| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC 1 TROPICAL REFRIGERATION PHONIX BAY PORT BLAIR PORT BLAIR ANDAMAN NICOBAR 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | L1 | Accepted-AOC Being lowest. | |
| 2 | L2₹50.4 L+₹47,197.60 (0.94%)Rejected-AOC | L2 | Rejected-AOC Being other than lowest. | |
| 3 | L3₹51.5 L+₹1.6 L (3.15%)Rejected-AOC MES WORKS SITE CARNICOBAR ANDAMAN NICOBAR ISLAND PIN 744301 | CARNICOBAR | NICOBAR | ANDAMAN AND NICOBAR ISLANDS | 744301 | L3 | Rejected-AOC Being other than lowest. | |
| 4 | L4₹52.3 L+₹2.4 L (4.71%)Rejected-AOC NO 99 IE DG INDUSTRIAL ESTATE DOLLYUNJ POST BOX NO 554 JUNGLIGHAT POST SRI VIJAYA PURAM 744 103 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | L4 | Rejected-AOC Being other than lowest. | |
| 5 | L5₹52.5 L+₹2.6 L (5.14%)Rejected-AOC PB NO 809 ABERDEEN BAZAR PO ATLANTA POINT NEAR POLICE WIRELESS PORT BLAIR 744104 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744104 | L5 | Rejected-AOC Being other than lowest. |
| Sl No | Description | Qty | Unit | Tropical Refrigeration L1 | ASHOK BISWAS L3 | Ravi Enterprises L8 | SKY GROUP L2 | SMS Engineering Corporation L4 | M/s Karbhagam Sales Agency L6 | ISLAND SALES ENTERPRISES L7 | Chandra Construction Enterprises L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L to Carryout servicing, oil change and replacement of maintenance components of capacity 10KVA to 30KVA, Make Kirloskar incuding periodical routine maintenance consisting of Checking, Inspection, Maintenance, and servicing complete including replacement of unserviceable parts of epxpendable spares like all type of filters, engne oil, coolant and testing of DG Set complete, i.e, etc for efficient functioning including provision of all consumables items like cotton waste cloth , kerosine oil etc. Maintenance will be carried out all as specefied for various capacity of DG sets here in after by an authorised dealer of OEM complete all as specified and directed by Engr-In-Charge. Make - Kirloskar | 4 | Each Job | 5,000 ₹20,000 Lowest | 5,120 ₹20,480 | 5,120 ₹20,480 | 5,000 ₹20,000 Lowest | 5,623 ₹22,492 | 5,260 ₹21,040 | 5,123 ₹20,492 | 5,120 ₹20,480 |
| 1.10Engine Servicing /Gen overhauling :- (a) Checking the lubricant oil, topping up & changing filters if required (b) Checking the lubricant level and replacing if required (c) Checking of alternater, battery charging, fanbelt and adjusting/renewing if required (d) Checking/adjusting of sensers / controls of the Engine (e) Cleaning the cylinder head, lever, lube oil, gudgen pins etc (f) Draining fuel filter bowels to remove water/sediments and refixing with new gaskets after cleaning/ renewing the filters | |||||||||||
| 1.20(g) Checking and tightening all external fasteners and arresting all leakages by renewing deffective nuts bolts washers etc whereever required (h) Checking and arresting leakages by tightening all lube and fuel/ hose connections by renewing defective washers (i) Checking of air filters subject to 250 hrs running or six months whichever is earliest for renewal (j) Cleaning of air filter assembly (k) Renewal of all external rubber parts including radiator hose pipes, sir clips/clamps with nuts bolts etc (l) Arresting all water /lubricant/fuel leakages (m) Checking of all engine parameters and ensuring trouble free performance (n) Removing US spares and fixing of new spares including testing etc | |||||||||||
| 1.30Alternator Servicing :- (a) Checking lubricant in the bearings (b) Checking electrical excitation system and repairing if required (c) Checking alternator insulation values and tightning the electrical connections etc (d) Checking circuits of various connections (e) Cleaning the slip rings/brushes etc (f ) Removing US spares and fixing of new spares including testing etc | |||||||||||
| 1.40Note: (i) Spare parts shall be measured and paid separately under respective items as shown below. (ii) Labour charges for dismantling / Taking down and replacement /refixing of new spare parts as when required as deemed to be included in unit rate quoted. (iii) Labour charges for cleaning of inner and outer surfaces and all components with clean dry cloth deemed to be included in unit rate quoted. (iv) Rate including drain out of old unserviceble engine oil, coolant etc from DG set deemed to be included in quoted rate. (v) Charges for Major repairs / top overhauling of engine, rewinding of alternator, alternator major overhauling due to normal wear & tear will be out of scope of the work. However the damages caused due to negligence of the contractor will be made good without any extra cost by the contractor. Cost of minor spares required for proper operation of DG set and Control panel shall be deemed to be included in the rate quoted. (vi) DHPP (N) required at the time of mainteance/testing will be issued by MES. (vii)(c) U/s spares shall be measured under Schedule of Credit (viii) AMF Panel Servicing will be measured anf paid seperately | |||||||||||
| 2.00Supply only following unserviceable spare parts with new one confirming to the existing respective parts nos for DG set capacity 10KVA to 30KVA. MAKE : Kirloskar | |||||||||||
| 2.01 | (a) Spinon or cartridge type lubrication oil filter | 8 | Each | 1,000 ₹8,000 Lowest | 1,120 ₹8,960 | 1,120 ₹8,960 | 1,000 ₹8,000 Lowest | 1,235 ₹9,880 | 1,125 ₹9,000 | 1,253 ₹10,024 | 1,250 ₹10,000 |
| 2.02 | (b) Poly V Belt for cooling system | 4 | Each | 1,500 ₹6,000 Lowest | 1,789 ₹7,156 | 1,820 ₹7,280 | 1,750 ₹7,000 | 1,856 ₹7,424 | 1,820 ₹7,280 | 1,825 ₹7,300 | 1,785 ₹7,140 |
| 2.03 | (c) Poly V Belt for dynomo/battery charging system | 4 | Each | 1,500 ₹6,000 Lowest | 1,765 ₹7,060 | 1,720 ₹6,880 | 1,750 ₹7,000 | 1,865 ₹7,460 | 1,842 ₹7,368 | 1,825 ₹7,300 | 1,785 ₹7,140 |
| 2.04 | (d) Air Cleaner primary element | 4 | Each | 5,000 ₹20,000 Lowest | 5,132 ₹20,528 | 5,230 ₹20,920 | 5,000 ₹20,000 Lowest | 5,263 ₹21,052 | 5,320 ₹21,280 | 5,230 ₹20,920 | 5,210 ₹20,840 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
16 Mar 2026, 6:00 pmClosed
GE 866 EWS CARNICOBAR
GE 866 EWS CARNICOBAR PIN-913866 C/O 99APO
REPAIR MAINTENANCE OF STANDBY DG SETS ALONGWITH CONNECTED WORKS AT AF STATION CARNICOBAR
2026_MES_753830_1
8783/E8
Open Tender
Civil Works
Item Rate
365 days
GE 866 EWS CARNICOBAR AIR FORCE STATION
As per tender documents
9 documents required · 9 mandatory
₹500
GE 866 EWS
₹96,000
Yes
24 Apr 2026
23 Feb 2026
23 Mar 2026
23 Feb 2026
16 Mar 2026
9 Mar 2026
23 Feb 2026 - 2 Mar 2026
M&L to Carryout servicing, oil change and replacement of maintenance components of capacity 10KVA to 30KVA, Make Kirloskar incuding periodical routine maintenance consisting of Checking, Inspection, Maintenance, and servicing complete including replacement of unserviceable parts of epxpendable spares like all type of filters, engne oil, coolant and testing of DG Set complete, i.e, etc for efficient functioning including provision of all consumables items like cotton waste cloth , kerosine oil etc. Maintenance will be carried out all as specefied for various capacity of DG sets here in after by an authorised dealer of OEM complete all as specified and directed by Engr-In-Charge. Make - Kirloskar
Engine Servicing /Gen overhauling :- (a) Checking the lubricant oil, topping up & changing filters if required (b) Checking the lubricant level and replacing if required (c) Checking of alternater, battery charging, fanbelt and adjusting/renewing if required (d) Checking/adjusting of sensers / controls of the Engine (e) Cleaning the cylinder head, lever, lube oil, gudgen pins etc (f) Draining fuel filter bowels to remove water/sediments and refixing with new gaskets after cleaning/ renewing the filters
(g) Checking and tightening all external fasteners and arresting all leakages by renewing deffective nuts bolts washers etc whereever required (h) Checking and arresting leakages by tightening all lube and fuel/ hose connections by renewing defective washers (i) Checking of air filters subject to 250 hrs running or six months whichever is earliest for renewal (j) Cleaning of air filter assembly (k) Renewal of all external rubber parts including radiator hose pipes, sir clips/clamps with nuts bolts etc (l) Arresting all water /lubricant/fuel leakages (m) Checking of all engine parameters and ensuring trouble free performance (n) Removing US spares and fixing of new spares including testing etc
Alternator Servicing :- (a) Checking lubricant in the bearings (b) Checking electrical excitation system and repairing if required (c) Checking alternator insulation values and tightning the electrical connections etc (d) Checking circuits of various connections (e) Cleaning the slip rings/brushes etc (f ) Removing US spares and fixing of new spares including testing etc
Note: (i) Spare parts shall be measured and paid separately under respective items as shown below. (ii) Labour charges for dismantling / Taking down and replacement /refixing of new spare parts as when required as deemed to be included in unit rate quoted. (iii) Labour charges for cleaning of inner and outer surfaces and all components with clean dry cloth deemed to be included in unit rate quoted. (iv) Rate including drain out of old unserviceble engine oil, coolant etc from DG set deemed to be included in quoted rate. (v) Charges for Major repairs / top overhauling of engine, rewinding of alternator, alternator major overhauling due to normal wear & tear will be out of scope of the work. However the damages caused due to negligence of the contractor will be made good without any extra cost by the contractor. Cost of minor spares required for proper operation of DG set and Control panel shall be deemed to be included in the rate quoted. (vi) DHPP (N) required at the time of mainteance/testing will be issued by MES. (vii)(c) U/s spares shall be measured under Schedule of Credit (viii) AMF Panel Servicing will be measured anf paid seperately
Supply only following unserviceable spare parts with new one confirming to the existing respective parts nos for DG set capacity 10KVA to 30KVA. MAKE : Kirloskar
(a) Spinon or cartridge type lubrication oil filter
(b) Poly V Belt for cooling system
(c) Poly V Belt for dynomo/battery charging system
(d) Air Cleaner primary element
(e) Air Cleaner Secondary safety Element
(f) FUEL FILTER assembly TWIN BOWL or single bowl type
(g) FUEL FILTER KIT single or double as per existing
(h) SET OF COPPER WASHERS
(j) FUEL PIPE(FEED PUMP TO FUEL FILTER)
(k) BRACKET FOR FUEL FILTER-
(l) Water seperator with complete assembly
(m) Fuel injecting nozzles with injecting pipe
(n) Tapet pin and slip bearing roller sleeves for entire cylinders
(o) Cylinder head gasket assembly for entire cylinders
(p) Worm drive hose pipe for control cables 15mm tto 25mm dia
M&L to Carryout servicing, oil change and replacement of maintenance components of capacity 62.5 KVA to 82.5 KVA, Make Kirloskar incuding periodical routine maintenance consisting of Checking, Inspection, Maintenance, and servicing complete including replacement of unserviceable parts of epxpendable spares like all type of filters, engne oil, coolant and testing of DG Set complete, i.e, etc for efficient functioning including provision of all consumables items like cotton waste cloth , kerosine oil etc. Maintenance will be carried out all as specefied for various capacity of DG sets here in after by an authorised dealer of OEM complete all as specified and directed by Engr-In-Charge. Make - Kirloskar
Engine Servicing /Gen overhauling :- (a) Checking the lubricant oil, topping up & changing filters if required (b) Checking the lubricant level and replacing if required (c) Checking of alternater, battery charging, fanbelt and adjusting/renewing if required (d) Checking/adjusting of sensers / controls of the Engine (e) Cleaning the cylinder head, lever, lube oil, gudgen pins etc (f) Draining fuel filter bowels to remove water/sediments and refixing with new gaskets after cleaning/ renewing the filters
(g) Checking and tightening all external fasteners and arresting all leakages by renewing deffective nuts bolts washers etc whereever required (h) Checking and arresting leakages by tightening all lube and fuel/ hose connections by renewing defective washers (i) Checking of air filters subject to 250 hrs running or six months whichever is earliest for renewal (j) Cleaning of air filter assembly (k) Renewal of all external rubber parts including radiator hose pipes, sir clips/clamps with nuts bolts etc (l) Arresting all water /lubricant/fuel leakages (m) Checking of all engine parameters and ensuring trouble free performance (n) Removing US spares and fixing of new spares including testing etc
Alternator Servicing :- (a) Checking lubricant in the bearings (b) Checking electrical excitation system and repairing if required (c) Checking alternator insulation values and tightning the electrical connections etc (d) Checking circuits of various connections (e) Cleaning the slip rings/brushes etc (f ) Removing US spares and fixing of new spares including testing etc
Note: (i) Spare parts shall be measured and paid separately under respective items as shown below. (ii) Labour charges for dismantling / Taking down and replacement /refixing of new spare parts as when required as deemed to be included in unit rate quoted. (iii) Labour charges for cleaning of inner and outer surfaces and all components with clean dry cloth deemed to be included in unit rate quoted. (iv) Rate including drain out of old unserviceble engine oil, coolant etc from DG set deemed to be included in quoted rate. (v) Charges for Major repairs / top overhauling of engine, rewinding of alternator, alternator major overhauling due to normal wear & tear will be out of scope of the work. However the damages caused due to negligence of the contractor will be made good without any extra cost by the contractor. Cost of minor spares required for proper operation of DG set and Control panel shall be deemed to be included in the rate quoted. (vi) DHPP (N) required at the time of mainteance/testing will be issued by MES. (vii)(c) U/s spares shall be measured under Schedule of Credit (viii) AMF Panel Servicing will be measured anf paid seperately
Supply only following unserviceable spare parts with new one confirming to the existing respective parts nos for DG set capacity 62.5KVA to 82.5KVA.
(a) Gasket for cylinder head, 1.10mm thick,
(b) Lubricating oil supply hose (FIP) M10 Banjo Ends x 235 L,
(c) SPECIAL BANJO BOLT(L.O.SUPPLY TO PUMP),
(d) Copper washer
(e) THERMOSTAT ELEMENT(85 degree C)
(f) FUEL PIPE - FUEL FILTER TO FUEL PUMP (HA4 BS III),
(g) Pipe for Fuel pipe feed pump to filter,
(h) Spinon or cartridge type lubrication oil filter
(j) Poly V Belt for cooling system
(k) Poly V Belt for dynomo/battery charging system
(l) Air Cleaner primary element
(m) Air Cleaner Secondary safety Element
(n) FUEL FILTER assembly TWIN BOWL or single bowl type
(o) FUEL FILTER KIT single or double as per existing
(p) HOSE ( RADIATOR TO WATER PUMP PIPE (45X45X130L),
(q) Worm drive hose pipe for control cables 15mm tto 25mm dia
(r) Upper clamp for hose pipe,
(s) Lower clamp for hose pipe,
(t) Water seperator with complete assembly
M&L to Carryout servicing, oil change and replacement of maintenance components of capacity 100 KVA to 160KVA. MAKE - Cummins incuding periodical routine maintenance consisting of Checking, Inspection, Maintenance, and servicing complete including replacement of unserviceable parts of epxpendable spares like all type of filters, engne oil, coolant and testing of DG Set complete, i.e, etc for efficient functioning including provision of all consumables items like cotton waste cloth , kerosine oil etc. Maintenance will be carried out all as specefied for various capacity of DG sets here in after by an authorised dealer of OEM complete all as specified and directed by Engr-In-Charge. Make - Cummins
Engine Servicing /Gen overhauling :- (a) Checking the lubricant oil, topping up & changing filters if required (b) Checking the lubricant level and replacing if required (c) Checking of alternater, battery charging, fanbelt and adjusting/renewing if required (d) Checking/adjusting of sensers / controls of the Engine (e) Cleaning the cylinder head, lever, lube oil, gudgen pins etc (f) Draining fuel filter bowels to remove water/sediments and refixing with new gaskets after cleaning/ renewing the filters
(g) Checking and tightening all external fasteners and arresting all leakages by renewing deffective nuts bolts washers etc whereever required (h) Checking and arresting leakages by tightening all lube and fuel/ hose connections by renewing defective washers (i) Checking of air filters subject to 250 hrs running or six months whichever is earliest for renewal (j) Cleaning of air filter assembly (k) Renewal of all external rubber parts including radiator hose pipes, sir clips/clamps with nuts bolts etc (l) Arresting all water /lubricant/fuel leakages (m) Checking of all engine parameters and ensuring trouble free performance (n) Removing US spares and fixing of new spares including testing etc
Alternator Servicing :- (a) Checking lubricant in the bearings (b) Checking electrical excitation system and repairing if required (c) Checking alternator insulation values and tightning the electrical connections etc (d) Checking circuits of various connections (e) Cleaning the slip rings/brushes etc (f ) Removing US spares and fixing of new spares including testing etc
Note: (i) Spare parts shall be measured and paid separately under respective items as shown below. (ii) Labour charges for dismantling / Taking down and replacement /refixing of new spare parts as when required as deemed to be included in unit rate quoted. (iii) Labour charges for cleaning of inner and outer surfaces and all components with clean dry cloth deemed to be included in unit rate quoted. (iv) Rate including drain out of old unserviceble engine oil, coolant etc from DG set deemed to be included in quoted rate. (v) Charges for Major repairs / top overhauling of engine, rewinding of alternator, alternator major overhauling due to normal wear & tear will be out of scope of the work. However the damages caused due to negligence of the contractor will be made good without any extra cost by the contractor. Cost of minor spares required for proper operation of DG set and Control panel shall be deemed to be included in the rate quoted. (vi) DHPP (N) required at the time of mainteance/testing will be issued by MES. (vii)(c) U/s spares shall be measured under Schedule of Credit (viii) AMF Panel Servicing will be measured anf paid seperately
Supply only following unserviceable spare parts with new one confirming to the existing respective parts nos for DG set capacity 62.5 KVA to 160KVA (Make - Cummins)
(a) Gasket for cylinder head, 1.10mm thick,
(b) Lubricating oil supply hose (FIP) M10 Banjo Ends x 235 L,
(c) SPECIAL BANJO BOLT(L.O.SUPPLY TO PUMP),
(d) Copper washer
(e) THERMOSTAT ELEMENT(85 degree C)
(f) FUEL PIPE - FUEL FILTER TO FUEL PUMP (HA4 BS III),
(g) Fuel pipe feed pump to filter,
(h) Spinon or cartridge type lubrication oil filter
(j) Poly V Belt for cooling system
(k) Poly V Belt for dynomo/battery charging system
(l) Air Cleaner primary element
(m) Air Cleaner Secondary safety Element
(n) FUEL FILTER assembly TWIN BOWL or single bowl type
(o) FUEL FILTER KIT single or double as per existing
(p) HOSE ( RADIATOR TO WATER PUMP PIPE (45X45X130L),
(q) Worm drive hose pipe for control cables 15mm tto 25mm dia
(r) Upper clamp for hose pipe,
(s) Lower clamp for hose pipe,
(t) Water seperator with complete assembly
M&L to Carryout servicing, oil change and replacement of maintenance components of capacity 600KVA. MAKE - Kirloskar incuding periodical routine maintenance consisting of Checking, Inspection, Maintenance, and servicing complete including replacement of unserviceable parts of epxpendable spares like all type of filters, engne oil, coolant and testing of DG Set complete, i.e, etc for efficient functioning including provision of all consumables items like cotton waste cloth , kerosine oil etc. Maintenance will be carried out all as specefied for various capacity of DG sets here in after by an authorised dealer of OEM complete all as specified and directed by Engr-In-Charge. Make - Kirloskar
Engine Servicing /Gen overhauling :- (a) Checking the lubricant oil, topping up & changing filters if required (b) Checking the lubricant level and replacing if required (c) Checking of alternater, battery charging, fanbelt and adjusting/renewing if required (d) Checking/adjusting of sensers / controls of the Engine (e) Cleaning the cylinder head, lever, lube oil, gudgen pins etc (f) Draining fuel filter bowels to remove water/sediments and refixing with new gaskets after cleaning/ renewing the filters
(g) Checking and tightening all external fasteners and arresting all leakages by renewing deffective nuts bolts washers etc whereever required (h) Checking and arresting leakages by tightening all lube and fuel/ hose connections by renewing defective washers (i) Checking of air filters subject to 250 hrs running or six months whichever is earliest for renewal (j) Cleaning of air filter assembly (k) Renewal of all external rubber parts including radiator hose pipes, sir clips/clamps with nuts bolts etc (l) Arresting all water /lubricant/fuel leakages (m) Checking of all engine parameters and ensuring trouble free performance (n) Removing US spares and fixing of new spares including testing etc
Alternator Servicing :- (a) Checking lubricant in the bearings (b) Checking electrical excitation system and repairing if required (c) Checking alternator insulation values and tightning the electrical connections etc (d) Checking circuits of various connections (e) Cleaning the slip rings/brushes etc (f ) Removing US spares and fixing of new spares including testing etc
Note: (i) Spare parts shall be measured and paid separately under respective items as shown below. (ii) Labour charges for dismantling / Taking down and replacement /refixing of new spare parts as when required as deemed to be included in unit rate quoted. (iii) Labour charges for cleaning of inner and outer surfaces and all components with clean dry cloth deemed to be included in unit rate quoted. (iv) Rate including drain out of old unserviceble engine oil, coolant etc from DG set deemed to be included in quoted rate. (v) Charges for Major repairs / top overhauling of engine, rewinding of alternator, alternator major overhauling due to normal wear & tear will be out of scope of the work. However the damages caused due to negligence of the contractor will be made good without any extra cost by the contractor. Cost of minor spares required for proper operation of DG set and Control panel shall be deemed to be included in the rate quoted. (vi) DHPP (N) required at the time of mainteance/testing will be issued by MES. (vii)(c) U/s spares shall be measured under Schedule of Credit (viii) AMF Panel Servicing will be measured anf paid seperately
Supply only following unserviceable spare parts with new one confirming to the existing respective parts nos for DG set capacity 62.5 KVA to 600KVA (Make - Kirloskar)
(a) Lub oil filter suitable for 600 KVA DG Set of KOEL Part No. DVO. 014.27.0.00 for DV 2 series engine complete all as directed by Engineer in charge.
(b) Lub oil filter suitable for 600 KVA DG Set of KOEL Part No. DVO. 014.11.0.00 for DV 2 Series engine (spin-on type) all as specified and directed.
(c) Fuel filter cartridge suitable for 600/500 KVA DG Set of KOEL Part No. DVO. 020.03.0.00. for DV2 series engine complete all as specified and directed by Engineer in charge.
(d) Air Cleaner Primary Element for DV2 series engine 600 KVA Part No F6.986.11.0.00 complete all as specified and directed by Engineer in charge.
(e) Air Cleaner Safety Element for DV 2 series engine 600 KVA Part No F6.986.12.0.00 complete all as specified and directed by Engineer in charge.
(f) V Belt wrapped SPB AR1170 DV2.016.01.0.00 suitable for 600/500 KVA DV2 series engine complete all as specified and directed by Engineer in charge.
(g) V Belt Cogged B X 58 DVO.016.08.0.00 suitable for engine pully to radiator fan pully/water pump 600/500 KVA DV 2 series engine all as specified and directed.
(h) Copper washer
(j) THERMOSTAT ELEMENT(85 degree C)
(k) FUEL PIPE - FUEL FILTER TO FUEL PUMP (HA4 BS III)
(l) Fuel pipe feed pump to filter
(m) HOSE ( RADIATOR TO WATER PUMP PIPE (45X45X130L),
(n) Worm drive hose pipe for control cables 15mm tto 25mm dia
(o) Upper clamp for hose pipe
(p) Lower clamp for hose pipe
(k) Water seperator with complete assembly
Supply and filling of Engine oil as per existing grade SAE 15 W 40 of DG sets
Supply and filling of Coolant pre-mixed type suitable for all DG set Make : CASTROL / SERVO / PUROKOOL / K-Kool
Labour only for dismantling of radiator assembly from generating set and re-fixing the same after proper cleaning/repair of the same with caustic soda and brazing the tube if any leakage is found complete all as directed for following capacities of DG Set:
(a) 62.5 KVA to 82.5KVA DG Set, (Make : Kirloskar)
(b) 100 KVA/ 125 KVA DG Set, (Make : Cummins)
(c) 160 KVA DG Set, (Make : Cummins)
(d) 600 KVA DG Set, (Make : Kirloskar)
Labour only for cleaning of fuel tank assembly from its mounting structure of generating set any size and type, emptying fuel/proper cleaning/re-washing with fuel and repair of the same if corroded out or any leakage is found complete all as directed for following capacities of DG Set
(a) 10 KVA DG Set, (Make : Kirloskar)
(b) 30 KVA DG Set, (Make : Kirloskar)
(c) 62.5 KVA to 82.5KVA DG Set, (Make : Kirloskar)
(d) 100 KVA/ 125 KVA DG Set, (Make : Cummins)
(e) 160 KVA DG Set, (Make : Cummins)
(f) 600 KVA DG Set, (Make : Kirloskar)
Dismantling of exhaust fume assembly from its mounting structure of generating set any size and type and re-fixing the same after proper cleaning/wiping out of carbon dust and washing with fuel and repair of the same if corroded out or any hole in pipe is found and drying up in sun light, complete all as directed for following capacities of DG Set
(a) 10 KVA DG Set, (Make : Kirloskar)
(b) 30 KVA DG Set, (Make : Kirloskar)
(c) 62.5 KVA to 82.5 KVA DG Set, (Make : Kirloskar)
(d) 100 KVA/ 125 KVA DG Set, (Make : Cummins)
(e) 160 KVA DG Set, (Make : Cummins)
(f) 600 KVA DG Set, (Make : Kirloskar)
Disconnecting the self starter 12V or 24V from the engine body, dismantling the same, checking for identification of faulty spares, servicing inner components and reassemblig the same after replacement/renewal of the spares, if required, including refixing to its original position all as specified and directed. Note: (i) Spares shall be measured and paid under relevant items
Supply only spares for fixing in repair against the faulty one for the self starter 12V or 24V for the DG sets of capacity varying from 62.5KVA to 160KVA-
(a) Clutch assembly (Make : LUCAS TVS)
(b) Bendex pinion (Make : LUCAS TVS)
(c) Solenoid switch (Make : LUCAS TVS)
(d) Carbon Brush (Make : LUCAS TVS)
(e) Armature Field Coil (Make : LUCAS TVS)
(f) Bush (Make : LUCAS TVS)
(g) Self armature coil (Make : LUCAS TVS)
Supply and fixing Automatic voltage regulator 12 Volt or 24 Volt of the following DG capacity including taking down old unserviceable one, complete all as specified & directed. (Make :- Kirloskar / MRI / Crompton Greaves)
(a) 12 Volt, suitable for 10 KVA DG Set, Make - Kirloskar
(b) 12 Volt, suitable for 62.5 KVA to 82.5KVA DG Set, Make - Kirloskar
(c) 24 Volt, suitable for 100KVA to 160 KVA DG Set, Make - Cummins
Supply and fixing Turbo charge assembly complete set suitable for DG set 160KVA including testing after replacement, dismantling the old UNSV one etc complete all as specified and as directed by Engineer-in-Charge (Make :- Cummins or equivalent as per existing)
Supply and fixing Turbo charge assembly complete set suitable for 62.5KVA to 100KVA DG set including testing after replacement, dismantling the old UNSV one etc complete all as specified and as directed by Engineer-in-Charge (Make - Kirloskar or equivalent as per existing)
Servicing of AMF /DG control panel of any capacity including replacement of existing unserviceable power contactors, MCCBs and making incoming, outgoing elect connections, replacement of burnt wires, thimbles, lugs, nut bolts & washer etc complete reqd at site & directed:- Note: (i) Spares shall be measured and paid under resecitve items
Supply only spares for fixing in repair 225 Amps, 3 Pole with 2 NO & 2 NC auxilary contact of coil rating 415 Volt, 50 Hz for the AMF /DG control panel Make- L&T / C&S / Legrand / Siemens .
Supply only spares for fixing in repair 160 Amps, 3 Pole with 2 NO & 2 NC auxilary contact of coil rating 415 Volt, 50 Hz for the AMF /DG control panel Make- L&T / C&S / Legrand / Siemens .
Supply only spares for fixing in repair 140 Amps, 3 Pole with 2 NO & 2 NC auxilary contact of coil rating 415 Volt, 50 Hz for the AMF /DG control panel Make- L&T / C&S / Legrand / Siemens .
Supply only spares for fixing in repair Contactor 4 pole 200A, MCX 33 with 2NO+ 2NC ,auxiliary contact for the AMF /DG control panel Make- L&T / C&S / Legrand / Siemens .
Supply only spares for fixing in repair Contactor 4 pole 63A, MCX 12 with add on block for the AMF /DG control panel Make- L&T / C&S / Legrand / Siemens .
Supply only spares for fixing in repair Contactor 4 pole 100A, MCX 22 with add on block for the AMF /DG control panel Make- L&T / C&S / Legrand / Siemens .
M & L for repair and maintenance of unserviceable defective DG set stator assembly of alternator by carefully dismantling including transporting defective alternator to OEM authorized workshop at Port Blair ,strip opening of alternator ,take out burnt winding along with insulation material cleaning the stator and rotor assembly ,rewinding the stator with super enamelled copper winding wire of existing gauge and turns including providing proper mica insulation sheet, high grade varnishing, heating, overhauling of rotor assembly ,replacement of defective end bearings complete as required at site and refixing to its original position, connecting all cables and control wiring connections, testing and setting all parameters as specified by OEM and directed by Engr in Charge Note:- (i) Minimum 6 month warranty on rewinding shall be given . (ii) 12 Hrs testing after successfully repaired shall be carried out for 12 Hrs i.e. for (2 Hrs on 25%, 2 Hrs on 50%, 2 Hrs on 75% & 4 Hrs on 100 % Load) (iii) Quoted rate shall deemed to be inclusive of all nothing extra shall be paid.
M&L for replacement of Stop Solenoid , 3R unit suitable for 10 KVA to 160 KVA Dg Set as prescribed by the manufacturer. Model / Make as per existing.
Supply and fixing in replacement lead acid batteries 12 Volts, 180 AH including acesories like terminal clamps, copper cable of required size and length, petroleum jelly and baterry initial charging complete all as specified and as directed Make Exide/Amar Raja/Amaron/Luminous.
Supply and fixing in replacement lead acid batteries 12 Volts, 150 AH including acesories like terminal clamps, copper cable of required size and length, petroleum jelly and baterry initial charging complete all as specified and as directed Make Exide/Amar Raja/Amaron/Luminous.
Supply and fixing in replacement lead acid batteries 12 Volts, 88 AH including acesories like terminal clamps, copper cable of required size and length, petroleum jelly and baterry initial charging complete all as specified and as directed Make Exide/Amar Raja/Amaron/Luminous.
Supply only in replacement MCCB, 4 pole, 250 Amps, 415 Volts, breaking capacity 25 KA, Ics=100%Icu, adjustable thermal and adjustable magnetic setting fixed-in-repairs, including taking out old unserviceable MCCB of any description complete all as specified and as directed. (Make :Havells/L&T/Legrand/ABB/Schneider)
Supply only in replacement MCCB, 4 pole, 100 Amps, 415 Volts, breaking capacity 25 KA, Ics=100%Icu, adjustable thermal and adjustable magnetic setting fixed-in-repairs, including taking out old unserviceable MCCB of any description complete all as specified and as directed. (Make :Havells/L&T/Legrand/ABB/Schneider)
Supply only in replacement MCCB, 4 pole, 200 Amps, 415 Volts, breaking capacity 25 KA, Ics=100%Icu, adjustable thermal and adjustable magnetic setting fixed-in-repairs, including taking out old unserviceable MCCB of any description complete all as specified and as directed. (Make :Havells/L&T/Legrand/ABB/Schneider)
Labour only for attending major breakdown in engine and alternator of DG sets of capacity varying from 10KVA to 600KVA (Standby DG sets only) from respective OEM with the help of service engineer and skilled technician and rectifying the fault by replacing minor spare parts which are not covered in general servicing and maintenence and testing complete all as specified and as directed by Engineer-in-Charge Note: (i) All the spare parts shall be measured and paid separately under respective items. (ii) Breakdown shall be attended and rectified within 15 days from the date of communication without fail.
(a) Supply only DC battery pick up relay of voltage range 12V to 24V as per existing size and type
(b) Coolant temperature sensor with standard size cable suitable for 62.5KVA to 600KVA DG sets
(c) DC and AC fuse unit glass tube type / flat transparent type with current rating 0.5A to 5A
(d) Lub oil pressure indication sensors suitable for DG set 10KVA to 600KVA as per existing make & model
(e) Low fuel indication sensors suitable for DG set 10KVA to 600KVA as per existing make & model
(f) Data communication port with complete assemble including cable , jack and connector pin suitable for 62.5KVA to 600KVA DG set as per existing make & model
M&L for replacement of defective AMF digital controller Type PT-DGC6-D Make - Procom for 100 KVA Cummins DG set complete all as specified & directed by Engr in charge.
M&L for replacement of defective AMF digital controller Type EC-RXA- V2, 5 A, 50 HZ,230V AC Make - C&S
M&L for replacement unserviceable charging alternator 12 Volt or 24 Volt, 35 Amp complete as per existing model & type suitable for DG Set 10 to 160 KVA complete all as specified & directed Make- NHP / MMAX power Engineers / Amvotronics Pvt Ltd.
Supply and pouring distilled water for battary and radiator as directed.
Supply only BATTERY CABLE ASSEMBLY including round brass clamp (FOR -VE & +VE) for connection of Battery to Self with copper Lugs, copper cable and copper connector of baterry as per existing size for both terminal, complete all as specified and directed.
S&F in repair changer over switch (SS Enclosure) complete with of capacity 200 Amp, 415 Volt, 4 pole, 50 HZ . Make : Havells or equivalent of Legrand/L&T/ABB
S&F in repair change over switch (SS Enclosure) complete with of capacity 320 Amp, 415 Volt, 4 pole, 50 HZ . Make : Havells or equivalent of Legrand/L&T/ABB
Supply and Fixing in replacement Fuel Injector assembly of DG sets of capacity 600 KVA (Make : Kirloskar) complete all as specified and directed by Engineer in charge.
Supply and Fixing in replacement pressure Fuel pipe assembly from FIP to injector for 600 KVA DG set (Make : Kirloskar) with necessary fixing arrangement complete all as specified and directed by Engineer in charge.
Supply, laying or passing through pipe LT, XLPE insulated, galvanised steel strip or wire armoured electric power cable conforming to IS:7098 (Pt-I)-1988, heavy duty with stranded aluminium conductor 1100 Volts grade of size 150 Sqmm 3.5 core with necessary fixing arrangements such as lungs, glands and terminal etc including connecting/testing after taking out unserviceable LT UG cable from trenches/ pole complete all as specified and directed. NOTE: Excavation, earth work shall be measured and paid for separately.
Supply, laying or passing through pipe LT, XLPE insulated, galvanised steel strip or wire armoured electric power cable conforming to IS:7098 (Pt-I)-1988, heavy duty with stranded aluminium conductor 1100 Volts grade of size 95 Sqmm 3.5 core with necessary fixing arrangements such as lungs, glands and terminal etc including connecting/testing after taking out unserviceable LT UG cable from trenches/ pole complete all as specified and directed. NOTE: Excavation, earth work shall be measured and paid for separately.
Excavation in trenches in soft/loose soil not exceeding 1.5 mtr wide and not exceeding 1.5 meter in depth for taking out and laying UG cable and getting out, excavated earth, forming bottom surfaces to required level complete all as specified and directed.
Returning filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and as directed.
Removing excavated material (soil) exc 50 m n.exc 250 m and depositing where as directed at a level n.exc 1.5 m above the starting point complete all as specified and as directed.
Material and Labour for 80 mm dia galvanized iron tube light grade for cable protection, supporting to poles, plinth protections, road crossing, trenches, footpath etc including clamps, nut, bolt and washers etc after taking out unserviceable pipe complete all as specified and directed.
Supply and laying double wall corrugated pipe (DWC) conforming to IS 19430 Part - I of size 120 mm outer dia and 103.5 mm inner dia complete all as specified and as directed
Supply and filling Diesel Exhaust Fluids (DEF)
Schedule of Credit (Minus) Rs.67539.00 NOTE: Bidder shall insert credit amount of Rs. 67539.00 as rate in Green field under Col-13.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
8783Tender.pdf
Tender Documents • 0.87 MB
BOQ_844338.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .