Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹4.8 LAccepted-AOC 34 1 12 2F SAINIK VIHAR DEORI ROAD AGRA UP 282007 | AGRA | UTTAR PRADESH | 282007 | I | Accepted-AOC Being lowest | |
| 2 | II₹4.9 LRejected-Finance B 35 DURGA PALACE SAINIK VIHAR DEORI ROAD AGRA UP | II | Rejected-Finance Refer itemwise comparative statement | |
| 3 | III₹5 LRejected-Finance GALI NO 2 H NO 45 2ND FLOOR NANAK VIHAR COLONY LAL KUAN GHAZIABAD UTTAR PRADESH 201009 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201009 | III | Rejected-Finance Refer itemwise comparative statement |
Tender Value
Refer Docs
Closing Date
13 Feb 2021, 9:00 amClosed
GE WEST AGRA
GE WEST AGRA
Job work for manning and operation of water supply installation of East Zone under GE (West) Agra.
2021_MES_419902_1
3340/Q/44/E3/2020-21
Limited
Miscellaneous Works
Works
30 days
GE WEST AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
24 Feb 2021
8 Feb 2021
15 Feb 2021
8 Feb 2021
13 Feb 2021
8 Feb 2021
Amount
1. Manning and operation of water supply installation including connected bore well with submersible pump set, electric control panel, internal and external electrification of water supply system, operation of valves of over head tank, above installation building with two shifts of 8 hours each (0600hrs to 1400hrs and 1400hrs to 2200hrs) every day during staggered timings in morning, evening and night depending upon the availability of water from Ganga Water/Borewell by pump operator cum technician per each shifts including holiday and sunday for following pump house: - (a) 509 ABW Pump house under GE(West) Agra. (b) ODF (MAP officer Qtr) pump house under GE (W) Agra. (c) KB Line pump house under GE (W) Agra. (d) Old BP line and new BP line (MAP PH-II) under GE (W) Agra (e) Para Bn 5 Para Pump house under GE (W) Agra. (f) MP Line under GE(W) Agra. (g) 411 PFC pump house under GE (W) Agra. (h) Amar Singh Camp(MAP PH-II) Pump house under GE(W) Agra. (j) ODF MAP (RCC tank) pump house under GE(W) Agra. Note :- At each location from Ser No (a) to (j) above total 52 shifts (one person per shift). 1.01 Semi skilled person per shift as per existing rate (Basic Rate+VDA) including GST. 1.02 Contribution towards Employees Provident Fund (EPF) as per existing rule. 1.03 Contribution towards Employees State Insurance Corporation (ESIC) as per existing rule. 1.04 Contribution towards Bonus as per existing rule. 1.05 Contractor's Over Head & Profit on Total Serial No. 1.01 to 1.04. 1.06 Labour Welfare Cess (LWC) as per existing rule on total Serial No. 1.01 to 1.05. 2. Operation and operation of Reverse Osmosis plant of capacity 1000LPH, RO plant located ODF RO Plant under GE (W) Agra in One shift of 8 hrs(0800hrs to 1600hrs) as directed by Engineer-in-Charge including sunday and holiday, replacement of consumable items for following RO plants:- (a) Reverse Osmosis plant of capacity 1000LPH, RO Plant located at ODF RO plant under GE(W) Agra. (b) Reverse Osmosis plant at 801 TA Bn (Red Fort) of capacity 1000 LPH under GE (W) Agra. (c) Reverse Osmosis plant of capacity 1000 LPH, RO Plant located at 509 ABW under GE (W) Agra Note:- At each location from ser No 2(a) to (c) above total 26 shifts(One person per shift)
M/s Lord Krishna Enterprises
M/s A K Engineering Co
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_468952.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .