| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.4 LAccepted-AOC | ₹26.4 L | 1 | Accepted-AOC M/S KK Construction is L1 |
| 2 | 2₹26.6 LRejected-Finance 14 453 INDIRA NAGAR LUCKNOW UTTAR PRADESH | BIJNOR | UTTAR PRADESH | 246701 | ₹26.6 L | 2 | Rejected-Finance L2 |
| 3 | 3₹27.5 LRejected-Finance N A | PALWAL | HARYANA | 121004 | ₹27.5 L | 3 | Rejected-Finance L3 |
| 4 | 4₹28.1 LRejected-Finance | ₹28.1 L | 4 | Rejected-Finance L4 |
| 5 | 5₹29.7 LRejected-Finance 01 REWARI REWARI HARYANA 123401 | REWARI | HARYANA | 123401 | ₹29.7 L | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S ASHISH KUMAR L5 | M/S K.K. TRADERS L1 | M/S MAHAJAN CONSTRUCTION AND SUPPLIER L3 | M/S SHRI KANT MISHRA CONTRACTOR L4 | CHANDRA SEN L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Balli Piling of 100mm dia including cost of Balli and all cost of materials and labour etc. complete the work. | 781 | R.M. | 180 ₹1.4 L | 219.99 ₹1.7 L | 242.55 ₹1.9 L | 205.5 ₹1.6 L | 200 ₹1.6 L |
| 2.00 | Balli Bracing of 100mm dia including cost of Balli and all cost of materials and labour etc. complete the work. | 693 | R.M. | 170 ₹1.2 L | 149.99 ₹1.0 L | 194.66 ₹1.3 L | 164.64 ₹1.1 L | 150 ₹1.0 L |
| 3.00 | Earth work in excavation including lead upto 30m and lift upto 1.5m. excluding mechanical compaction, manual compaction and dressing and royality to complete profile. Earth work By Available Local earth | 1,553.13 | m3 | 115 ₹1.8 L | 49.99 ₹77,640.97 | 97.75 ₹1.5 L | 95.76 ₹1.5 L | 90 ₹1.4 L |
| 4.00 | Supplying and laying of nylon crate size 1mx1mx1m with mesh size 100mm x100mm with nylon rope of do not less than 3.5mm with filling empty cement bags with earth, placing at site and sewing with sutli etc. complete. | 803.57 | NO | 1,300 ₹10.4 L | 749.99 ₹6.0 L | 1,119.52 ₹9.0 L | 1,234.8 ₹9.9 L | 900 ₹7.2 L |
| 5.00 | Providing & Dumping Stone boulder 20 to 40Kg weight on the old crest/wire crate/side of balli Including all cost of material, labour, t&P complete the work. | 376.79 | m3 | 3,800 ₹14.3 L | 4,200.99 ₹15.8 L | 3,481.12 ₹13.1 L | 3,557.4 ₹13.4 L | 3,900 ₹14.7 L |
| 6.00 | Supply and laying of geotextile sheet made of 200GSM woven multifilament on the up streem slope of the new crest & T.E.D. including cost of all material, labour and T&P etc complete. | 985.6 | M2 | 60 ₹59,136 | 99.99 ₹98,550.14 | 66.5 ₹65,542.40 | 50.4 ₹49,674.24 | 70 ₹68,992 |
Tender Value
₹33.4 L
EMD Value
₹66,753
Closing Date
18 Apr 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, LUCKNOW DIVISION SHARDA NAHAR,
Re-Strengthening of Temporary diversion channel at Kudiyaghat for maintaining water level at gaughat pumping Station for constant water supply U/S harding bridge.
2026_UPIDC_1133574_2
01/EE/2026-27
Open Tender
Civil Works
14 days
Kudiyaghat lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹66,753
Yes
8 Jun 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Balli Piling of 100mm dia including cost of Balli and all cost of materials and labour etc. complete the work. | - | R.M. | - | - | itemH1Code1 |
| 2 | Balli Bracing of 100mm dia including cost of Balli and all cost of materials and labour etc. complete the work. | - | R.M. | - | - | itemH1Code1 |
| 3 | Earth work in excavation including lead upto 30m and lift upto 1.5m. excluding mechanical compaction, manual compaction and dressing and royality to complete profile. Earth work By Available Local earth | - | m3 | - | - | itemH1Code1 |
| 4 | Supplying and laying of nylon crate size 1mx1mx1m with mesh size 100mm x100mm with nylon rope of do not less than 3.5mm with filling empty cement bags with earth, placing at site and sewing with sutli etc. complete. | - | NO | - | - | itemH1Code1 |
| 5 | Providing & Dumping Stone boulder 20 to 40Kg weight on the old crest/wire crate/side of balli Including all cost of material, labour, t&P complete the work. | - | m3 | - | - | itemH1Code1 |
| 6 | Supply and laying of geotextile sheet made of 200GSM woven multifilament on the up streem slope of the new crest & T.E.D. including cost of all material, labour and T&P etc complete. | - | M2 | - | - | itemH1Code1 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.57 MB
Tendernotice_2.pdf
PDF • 1.90 MB
2026NIT01.pdf
Tender Documents • 7.56 MB
TSBund.pdf
Additional Documents • 8.63 MB
BIDDOCUMENTNIT012026.pdf
Tender Documents • 1.88 MB
BOQ_2122359.xls
BOQ • 0.34 MB
REETENDERNIT.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid