Mirza_Ghalib_Street_Block_A_3rd_Floor_Kokata_700087
Annual Maintenance of Electrical installation in the campus of State Central library, Kolkata---Annual preventive and corrective maintenance including day to day operation of entire Electrical Installation with operator cum attendant for one no lift.
2025_PWDE_849311_1
WBPWD/EE/08/IR/T/KCED/II of 2025-26
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
State Central Library
Please refer Tender documents.
5 documents required · 5 mandatory
₹37,919
Office_of_EE_KCED_PWD
10 Sept 2026
20 May 2025
12 Jun 2025
20 May 2025
10 Jun 2025
27 May 2025
26 May 2025
Amount
Day to day operation & maintenance of entire Electrical Installation Installation including Sub Station & compound Lights at whole campus of State Central Library,kolkata(Round the clock incl. Saturday,Sunday & others holidays) as per terms and Conditions by deputing following man power.
Duty hrs: 10.00AM to 06.00 PM
Skilled Electrician 1no x 12months =12 units
Un-Skilled Electrician 1 no. X 12 months = 12 units
Duty hrs: 06.00PM to 02.00 AM
Semi-Skilled Electrician 1 no. X 12 months = 12 units
Unskilled/ Helper 1no x 12months =12 units
Duty hrs: 02.00 AM to 10.00 AM
Semi-Skilled Electrician 1no x 12months =12 unit
Unskilled/ Helper 1no x 12months =12 units
Providing lift attendent cum lift operator for 6 passenger(G+6) Kone make lift for 1 shift.
Duty hrs: 10.00 AM to 6.00 PM
Semi-Skilled Operator 1no x 12months =12 units
N.B: Submission of requisite workman permit as mention in attached terms and conditions is mandatory for claiming of bill in every occasion.
R.N.ROY ELECTRICAL CONTRACTOR (BID ID -6533635)
MAHESWAR ELECTRICAL INDUSTRIES (BID ID -6495662)
CARRYON ENGINEERS (BID ID -6531958)
TECHNO FAITH (BID ID -6541680)
ALPHA ELECTRICALS (BID ID -6493545)
KANJILAL and SONS (BID ID -6506247)
BANERJEE ENTERPRISE (BID ID -6544249)
MAA DURGA ELECTRIC CENTRE (BID ID -6516112)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .