Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹20.9 L+₹1.9 L (10.1%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
14 Jun 2024, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER, EDC, BANDA
Chilla Road, Indira Nagar, Banda
The work of bifercation of 11 KV Kanwara, Luktara, Pathari Feeders under EUDD, Banda (Business Plan 2024-25)
2024_DVVNL_920279_3
EDCBNDA-103/2023-24
Open Tender
Electrical Works
Item Rate
90 days
BANDA
As per annexured
2 documents required · 2 mandatory
₹3,540
DVVNL
₹19,000
O/O SE, EDC, BANDA
6 Oct 2024
1 May 2024
14 Jun 2024
1 May 2024
14 Jun 2024
1 May 2024
3 May 2024
The work of erection of new 11 KV OH Lines from Vll. Lama to Jamalpur due to sapration/bifercation of 11 KV Paprenda Feeder from Luktara Feeder, from Vll. Pipari to Kanwara due to sapration/bifercation of 11 KV Kanwara Feeder from Pathari Feeder, from Vll. Mavai Bypass to Kanwara Gas Godam due to sapration/ bifercation of 11 KV Kanwara Feeder from Paprenda Feeder etc. UNDER BUSINESS PLAN YEAR 2024-25 under EUDD, BANDA, including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Details of the work as given below :-
SUPPLY OF MATERIAL -
Stone Pad
Cross Arm Holding Clamp with Nut-Bolts for PCC 8.5 M Long
Cross Arm Holding Clamp with Nut-Bolts for STP 11 M Long
11 KV F-Clamp wih Nut-Bolts for PCC Poles 8.5 M Long
11 KV F-Clamp wih Nut-Bolts for STP Poles 11 M Long
MS Top Channel 100x50x2240 mm
Clamp with Nut-Bolts for Channel
MS Angle Iron 65x65x6 mm, 2700 mm Long Bracing with 4 Clamps & Nut-Bolts.
MS T-Off Channel
Danger Board with clamp & Nut/Bolt
Barbed Wire
Guarding Angle with clamp & nut-bolts
Alluminium Tape
Alluminium Paint
Red Oxide Paint
Nut, Bolt & Washer of suitable sizes
ERECTION WORK -
Erection & fixing of ST Pole 11.0 Mtr. Long as single/double pole structure with HT/LT fittings.
Erection & fixing of PCC Pole 8.5 Mtr. Long as single/double pole structure with HT/LT fittings.
Erection & fixing of Stone Pad
Erection & fixing of 11 KV V Type Cross Arm
Erection & fixing of Cross Arm Holding Clamp with Nut-Bolts for STP 11 M Long
Erection & fixing of Cross Arm Holding Clamp with Nut-Bolts for PCC 8.5 M Long
Erection & fixing of 11 KV F-Clamp wih Nut-Bolts for PCC Poles 8.5 M Long
Erection & fixing of 11 KV F-Clamp wih Nut-Bolts for STP Poles 11 M Long
Erection & fixing of MS Top Channel 100x50x2240 mm
Erection & fixing of Clamp with Nut-Bolts for Channel
Erection & fixing of MS Angle Iron 65x65x6 mm, 2700 mm Long Bracing with 4 Clamps & Nut-Bolts.
Erection & fixing of MS T-Off Channel
Erection & fixing of 11 KV Pin Insulator
Erection & fixing of 11 KV Pin with nut
Erection & fixing of Disc Insulator
Erection & fixing of Disc fitting T&C 45 KN
Laying, sagging, stringing, binding and jumpering etc. of ACSR Rabbit Conductor on the erected pole as per direction of supervising engineer/RESSPO manual.
Erection & fixing of Danger Board with clamp & Nut/Bolt
Erection & fixing of Barbed Wire
Erection & fixing of GI Wire 8 SWG for guarding
Erection & fixing of Guarding Angle with clamp & nut-bolts
Erection & fixing of Alluminium Tape
Painting of pole structure by Alluminum Paint
Painting of pole structure by Red Oxide Paint
Erection & fixing of Stay Set Complete
EARTHING OF POLE BY EARTHING ROD
Concreting/Grouting of erected 8.5/11 Mtr. long PCC/STP Poles with muffing as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast /stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm).
Chopping/cutting of tree branches in vicinity of 11 KV/LT lines during execution of work.
JMC Enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .