Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹16.5 Cr+₹55.0 L (3.28%)Accepted-AOC HOUSE NO 2103 SECTOR 9 FARIDABAD 121006 | FARIDABAD | FARIDABAD | HARYANA | 121006 | L2 | Accepted-AOC L1 after negotiation | |
| 2 | L1₹16.8 CrRejected-AOC 2743 D F BLOCK ANSAL SUSHANT CITY PANIPAT ANSAL SUSHANT C ITY F BLOCK PANIPAT PANIPAT HARYANA 132103 UDYAM HR 14 0005251 | PANIPAT | HARYANA | 132103 | L1 | Rejected-AOC rates greater than L1 | |
| 3 | L3₹17.3 Cr+₹57.3 L (3.42%)Rejected-AOC | L3 | Rejected-AOC rates greater than L1 | |
| 4 | L4₹17.9 Cr+₹1.1 Cr (6.51%)Rejected-AOC | L4 | Rejected-AOC rates greater than L1 | |
| 5 | Rejected-Technical SCO NO 27 VYAPAR SADAN SECTOR 14 GURUGRAM | GURUGRAM | GURUGRAM | HARYANA | - | Rejected-Technical Turn over is not sufficient as per eligibility criteria of tender |
Tender Value
₹19.0 Cr
EMD Value
₹19.0 L
Closing Date
8 Jan 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sandeep Dahiya
DIV 3 Faridabad
HEW 92 Construction of Gymkhana Club Building including Civil work, Electrical work, Fire Fighting, Fire alarm work, HVAC, Solar PV, Swimming Pool, Health Club Equipment, Lawn Tennis and Badminton Court in Sector-77 and 78 Faridabad
2025_HBC_491610_1
2025A0D83708 1BAA 4631 B897 FCE655B14E22250HSV
Open Tender
Civil Works
Works
730 days
Faridabad (MC)
as per dnit
2 documents required · 2 mandatory
₹3,000
Yes
₹19.0 L
Yes
16 Mar 2026
19 Dec 2025
9 Jan 2026
19 Dec 2025
8 Jan 2026
19 Dec 2025
19 Dec 2025 - 21 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.1]Providing and laying of base course of floors consisting of 100 mm thick cement 1:8:16 and 100 mm sand or stone filling. [Through Rate] | 40 | Sqm | 260 | ₹10,400 |
| 2 | [10.10.1]Providing and laying Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 1. 40 mm thick with 20 mm nominal size stone aggregate [Through Rate] | 123.02 | Sqm | 268 | ₹32,969.36 |
| 3 | [10.14]Providing a floating coat of 1.50 mm thick neat cement laid in one operation to the topping. [Through Rate] | 41 | Sqm | 29 | ₹1,189 |
| 4 | [10.2]Supplying and filling in plinth with sand (conforming to zone-IV, IS 1542) under floors, including watering, ramming, consolidating and dressing complete. [Through Rate] | 64.18 | cum | 826 | ₹53,012.68 |
| 5 | [10.22.1]Providing and fixing glass strips in joints of terrazzo/ cement concrete floors. 1. 40 mm wide and 4 mm thick [Through Rate] | 40 | Metre | 44 | ₹1,760 |
| 6 | [10.30.2]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 2. Medium shade pigment using 50% white cement 50% Grey cement [Through Rate] | 1,276.3 | Sqm | 754 | ₹9,62,330.2 |
| 7 | [10.37.1]Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 1. 25 mm thick [Through Rate] | 393.45 | Sqm | 790 | ₹3,10,825.5 |
| 8 | [10.38]Providing and fixing of Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. [Through Rate] | 11.35 | Sqm | 836 | ₹9,488.6 |
| 9 | [10.45]Extra for pre finished nosing to treads of steps of marble stone. [Through Rate] | 94.36 | Metre | 251 | ₹23,684.36 |
| 10 | [10.46]Extra for marble stone flooring in treads of steps and risers using single length up to 2.00 metre. [Through Rate] | 26.84 | Sqm | 290 | ₹7,783.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_569935.xls
BOQ • 1.21 MB
Additional Documents
Additional Documents • 10.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .