Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Rejected-Technical | Rejected-Technical Disqualify |
| 4 | Rejected-Technical | Rejected-Technical Dis Qualified |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
7 Oct 2026, 1:00 pmClosed
EE ID FIRST KARVI
EE ID FIRST KARVI
Scrapping and Jungle Clearance of Ohan eastern Canal from km. 0.000 to 26.080.
2026_UPIDC_1190524_5
01/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
ID 1
Scrapping and Jungle Clearance of Ohan eastern Canal from km. 0.000 to 26.080.
2 documents required · 2 mandatory
₹1,154
₹23,000
Yes
9 Oct 2026
28 Sept 2026
7 Oct 2026
28 Sept 2026
7 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle Clearance with Cutting heavy undergrowth and bushes upto 7.5 cm diameter including all cost of labour , T&P etc
ohan Eastern canal | 46,161.6 | sq.m | - | - |
| 2 | Scrapping of canal bed and slope/berm including earth up to 7.5 cm all complete as per direction by Engineer in charge
ohan Eastern canal | 1,79,283.18 | sq.m | - | - |
| 3 | Earthwork in Mar, Rankar and Kankar mixed soils in excavation for removal of thek from internal section of canal including lead upto 30 m and lift of 1.5m with dressing, and disposal etc as directed by Engineer in charge | 944.9 | M3 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BOQ_2244076.xls
BOQ • 0.29 MB
BID.pdf
Tender Documents • 6.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .