Tender Value
₹23.9 L
EMD Value
₹47,860
Closing Date
24 Jun 2026, 4:00 pm
Executive Engineer PWD R and B Division Kathua
Executive Engineer PWD R and B Division Kathua
Refer to BOQ
2026_PWDJK_312362_1
E-NIT No 33/2026-27/2695-99/G Dated 13.06.2026
Open Tender
Civil Works
60 days
Kathua
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B Division Kathua
₹47,860
Executive Engineer PWD R and B Division Kathua
15 Jun 2026
15 Jun 2026
25 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 102 | Cum | 479.3 | ₹48,888.6 | BI01010001010000000000000515BI0100001114 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 15.59 | Cum | 4,826.5 | ₹75,245.14 | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position cement concrete of specified grade incl.curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 64.29 | Cum | 5,733.6 | ₹3,68,613.14 | BI01010001010000000000000515BI0100001114 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 6.45 | Cum | 6,591.25 | ₹42,513.56 | BI01010001010000000000000515BI0100001114 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete inclu. curing but excluding the cost of centering, shuttering, finishing & reinforcement. All works upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone agg. 20 mm nominal size) | 31.1 | Cum | 7,788.4 | ₹2,42,219.24 | BI01010001010000000000000515BI0100001114 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level Thermo-Mechanically Treated bars of grade Fe-500D or more incl. all leads, lifts and carriage of material by M.T. / H.L. | 2,643.36 | Kg | 123.2 | ₹3,25,661.95 | BI01010001010000000000000515BI0100001114 |
| 7Centring & shuttering incl.strutting propping etc and removal of form work for | ||||||
| 7.01 | Foundations, footings, bases of columns etc. for mass concrete. | 405 | Sqm | 286.35 | ₹1,15,971.75 | BI01010001010000000000000515BI0100001114 |
| 7.02 | Suspended floors, roofs, landings, balconies and access platfoMetres. | 102.32 | Sqm | 718.2 | ₹73,486.22 | BI01010001010000000000000515BI0100001114 |
| 8 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 945 | Kg | 181.6 | ₹1,71,612 | BI01010001010000000000000515BI0100001114 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1011044.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid