Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
22 Jul 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-I
SE EDC-I HYDEL COLONY BULANDSHAHR
Making the power supply smooth after the breakdown in emergency.
2022_PVVNL_715415_1
T-33/EDC-I/B/2022-23
Open Tender
Electrical Works
Item Rate
30 days
BULANDSHAHR
PLZ REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
SE EDC-I
₹2,000
28 Jul 2022
16 Jul 2022
22 Jul 2022
16 Jul 2022
22 Jul 2022
16 Jul 2022
Amount
fo|qr forj.k [k.M&[kqtkZ ds vUrxZr fo|qr forj.k mi[k.M&f}rh;@r`rh;] [kqtkZ ds vk/khu fofHkUu midsUnzksa ds okf"kZd izkDdykuqlkj le;≤ ij fo|qr O;o/kku ,oa czsdMkmu gksus ij 'kh/kzrk ds lkFk fo|qr vkiwfrZ O;oLFkk lqpk: djus laca/kh dk;ZA
Carriage of fallowings from ESC. BSR to JE Store on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 40Kms.
S.T Pole 13 Mtr long.
S.T Pole 11 Mtr long.
P.C.C POLE 8.5 Mtr long.
Carriage of All line Material from store to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Carriage of fallowings from JE Store to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 40Kms.
S.T Pole 13 Mtr long.
S.T Pole 11 Mtr long.
P.C.C POLE 8.5 Mtr long.
Carriage of All line Material from JE store to pit site as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Erection of Single support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of
Erection of D/P support including complete HT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of D/P support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of
Laying, sagging. Stringing and binding and jumpering of ACSR Weasel conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
Laying, sagging. XLPE Cable 3x70 . as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
fixing of Stay rod with Stay wire in proper way with Nozelling.
Grouting of Stay rods .
Resagging of loose and bad sag of L.T./H.T. line.
Tightening of Stay
Grouting of PCC/STP Pole Old
Change of broken/Damaged/Missing following Items :-
Disc Insulator
Pin Insulator
Nut & Bolt off size
Bended X-Arm/Angle/Channel
Ailment of PCC/STP Pole
L.T/F/Holding Clamps
Stay Clamps
Stay Insulator
Making of Plinth of the Damaged/Broken STP of the welded 03 Nos. Angle Iron piece with the Pole.
The folloing material is required to be supplied by the contractor.
Stay insulator.
Stay clamp.
Holding clamp.
L.T Clamps.
L.T Insulator.
F Clamps.
Bolt & nut off size.
M/S RAJ ASSOCIATES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .