| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.0 LAdmitted-Finance | +8.15% | ₹14.0 L | L1 | Admitted-Finance |
| 2 | L2₹14.2 L+₹25,872.78 (1.85%)Admitted-Finance | +10.15% | ₹14.2 L+₹25,872.78 (1.85%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 0 BUDKIYA DEVATRA JODHPUR RAJASTHAN 342606 | JODHPUR | RAJASTHAN | 342606 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical 167 MANSAGAR VISTAR BUDHISINGHPURA SANGANER JAIPUR RAJASTHAN 302019 | JAIPUR | RAJASTHAN | 302019 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹12.9 L
EMD Value
₹25,880
Closing Date
30 Jul 2026, 3:00 pmClosed
Commissioner
office of Municipal Council Hanumangarh
Work of laying RCC pipeline near the Nath community cremation ground, Kohla, Hanumangarh Town
2026_DLB_575673_1
NIT 49/2026-27 (5725-5733 Date 16/07/2026)
Open Tender
Civil Works
Percentage
60 days
Hanumangarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Commissioner Municipal Council / MD RISL
₹25,880
Yes
6 Aug 2026
17 Jul 2026
31 Jul 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 720 | cum | 178.5 | ₹1,28,520 |
| - | Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical / vibrated casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.1000 mm internal diameter | 80 | rmt | 6,790 | ₹5,43,200 |
| - | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. | 150 | cum | 235.5 | ₹35,325 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 7.35 | cum | 4,575 | ₹33,626.25 |
| - | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 40mm thick | 26.14 | sqm | 422.5 | ₹11,044.15 |
| - | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 27.12 | cum | 5,400 | ₹1,46,448 |
| - | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 21.35 | cum | 6,300 | ₹1,34,505 |
| - | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar1:4 (1 cement : 4 fine/ coarse sand) | 223.2 | Sqm | 227 | ₹50,666.4 |
| - | Providing and fixing of reinforced Ferro-Cement drain covers designed for 'A' class loading duly marked on cover with adequate steel reinforcement having thickness 75mm to 150mm anti corrosive bitumen painted M.S. plate , Rim and M.S. lifting hooks, Admixtures like plasticizer, bond improving compound, shrinkage, resistance compound, abrasion resistant complete as per approved design etc. Standard Size 1500x600mm (125mm thick) for span 701 to 1200mm | 40.5 | sqm | 2,955 | ₹1,19,677.5 |
| - | construction of tube well from graund level and up to 100 mtr depth and abobe sizes in ali type of soils I alluvim strata by baling methodand with outgraund packing and per (IS 2800 part I & II ) 1979 specification the wori ncluding formation activity well at cavity well at caviry will be botom by developemani with approproate are compressor ar bailer pumping and aowerry all casing or pipe but exluding cost the casing pipe the tube well she have a through out bore as per omal bore as casing pipe the work should completed after obtaingsand free water 125 mm dia nominal bore. | 65 | mtr | 400 | ₹26,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
Tendernotice_2.pdf
PDF • 1.44 MB
BOQ_1023627.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .