Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Finance CHANDAUTI | CHANDAULI | UTTAR PRADESH | -0.03% | ₹9.7 L | L1 | Admitted-Finance |
| 2 | L2₹9.7 L+₹193.49 (0.02%)Admitted-Finance | -0.01% | ₹9.7 L+₹193.49 (0.02%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
6 Jul 2026, 11:00 amClosed
EO NPP KUSHINAGAR
NPP KUSHINAGAR
Construction of a boundary wall at Tetariya Math in Ward No. 11 Vivekanand Nagar.
2026_DOLBU_1162562_35
284/NPPK/2026-27 DATE 20-06-2026
Open Tender
Civil Works
Percentage
45 days
WARD NO. 11
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,744
EO NPP KUSHINAGAR
₹1.7 L
18 Jul 2026
22 Jun 2026
6 Jul 2026
22 Jun 2026
6 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in ordinary soil (loam, clay & sand) including liftupto 1.50 m and lead upto 30 cm including filling, watering and raming of excavated earth into the trenches or in the plinth and removal and disposal of surplus earth as directed by the Eng. including upto a distance of 30 mtr from foundation as per (S.l.No.251) | 1 | cum | 120 | ₹119.88 |
| 2 | conncreate with 40mm gauge brick blast] fine sand of 1.25 FM and cement in the proportion of 8:4:1 | 1 | cum | 3,635 | ₹3,631.37 |
| 3 | M-20 class R.C.C work with cement approved coarse sand 20mm gauge stone grit in proportion of 1:1.5:3 in foundation and footing excluding the supply of rainforcement and its bending but including its bidding the same with 24 BWG HI binding wire and alos including providing & fixing necessary centering and shuttering and its removal after completion of work & supply of all other materials labour T&P etc. Required for the proper completion of the work. As per (S.l.No.284A) | - | cum | 7,190 | - |
| 4 | Same as in item no. 3 for column | - | cum | 8,960 | - |
| 5 | Class 150 sub class 'A' brick work in 1:4 cement & coarse sand mortor in foundation & up to plinth including supply of all materials and tools and plants etc. required for proper completion of the work . As per (S.l.No305) | 1 | cum | 4,355 | ₹4,350.65 |
| 6 | Same as in item no. 5 for plinth | 1 | cum | 7,510 | ₹7,502.49 |
| 7 | Same as in item no. 3 for lintel band | 1 | cum | 7,735 | ₹7,727.27 |
| 8 | Same as in item no. 3 for super structure | - | cum | 4,845 | - |
| 9 | 12 mm thick plaster with 1:6 cement and fine sand morter on brick work including ranking and joint washing and cleaning and including supply of all materials labour and T&P etc. required for proper completion of work. As per S.l.No 586+596 | - | sqm | 127 | - |
| 10 | Finishing wall with water proof cement paint of approved make and quality on new work with three coats to give an even shade including supply of all materials labour and T&P etc. required for proper completion of work as per S.l.No 660 & 661 | - | sqm | 65 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.51 MB
BOQ_2179132.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .