Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹4,360
Closing Date
3 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (Civil)
BSNL Civil Division Room No 212 Second Floor BSNL PGM Office Building Bharathi Park Road 2 Coimbatore 641043
Supply and Erection of 9 M GI Coupled poles and Dismantling existing 15M Coupled MARR Tower at Anupparpalayam RTT site, Coimbatore ( 2nd call )
2023_BSNL_146255_1
NIT NO 026/BSNL/CD/CBE/2022-23
Open Tender
Civil Works
Item Rate
60 days
Anupparpalayam
As per Tender Document
4 documents required · 4 mandatory
₹590
Yes
AO CASH BSNL COIMBATORE
₹4,360
Yes
6 Mar 2023
20 Feb 2023
6 Mar 2023
20 Feb 2023
3 Mar 2023
20 Feb 2023
Amount
Demolishing R.C.C. work by mechanical means using heavy duty demolition hammer / tractor compressor breaker without damaging nearby strutures including stacking of steel bars and shifting and dumping of unserviceable material from Terrace to Ground for the disposal as per direction of Engineer - in- charge. (Necessary safety measures shall be adopted while demolishing the tower RCC base structures to ensure the safety of men and materials and adjacent properties. Cost of disposal of rubbish, debrises at approved municipal dumping ground will be paid seperately)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand(zone-III) including manufactured sand derived from Recycled concrete aggregate (RCA) up to 25% : 4 graded stone aggregate 20 mm nominal size including Recycled concrete aggregate (RCA) )
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand incuding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20% : 3 graded stone aggregate 20 mm nominal size RecycledConcrete Aggregate (RCA) upto 20%
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)Recycled Concrete Aggregate (RCA) upto 20% : 3 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 20%).
Centering and shuttering including strutting, propping etc. and removal of form for :
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Welding by gas or electric plant including transportation of plant at site etc. complete.
12 mm cement plaster of mix :
1:6 (1 cement: 6 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.
On steel work
Supplying of 9m/6m Pole material of Galvanised Structural steel tubular hot finished welded type tubes of not not less than medium grade pipes, including cutting welding to gusset plates etc, fabricated as per approved drawing. The galvanizing shall be as per IS: 4759 with average mass of zinc coating of 610 gm/sqm (approximately 85 micron). Cost of galvanization is inclusive. The payment shall be made as per the standard structural steel tables for the tube portion only for the bare steel sectional weights. Gusset plates etc will be measured under structural steel work. All complete as directed by the Engineer-in-Charge
Erection of Coupled Poles consisting tubular sections of 3m segments including their support angles with necessary tools and plants, at terrace level of the building to the existing RCC foundation / Columns, icluding cost of lifting of material from ground floor:
9m Poles (3 x 3m height)
Providing and fixing 6 mm thick G.I rope for stay wire with clamps, handle clips, hooks for tightening, saddles, G.I tightener 250 mm length, coach screw 120 mm length, turn buckles etc., including making holes in the walls / Slab for fixing steel plate and angles using nuts and bolts and covering the plates and bolt using cement concrete 300 x 300 x 300 mm thick for thick for anchoring at three places all as directed by the Engineer-in-charge.
Dismantling of G.I. tower materials like pipes, 'L' angle, Tee angle, plates, bolts and nuts, including anchor bolts, earthing strips etc, manually from RTT 15m height MARR tower installed on Terrace of the building, including oiling, greasing the joints and making all safety measures during dismantling of tower to protect the building not to happen any damages. The cost includes demolishing of concrete for taking out of tower base which embedded into the concrete, all as directed by the Engineer-in-charge.
15m MARR tower
Transportation of G.I. material like angle, Tee, pipe, plates, bolts and nuts etc. stacked at Ground level at site of work, from Anupparpalayam to BSNL store or any other location within the disrance of 15.0 Km. The charges includes loading, unloadingand and stacking etc. complete as per the direction of Er-in-C.
a) 15m MARR tower
Shifting of Tower materials from roof top ( Terrace) to Ground level using pulley arrangements and necessary scaffolding arrangements. Care should be taken to avoid any untoward incidence and and damage to existing structure.
a) 15m MARR tower
Credit item for reinforcement TMT bars and M.S. anchor boltrecovered from demolished R.C.C, all directed by the Engineer-in-charge.
S.PANDIARAJAN
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .