Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.7 LAccepted-Finance | ₹38.7 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹38.7 LRejected-Finance VILLAGE NUSRATABAD KHARKHADI POST LONI DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹38.7 L | L2 | Rejected-Finance Upper |
Tender Value
₹38.8 L
EMD Value
₹3.9 L
Closing Date
30 Apr 2026, 5:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA PARISHAD LONI GHAZIABAD
Construction work In Npp Loni Work No 8
2026_DOLBU_1139998_8
129/NPPLONI/2026-27 DATE 20-04-2026
Open Tender
Civil Works
45 days
NAGAR PALIKA PARISHAD LONI GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,602
EXECUTIVE OFFICER
₹3.9 L
11 May 2026
21 Apr 2026
1 May 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar DSR NO. 15.7.4 | - | CUM | - | - | - |
| 2 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 3031 (With Ordinery Earth in Patri work) up to 15 km | - | CUM | - | - | - |
| 3 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 4 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technicalspecification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge. | - | QTL | - | - | BI01010001010000000000000515BI0100001113 |
| 5 | Plain/reinforced cement concrete (Grade M20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 6 | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80- 100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-3 as per Technical Specification Clause 405. | - | CUM | - | - | - |
| 7 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. Gray Base | - | SQM | - | - | - |
| 8 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.Colour Base | - | SQM | - | - | - |
| 9 | Plain/reinforced cement concrete M20 (1:2:4) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 | - | SQM | - | - | - |
| 10 | Supply of fixing of Board | - | NO | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_2128656.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid