| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC | ₹15.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.0 L+₹31,437.91 (2.00%)Rejected-AOC | ₹16.0 L+₹31,437.91 (2.00%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
₹15.7 L
EMD Value
₹31,438
Closing Date
3 Mar 2026, 2:30 pmClosed
BDO GORUBATHAN
Office of the BDO Gorubathan
Construction of Integrated Science Lab at Chisang High School under Gorubathan Development Block in Kalimpong District
2026_DMK_1013413_3
BDO/GBN/e-NIT /37( RIDF XXXI)/2025-26
Open Tender
CIVIL WORKS
Percentage
45 days
Todey Tangta GP
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹31,438
17 Jul 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a)Depth of excavation not exceeding 1500 mm | 0.8 | Cum | 119.27 | ₹95.4 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) | 0.2 | Cum | 77.54 | ₹15.51 |
| 3 | Single Brick flat soling of picked jhama bricks including ramming and dressing bed to proper level, and filling joints with powered earth or local sand. | 0.2 | Cum | 530.4 | ₹105.55 |
| 4 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (B) [N.B Variety] Stone Metal (a) 1:3:6 proportion | 0.8 | Cum | 5,971.2 | ₹4,776.36 |
| 5 | 25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). | 1 | Cum | 357.6 | ₹357.24 |
| 6 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth | - | Cum | 7,731.6 | - |
| 7 | Brick work with 1st class bricks in cement mortar (1:6) (b) In Super Structure, ground Floor | 0.4 | Cum | 7,999.2 | ₹3,199.68 |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety. | 0.6 | Cum | 8,293.05 | ₹4,975.83 |
| 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4mm, using approved scout props and thick hard wood planks of approved thickness with required bracings for concrete slabs, columns, lintels, beams etc. curved or straight, including fitting, fixing and striking out after completion of works (upto roof of ground floor). a) 25 mm to 30 mm thick wooden shuttering as per decision and direction of the Engineer-in-Charge. | 0.96 | SqM | 334 | ₹320.64 |
| 10 | Reinforcement for reinforced concrete work in all sort of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary) cutting to requisite length, hooking and bending to correct shape, placking in proper position and binding with 16 gauge black annealed wire at every inter- section, complete as per drawing and direction. | 1 | MT | 72,943.69 | ₹72,870.75 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_2489181.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .