Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LRejected-Finance | ₹30.7 L | L1 | Rejected-Finance Due to administrative reason |
| 2 | L2₹32.4 LRejected-Finance | ₹32.4 L | L2 | Rejected-Finance Due to administrative reason |
| Sl No | Description | Qty | Unit | Sathish Kumar & Co L2 | TRadhakrishnanandco L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing PCC and RR mansory Flume channel ,clearing away and carefully stacking materials useful for re-use with with initial lead of 10m and initial lift of 2m Including cost of all materials, lead, lift, labour charges, etc., complete complying with standard specification and as directed by Engineer-in-charge | 164 | One cubic metre only 1 m3 | 680 ₹1,11,520 | 600 ₹98,400 |
| 2.00 | Earth work excavation and depositing on back with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, sheles, murram, gravel, stoney earth and earth mixed with small size boulders SS.20.B. Including tree roots, cost of all materials, lead, lift, labour charges, etc., complete. | 86 | One cubic metre only 1 m3 | 170 ₹14,620 | 150 ₹12,900 |
| 3.00 | Filling the foundation with M sand with watering proper consolidation including cost of all materials, lead, lift, labour charges etc., complete. | 44 | One cubic metre only 1 m3 | 2,000 ₹88,000 | 1,500 ₹66,000 |
| 4.00 | Providing and laying PCC 1:3:6 mix using 40mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge. | 55 | One cubic metre only 1 m3 | 6,000 ₹3,30,000 | 7,000 ₹3,85,000 |
| 5.00 | Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal with water proofing compound cost of all materials, lead, lift, curing, labour charges etc., complete. | 5 | One cubic metre only 1 m3 | 8,000 ₹40,000 | 7,500 ₹37,500 |
| 6.00 | Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal with water proofing compound cost of all materials, lead, lift, curing, labour charges etc., complete.
A.Base slab | 56 | One cubic metre only 1 m3 | 9,500 ₹5,32,000 | 10,000 ₹5,60,000 |
| 7.00 | Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal with water proofing compound cost of all materials, lead, lift, curing, labour charges etc.,
B.Stem (wall with form work) | 105 | One number only 1 No | 10,000 ₹10,50,000 | 11,000 ₹11,55,000 |
| 8.00 | Supplying and laying in position of RTS/TMT rods for reinforcement including transporting, cutting charges, bending, tying including cost of all materials, lead, lift, labour charges etc complete | 10,465 | One kilogiram only 1 KG | 100 ₹10,46,500 | 70 ₹7,32,550 |
| 9.00 | Supply of rubble and back filling the available earth (60%) with rubble(40%) including cost of consolidation by watering by layer by layer incuding cost of all materials,labor,lead,lift etc., complete | 37 | One cubic metre only 1 m3 | 400 ₹14,800 | 300 ₹11,100 |
| 10.00 | Supplying and fixing in position of Bitumen pad -12mm thick for expansion joint including cost of materials, labor, lead ,lift etc., complete complying with standard specification and as directed by Engineer-in-charge | 4 | One square metre only 1 m2 | 800 ₹3,200 | 800 ₹3,200 |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
15 Oct 2025, 2:00 pmClosed
SE/C/HP/ERODE
955, EVN Road, Erode
Improvement works to the existing of Flume channel running between Marapalam Weir and Punachi Pick Up weir by providing RCC for the bottom portion with bed slope of 1 in 300 and sides of the trapezoidal Channel with a slope of 1 in 1 from
2025_EB_610406_1
SECHPERDKadGenCircle04202526
Open Tender
Civil Works
KADAMPARAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹46,000
29 Jan 2026
30 Sept 2025
16 Oct 2025
30 Sept 2025
15 Oct 2025
30 Sept 2025
Dismantling the existing PCC and RR mansory Flume channel ,clearing away and carefully stacking materials useful for re-use with with initial lead of 10m and initial lift of 2m Including cost of all materials, lead, lift, labour charges, etc., complete complying with standard specification and as directed by Engineer-in-charge
Earth work excavation and depositing on back with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, sheles, murram, gravel, stoney earth and earth mixed with small size boulders SS.20.B. Including tree roots, cost of all materials, lead, lift, labour charges, etc., complete.
Filling the foundation with M sand with watering proper consolidation including cost of all materials, lead, lift, labour charges etc., complete.
Providing and laying PCC 1:3:6 mix using 40mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge.
Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal with water proofing compound cost of all materials, lead, lift, curing, labour charges etc., complete.
Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal with water proofing compound cost of all materials, lead, lift, curing, labour charges etc., complete. A.Base slab
Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal with water proofing compound cost of all materials, lead, lift, curing, labour charges etc., B.Stem (wall with form work)
Supplying and laying in position of RTS/TMT rods for reinforcement including transporting, cutting charges, bending, tying including cost of all materials, lead, lift, labour charges etc complete
Supply of rubble and back filling the available earth (60%) with rubble(40%) including cost of consolidation by watering by layer by layer incuding cost of all materials,labor,lead,lift etc., complete
Supplying and fixing in position of Bitumen pad -12mm thick for expansion joint including cost of materials, labor, lead ,lift etc., complete complying with standard specification and as directed by Engineer-in-charge
Dismantling the existing damaged Chipping of concrete and roughening of surface & carefully stacking away from the ste including all material lead, lift with necessary tools & tackles, safety equipments as per site engineer.
Plastering with CM 1:3, 10mm thick for wall portion in the tank inside and outside with water proofing compound including cost of scrubbing existing wall with all materials lead lift labour charges, etc complete as complying with standard specification and as directed by Engineer-in-charge
Sathish Kumar & Co (BID ID -1485375)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid