Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹4,900
Closing Date
16 Sept 2026, 4:00 pm3d left
XEN REW Kathua
XEN REW Kathua
Const. of Road by way of Earthwork, Drain and Shingling from main raod to Sumbria Moh, W. No. 03, Pyt. Huttar, Block Billawar.
2026_RDPR_324096_31
e-NIT No.214/REW/K of 2026-27 Dated 10/09/2026 3rd call
Open Tender
Civil Works
Percentage
90 days
Billawar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹4,900
10 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
16 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1 meter from cutting edge in all kinds of soil. | 3.24 | Cum | 479.3 | ₹1,552.93 |
| 2 | Supplying and stacking at site Graded crushed stone aggregate of size of 63mm to 45mm. | 67.5 | Cum | 1,204.15 | ₹81,280.13 |
| 3 | Supplying and stacking at site good earth. | 5.4 | Cum | 281.3 | ₹1,519.02 |
| 4 | Providing and Laying Water Bound Macadam with specified stone aggregate screening and Binding material including screening, sorting to template and consolidation with road roller 80-100 KN capacity. Base course (63mm - 45mm size) including screening with good earth in one layer of 75mm thick (consolidated) | - | Cum | 768.15 | - |
| 5 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 180 | Cum | 187.3 | ₹33,714 |
| 6 | Providing and laying in position dry stone aggregarte. All work upto plinth level with(stone aggregate of 40mm nominal size ) including spreading, compacting, and consolidation in all respect. | 0.5 | Cum | 1,700 | ₹850 |
| 7 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 8.04 | Cum | 4,294.9 | ₹34,531 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 16.8 | Sqm | 286.35 | ₹4,810.68 |
| 9 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes | 4.8 | rmt | 2,415.8 | ₹11,595.84 |
| 10 | Add Provission for Citizen information Board including painting writing etc. all complet job and (Without detailed measurements of CIB board will not draw any kind of amount) | 1 | no. | 3,000 | ₹3,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.99 MB
BOQ_1092663.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .