Tender Value
₹3.8 Cr
EMD Value
₹3.4 L
Closing Date
22 Dec 2025, 11:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
TENDER
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
The definition for similar nature of work will be "The tenderer should have satisfactorily executed and completed the work as mentioned below Electrical work for General Services i.e. Power Supply System (upto and including 33 KV voltage) or Air-Conditioning or Water Coolers or Air coolers/ Desert Coolers (This does not included OHE, PSI words for Electric Traction Distribution): The definition for similar nature of' work will be - "The tenderer should have satisfactorily executed and completed any work as mentioned below: 1.Electrification of service building or Staff quarters or Offices or Road and Colony Lighting or Circulating Area Lighting or Washing Pits or Sheds or Workshops or UTS/PRS or UPS or Battery charging facilities or Pre-cooling facilities or platforms and Yards etc. 2.Erection and Commissioning of LT, HT upto 33KV Overhead Lines oe Electrical Sub-station or LT/HT UG power cables. 3.Annual Electrical Maintenance contract of Service building or staff quarters or Electrical sub-station or DG set or Train lighting and/ or Air conditioning coaches excluding RMPU units of AC Coaches. 4.Erection and commissioning of any type and capacity of Electrical Pumping set. 5.Electrification of ON Grid connected or Off-Grid connected solar power plant. 6.Electrification of advance Energy metering system or Smart Energy metering system or Prepaid Energy meters. 7.Erection and commissioning or AMC/CMC of Window/Split ACs/Water Coolers/ Refrigerators/Ductable package system of air conditioning/Centralized Air Cooling unit/ Centralized air conditioning unit or hiring of desert coolers/ Air coolers. 8.Any above work or combination of (1) to (7) above, The above work must have been carried out in any of the following organization: (a)Central Government Department or State Government
10 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Goods & Services Tax (GST) registration certificate copy should be attached
The Tender/Firm must have valid Class-A Electrical Contractor License (ECL) and copy of license must be uploaded in IREPS site during bid. In case Tenderers submitted with ECL issued in the name other Firms/Tenderers will be summarily rejected. In case the ECL is not valid on the date of opening of tender, details of renewal should be submitted.
In case of Sole Proprietorship Concern firm has to submit Affidavit certifying the sole Proprietorship of the firm. This affidavit shall be notarized. Or In case of a Partnership Firm, Firm has to submit (a) Notary certified copy of the Partnership Deed. (b) A copy of power of Attorney firm has to submit (duly registered as per prevailing Law) in favour of an individual to tender for the work, sign the agreement etc., and create liability against the Firm. Or In case Tenderer is a Company registered under Companies Act-2013. The tenderer shall submit: (a)The copies of MOA (Memorandum of Association)/AOA (Articles of Association) of the company.(b) A copy of Certificate of Incorporation. (c) A copy of authorization/ Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of company and create liability against the company. Or In case Tenderer is LLP (Limited Liability Partnership); If the tender is submitted on behalf of a LLP registered under LLP Act-2008, the Tenderer shall submit along with tender: (a) A copy of LLP Agreement (b) A copy of Certificate of Incorporation (c) A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. Or In case of a tenderer is registered Society and Registered trust. The tenderer shall submit: (a) A copy of certificate of registration. (b) A copy of Memorandum of Association of Society/Trust Deed (c)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the society/ Trust.
Contractor has to submit Annual Contractual Turnover Data for the Previous 3-4 Years (Contractual Payment only) as per Annexure-VIB
Contractor should have valid EPF & ESI registration number and should submit documentary proof of registration with their tender document otherwise the tender will be summarily rejected.
The tenderers shall submit a copy of New Annexure-V(A).This certificate is to be given by attorney/authorized signatory/each member of Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc
Electrical(G) Sub-Estimate for-Improvement of Station Power supply arrangement & Electrical Assets of Raipur Division
SrDEE-G-R-OTP-25-26-31~SECR
SrDEE-G-R-OTP-25-26-31
Open
Works - General
12 Months
Raipur, Chhattisgarh
₹0
₹3.4 L
22 Dec 2025
28 Nov 2025
8 Dec 2025
66 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,82,82,359 | ||
| — | 3405.00 | — | — | ||
| Supply, testing, fixing &commissioning of GI perforated type cable tray made out of2.0mm thick sheet in standard length of 2.5mtr. Duly hot dip galvanized (as per IS 2629 & IS4759) including coupler plate with suitable GI nut, bolt &washer of 250mm W x75mm H including erection the same with PF shelter structure by bracketing arrangement made of50mm x10mm MS flat &fastening with shed structure.. | — | — | — | 22,91,565 | |
| — | 4.00 | — | — | ||
| Rate for supply, transporting, installation, testing & commissioning of 11/0.415KV, 500KVA capacity Transformer. | — | — | — | 34,14,044 | |
| — | 2.00 | — | — | ||
| Rate for supply of LT control panel consists of 2x800A ACB for two incoming and 4x 250A MCCB, 4X125A, 4P, 35KA MCCB for outgoing complete wih busbar , HRC fuse as back up & metering arrangement. | — | — | — | 11,16,264 | |
| — | 6.00 | — | — | ||
| Rate for supply of floor mounted LT Control Panel consist with2x400A 4P MCCB50kA breaking capacity for incoming, 4nos.4P 200A 4P MCCB 50KAbreakingcapacity, 4nos.4P 100A 4PMCCB 35KAbreakingcapacity,06nos.32A TPN MCB for out going complete with three phase busbar distribution system and backup HRC fuse, & Metering arrangement and indication. | — | — | — | 22,84,704 | |
| — | 25.00 | — | — | ||
| Rate for supply of LT control panel consists of 2x200A4P MCCB for incoming and2X100A 4P MCCB,6x63A TPN MCB,2x32A TPN MCB,2x20A DP MCB for outgoing complete with busbar , HRC fuse as back up & metering arrangement. | — | — | — | 19,98,475 | |
| — | 24.00 | — | — | ||
| Rate for supply of metallic distribution board consisting of 02nos. 4Pole 100A, MCCB as incoming , 6Nos 63A 4P MCCB as outgoing , with busbar, HRC backup fuse including locking arrangement. | — | — | — | 15,00,264 | |
| — | 160.00 | — | — | ||
| — | 103.00 | — | — | ||
| — | — | — | 12,82,350 | ||
| — | 4000.00 | — | — | ||
| — | — | — | 3,24,000 | ||
| — | 755.00 | — | — | ||
| — | 1550.00 | — | — | ||
| Design, manufacture, display of wall / hanging / floor mounting type LED illuminated sign / direction boards in half elliptical shape. The display sheet shall be of unbreakable 040 translucent polycarbonate sheet of 2 mm thickness. The text / graphics matter visibility shall not be less than 160 deg. The approved colour text and graphics shall be printed / outer cut on monomeric calendered vinyl of 70 um thickness and shall be firmly pasted on display sheets. The mounting arrangement shall be hanging, wall mounting, ceiling mounting, pole mounting or floor mounting and as per site requirement. The signage shall have the integral mounting arrangements with sturdy structural frame and ACP ladding on the back side of the signage to avoid rusting and entry of dust. The LED board shall have uniform illumination with 4-8 W / sq. ft and with brightness more than ambient light. Suitable size end cap of 1.5 mm thick SS 304 should be provided. | — | — | — | 47,46,100 | |
| — | 1080.00 | — | — | ||
| Supply & laying of HDPE pipe(PE-80, 90 mm dia, 10 mm thick @ density:0.954)) and cable (supplied by Railway) by pipe pushing method including all associated work. | — | — | — | 32,75,640 | |
| — | 9303.00 | — | — | ||
| Supply of 25 sq mm PVC pipe. | — | — | — | 3,34,908 | |
| — | 4620.00 | — | — | ||
| Supply of 25 sq mm pvc (4 way junction box) & bend. | — | — | — | 1,20,120 | |
| — | 37250.00 | — | — | ||
| Supply of PVC 2.5 sq mm wire. | — | — | — | 9,31,250 | |
| — | — | — | 97,55,788 | ||
| — | 2.00 | — | — | ||
| Rate for installation of of LT control panel consists of 2x800A ACB for two incoming and 4x 250A MCCB, 4X125A, 4P, 35KAMCCB for outgoing complete with busbar , HRC fuse as back up & metering arrangement. | — | — | — | 22,724 | |
| — | 6.00 | — | — | ||
| Rate for installation of floor mounted LT Control Panel consist with2x400A 4P MCCB50kA breaking capacity for incoming, 4nos.4P 200A 4P MCCB 50KAbreakingcapacity, 4nos.4P 100A 4PMCCB 35KAbreakingcapacity,06nos.32A TPN MCB for out going complete with three phase busbar distribution system and backup HRC fuse, & Metering arrangement and indication. | — | — | — | 57,318 | |
| — | 25.00 | — | — | ||
| Rate for installation of of LT control panel consists of 2x200A4P MCCB for incoming and2X100A 4P MCCB,6x63A TPN MCB,2x32A TPN MCB,2x20A DP MCB for outgoing complete with busbar , HRC fuse as bac | — | — | — | 11,775 | |
| — | 24.00 | — | — | ||
| Rate for erection of metallic distribution board consisting of 02nos. 4Pole 100A, MCCB as incoming , 6Nos 63A 4P MCCB as outgoing , with busbar, HRC backup fuse including locking arrangement. | — | — | — | 10,560 | |
| — | 160.00 | — | — | ||
| Installation wall mounted 8-way metallic sub distribution board with 01no 63A TPN MCB, 6nos16A SPMCB ,busbar and neutral link arrangement etc. | — | — | — | 11,520 | |
| — | 2000.00 | — | — | ||
| Pollarding of trees. | — | — | — | 26,58,000 | |
| — | — | — | 5,76,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Additionalspecialconditionofcontract.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .