Tender Value
₹26.6 L
EMD Value
₹53,120
Closing Date
15 May 2026, 11:00 pmClosed
Karnataka Power Transmission Corporation Limited
Md Shabaz Ahmed
Construction of TLI Section Office Building at 110KV Shahapur Sub-Station Premises.
KPTCL/2026-27/BD/WORK_INDENT3644
KPTCL/2026-27/BD/WORK_INDENT3644
Open
Buildings
Two Tender Document System(Two Cover)
KPTCL CEE Transmission Zone Office Kalburgi
6 documents required · 6 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
Refer NIT and tender document
Refer NIT and tender document
Refer NIT and tender document
Refer NIT and tender document
₹670
₹53,120
15 May 2026
30 Apr 2026
18 May 2026
14 May 2026
Attach Certificate for each work indicated above, in Format 1, obtained from the Competent Authority
Place
Countersigned by the Employer in charge
FORMAT 2
Information of the works for which Tenderer has submitted Tender
Project Name
Place
TENDERER (Signature & Seal)
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Estimate for Construction of TLI Section Office Building at 110KV Shahapur Sub-Station Premises
Footings
Portico Steps
Toilet Steps
Septic Tank
Total
Basic Rate
Deduct 5% per m³ for manual tamping
Total
i) Earthwork excavation
Footings
Septic Tank
ii) PCC bed
Building
Footings
Septic Tank L/W
Septic Tank S/W
ii) Footing
ST Ist Footing L/W
ST Ist Footing S/W
ST IInd Footing L/W
ST IInd Footing S/W
ST Bottom
ST Top upto GL
iii) Column upto GL
iv) Basment
Deductions for PB
Total
Footings
PB3 bottom bed
PB3 bottom bed
PB1 bottom bed
PB1 & 2 bottom bed
PB1 bottom bed
PB1 bottom bed
PB4 bottom bed
Flagging
Flagging
Proposed Toilet
Proposed Toilet Out
Proposed WC
Proposed WB+UR
Proposed Store
Portico Steps
Toilet Steps
Septic Tank L/W
Septic Tank S/W
Septic Tank bottom
others such as door openings etc.
Total
ST Ist Footing L/W
ST Ist Footing S/W
ST IInd Footing L/W
ST IInd Footing S/W
ST Bottom L/W
ST Bottom S/W
ST Top upto GL L/W
ST Top upto GL S/W
Total
Footings
F1 12@125 along 'l'
F1 12@125 along 'b'
F2 12@100 along 'l'
F2 12@100 along 'b'
F3 12@100 along 'l'
F3 12@100 along 'b'
Columns
Outer Stirrups 8mm @ 150 c/c
Inner Stirrups 8mm @ 150 c/c
Outer Stirrups 8mm @ 150 c/c
Inner Stirrups 8mm @ 150 c/c
C2 10#16 Slab Centre
Outer Stirrups 8mm @ 150 c/c
Inner Stirrups 8mm @ 150 c/c
Stirrups 8mm @ 150 c/c
Plinth Beams
PB1 top extra 2#16 End
PB1 top extra 2#16 End
PB1 bottom straight 2#16
PB1 bottom curtail 1#16
PB1 top straight 2#16
PB1 top extra 2#16 End
PB1 top extra 2#16 End
PB2 bottom Straight 3#16
PB2 bottom curtail 1#16
PB2 top straight 2#16
PB2 top extra 2#16 End
PB2 bottom Straight 3#16
PB2 bottom curtail 1#16
PB2 top straight 2#16
PB2 top extra 2#16 End
PB2 top extra 2#16 Mid
PB3 bottom straight 3#16
PB3 bottom curtail 1#16
PB3 bottom curtail 1#16
PB3 top straight 2#16
PB3 top extra 2#16 End
PB3 top extra 2#16 End
PB3 top extra 2#16 Mid
PB4 bottom straight 3#12
PB4 top straight 2#12
PB3 stirrups 8 @ 150 c/c
PB3 stirrups 8 @ 150 c/c
PB4 stirrups 8 @ 150 c/c
Lintels
L3 Bottom 2#12
L3 Stirrups 8mm @ 150 c/c
L2 & L3 Bottom 2#12
L2 & L3 Top 2#10
L2 & L3 Stirrups 8mm @ 150 c/c
L1 Stirrups 8mm @ 150 c/c
L2 Bottom 2#12
L2 Stirrups 8mm @ 150 c/c
L4 Bottom 2#10
L4 Stirrups 8mm @ 150 c/c
Chajja
R/S Main 10mm @ 150 c/c
R/S distribution 8mm @ 200 c/c
D1 Main 10mm @ 150 c/c
D1 distribution 8mm @ 200 c/c
W Main 10mm @ 150 c/c
W distribution 8mm @ 200 c/c
V Main 10mm @ 150 c/c
V distribution 8mm @ 200 c/c
Store Room Main 10 @ 150 c/c
Store Room Dist. 8 @ 200 c/c
Roof Beams
RB1 bottom 2#16
RB1 bottom curtail 1#16
RB1 top 2#16
RB1 top 2#16 extra End
RB1 top 2#16 extra Mid
Stirrups 8mm @ 150 c/c
RB1 bottom 2#16
RB1 bottom curtail 1#16
RB1 top 2#16
RB1 top 2#16 extra End
RB1 top 2#16 extra Mid
Stirrups 8mm @ 150 c/c
RB1 bottom 2#16
RB1 bottom curtail 1#16
RB1 bottom curtail 1#16
RB1 top 2#16
RB1 top 2#16 extra End
RB1 top 2#16 extra Mid
RB1 top 2#16 extra End
Stirrups 8mm @ 150 c/c
RB1 bottom 2#16
RB1 bottom curtail 1#16
RB1 top 2#16
RB1 top 2#16 extra End
Stirrups 8mm @ 150 c/c
RB2 bottom 2#16
RB2 bottom curtail 1#16
RB2 top 2#16
RB2 top 2#16 extra End
RB2 top 2#16 extra Mid
Stirrups 8mm @ 150 c/c
RB2 bottom 2#16
RB2 bottom curtail 1#16
RB2 top 2#16
RB2 top 2#16 extra End
Stirrups 8mm @ 150 c/c
RB3 bottom 2#16
RB3 bottom curtail 1#16
RB3 bottom curtail 1#16
RB3 top 2#16
RB3 top 2#16 extra End
RB3 top 2#16 extra Mid
RB3 top 2#16 extra End
Stirrups 8mm @ 150 c/c
RB3 bottom 2#16
RB3 bottom curtail 1#16
RB3 top 2#16
RB3 top 2#16 extra Mid
RB3 top 2#16 extra End
Stirrups 8mm @ 150 c/c
RB4 bottom 3#12
RB4 top 2#12
Stirrups 8mm @ 150 c/c
Roof Slab
S1 (Toilet) 8mm @ 150 c/c
S1 (Toilet) 8mm @ 150 c/c
S1 (Toilet) 8mm @ 150 c/c
S1 (Toilet) 8mm @ 150 c/c
S1 (Toilet out) 8mm @ 150 c/c
S1 (Toilet out) 8mm @ 150 c/c
S1 (Toilet out) 8mm @ 150 c/c
S1 (Toilet out) 8mm @ 150 c/c
S2 (JEE) 10mm @ 150 c/c
S2 (JEE) 10mm @ 150 c/c
S2 (JEE) 8mm @ 150 c/c
S2 (JEE) 8mm @ 150 c/c
S2 (Staff) 8mm @ 150 c/c
S2 (Staff) 8mm @ 150 c/c
S2 (Staff) 10mm @ 150 c/c
S2 (Staff) 10mm @ 150 c/c
S1 (WC) 8mm @ 150 c/c
S1 (WC) 8mm @ 150 c/c
S1 (WC) 8mm @ 150 c/c
S1 (UR+WB) 8mm @ 150 c/c
S1 (UR+WB) 8mm @ 150 c/c
S1 (UR+WB) 8mm @ 150 c/c
S1 (UR+WB) 8mm @ 150 c/c
S3 (Store) 10mm @ 150 c/c
S3 (Store) 10mm @ 150 c/c
S3 (Store) 10mm @ 150 c/c
S3 (Store) 10mm @ 150 c/c
S1 (Store) 8mm @ 150 c/c
S1 (Store) 8mm @ 150 c/c
S1 (Store) 8mm @ 150 c/c
S1 (Store) 8mm @ 150 c/c
S2 (Portico) 10mm @ 150 c/c
S2 (Portico) 10mm @ 150 c/c
S2 (Portico) 8mm @ 150 c/c
S2 (Portico) 8mm @ 150 c/c
ST Baffle wall beam 4#12
ST Baffle wall beam stirp 8@200
Septic Tank Slab 10 @ 150
Septic Tank Slab 10 @ 150
Total
Say Total
Footing
Total
Column (Footing to Parapet)
C2 (Upto ceiling)
C3 (Upto ceiling)
Total
Plinth Beam
Roof Slab
S1 Toilet+Toilet out
S1 WC+WB & UR
S1 Store Portion
S1 Toilet+Toilet out
S1 WC+WB & UR
S1 Store Portion
Septic Tank Roof Slab
Total
Flagging
Flagging
Water Tank bottom
Total
Lintel
Ded for column
Ded for column
Roof Beam
Ded for column
Ded for column
Total
Chajja R/S
Chajja D1
Chajja W
Chajja V
Loft (Store Room)
Loft (Store Room)
Total
Weather proofing to roof slab
Fillet L/W
Fillet S/W
Total
Roof Slab
Total
Wall (PB top to Roof Ceiling)
Parapet Wall
Parapet Wall
Portico Steps
Basement+Ist step
IIIrd
Toilet Steps
Basement+Ist step
IIIrd
Deductions
Rack Wall
Window
Ventilator
Column (Superstructure)
Column (Superstructure)
Column (Parapet)
Column (Parapet)
others etc.
Total
Rack Wall
Rack Short Walls
Rack Short Walls
Toilet S/W
ST inner wall
ST inner wall
Deductions
Opening
Total
Granite slab 20mm including both side polishing, nosing, chamfering etc.
Add overhead charges @ 10%
Add Contratractor profit @ 10%
Total
Racks
Racks
Total
Coping for parapet L/W
Coping for parapet S/W
Deductions
Column (Parapet)
Column (Parapet)
Total
Septic Tank Inner
Septic Tank Inner
Septic Tank Outer
Septic Tank Outer
Septic Tank bottom
ST inner wall
ST inner wall
ST inner wall top & bottom
Total
Front & Back Wall with para
Side walls with para
Slab long side
Slab short side
Slab outer ceiling L/Side
Slab outer ceiling S/Side
Parapet L/W in
Parapet S/W in
Parapet L/W top
Parapet S/W top
Column offset with para
Round Column
Chajja top & bottom R/S
Chajja side R/S
Chajja top & bottom D1
Chajja side D1
Chajja top & bottom W
Chajja side W
Chajja top & bottom V
Chajja side V
Portico Steps
Big Tread
Treads
Rises
Sides Ist step
IInd step
IIIrd step
Ivth step
Vth step
VIth step
Toilet Steps
Big Tread
Treads
Rises
Sides Ist step
IInd step
IIIrd step
Ivth step
Vth step
VIth step
Deductions
Window
Ventilator
others
Total
Toilet
Toilet Out
Store
Portico
Total
Toilet L/W
Toilet S/W
Toilet Out
JEE Room S/W
Staff L/W
WB & UR L/W
WB & UR S/W
Store L/W
Store S/W
Store Rack Walls
Loft (Store Room)
Loft (Store Room)
Deductions
Window
Ventilator
Others
Total
Rain water Downtake pipe
Total
D Posts
D Ventilator
D (Staff & Store) Head & Sill
D (JEE) Head
Total
D (Staff & Store) Shutter
D (JEE) Shutter
Total
Material Rate
Add Overhead Charges 10%
Add Contractors profit 10%
Total
Basic Rate
Add Overhead Charges 10%
Add Contractors profit 10%
Total
Total
Total
a) Aldrop (MS) 250mm long MR
Add fixing charges 10%
Add contractors profit 10%
Total
Add fixing charges 10%
Add contractors profit 10%
Total
Add fixing charges 10%
Add contractors profit 10%
Total
Add fixing charges 10%
Add contractors profit 10%
Total
Rolling Shutter
Total
W Grills
V Grills
Total
W Grills
V Grills
Total
21kg/sqm
(a) Window (two track)
(i) Frame
Top Horizontal
Bottom Horizontal
Vertical
(ii) Shutter section
Horizontal
Vertical (outer)
Vertical (interlock)
(b) Ventilator
(i) Frame
Horizontal
Vertical
Total
W glass
V glass
D ventilator glass
D1 ventilator glass
D2 ventilator glass
Total
Proposed Toilet Out
Skirting
Skirting
Skirting
Proposed Store
Skirting
Skirting
Skirting
Portico Step Tread
Portico Step Rise
Toilet Step Tread
Toilet Step Rise
Others
Total
Toilet
others such as door openings etc.
Total
Toilet L/W
Toilet S/W
UR & WB L/W
UR & WB S/W
Deductions
Others such as door sides etc.
Total
Material Rate
Transportation charges '10%'
Add contractors profit '10%'
Total
Material Rate
Add overheadcharges '10%'
Add contractors profit '10%'
Total
Material Rate
Add overheadcharges '10%'
Add contractors profit '10%'
Total
(b) 110mm dia (WC to ST)
Electrification
a) Short Point up to 3m from tapping point to outlet via switch
Sub-total
Total Rs
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender Capacit_formats.xlsx
Others - Refer NIT and tender document • 0.01 MB
Tender document Shahapur.docx
Tender Document • 0.08 MB
Self Declarations.docx
Others - Refer NIT and tender document • 0.03 MB
Shahapur 110 TLI Building Estimate.xls
Others - Estimate • 0.22 MB
nit 110kV Shahapur.doc
Instructions to Tenderers • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .