Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAccepted-AOC APPOLO VIHAR CHANDRASEKHARPUR BBSR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | ₹31.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹31.9 LSame as L1Rejected-AOC | ₹31.9 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹31.9 LSame as L1Rejected-AOC AT SANA MUNDALI P O MUNDALI COLONY P S BARANGA DIST CUTTACK PIN 754006 | CUTTACK | CUTTACK | ODISHA | 754006 | ₹31.9 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹31.9 LSame as L1Rejected-AOC | ₹31.9 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹31.9 LSame as L1Rejected-AOC | ₹31.9 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹31.9 L
EMD Value
₹31,900
Closing Date
12 Jun 2026, 5:00 pmClosed
Executive Engineer, CD-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of Cremation hall and Redevelopment of cremation pindi in cemetery of sartol in ward no -51.
2026_ORULB_128796_5
MC(CMC)CTC_Div-IIINo9/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹31,900
Yes
15 Sept 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. | - | Cum | 299.52 | - |
| 2 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of the Engineer-in-charge. | - | Cum | 612.7 | - |
| 3 | Providing Cement concrete (1:3:6) with 4cm size hard granite metal (c.b) including cost of all labour, materials with all taxes, lead, royalty T & P etc all complete. | 1 | Cum | 6,393.8 | ₹6,387.41 |
| 4 | Single under reamed pile foundation with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel.Single under Ream Pile.a) 375 mm dia and 9.0 metre long | - | Cum | 1,359.1 | - |
| 5 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . | - | Cum | 6,844.75 | - |
| 6 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . | 1 | Cum | 7,666.31 | ₹7,658.64 |
| 7 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete (COLUMN). | - | Cum | 16,712.33 | - |
| 8 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . | - | Each | 13,903.58 | - |
| 9 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete .BEAM | - | Sqm | 16,712.33 | - |
| 10 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete. | 1 | Cum | 13,261.82 | ₹13,248.56 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_595007.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_595007.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .