| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-AOC | L1 | Accepted-AOC Addmited | |
| 2 | L2₹14.2 L+₹18,086.40 (1.29%)Rejected-AOC KARUR | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SPE Construction L2 | K Sundaramoorthy L1 |
|---|---|---|---|---|---|
| 1.001.Providing Paver block From Guruvinayanapalli BT Road to Periyannan House at Varattanapalli Village H/O varattanapalli Estimate Amount:1417000.00/- | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 111.54 | Cum | 124.74 ₹13,913.5 | 123.15 ₹13,736.15 Lowest |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 15.42 | Cum | 5,202.72 ₹80,225.94 | 5,136.4 ₹79,203.29 Lowest |
| 4.00 | Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification. | 27.19 | Cum | 5,941.02 ₹1,61,536.33 | 5,865.29 ₹1,59,477.24 Lowest |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge | 236.44 | Sqm | 522.7 ₹1,23,587.19 | 516.04 ₹1,22,012.5 Lowest |
| 6.00 | . Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 121.05 | Cum | 1,667.53 ₹2,01,854.51 | 1,646.28 ₹1,99,282.19 Lowest |
| 7.00 | Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504. | 806.98 | Sqm | 769.3 ₹6,20,809.71 | 759.5 ₹6,12,901.31 Lowest |
| 8.00 | Provision For Name Board Charges | 1 | Nos | 1,012 ₹1,012 | 999.1 ₹999.1 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,16,529 ₹2,16,529 | 2,13,770 ₹2,13,770 Lowest |
Tender Value
₹14.2 L
EMD Value
₹15,000
Closing Date
16 Oct 2024, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
Krishnagiri Dt Bargur Block MLACD 2024_25 Providing Paver Block Road From Guruvinayanapalli BT Road to Periyannan House at Varattanapalli Village at Varattanapalli Panchayat BRG_84
2024_RDTN_493364_1
2635_2024_R7_DT_06_08_2024
Open Tender
Civil Works - Others
Item Rate
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
15 Oct 2025
14 Oct 2024
16 Oct 2024
14 Oct 2024
16 Oct 2024
14 Oct 2024
Amount
1.Providing Paver block From Guruvinayanapalli BT Road to Periyannan House at Varattanapalli Village H/O varattanapalli Estimate Amount:1417000.00/-
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge
. Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.
Provision For Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SPE Construction (BID ID -1164175)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .