| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | L1 | Accepted-AOC L1 Accept | |
| 2 | L2₹8.2 L+₹33,924.96 (4.34%)Rejected-Finance | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | M SANTHI L1 | BALASUBRAMANIAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of Kalaiarangam at Kumulur Kalikovil Near in Karur Panchayat. | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 21.48 | cum | 263.78 ₹5,665.99 Lowest | 400 ₹8,592 |
| 3.00 | Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete | 11.77 | cum | 599.96 ₹7,061.53 Lowest | 800 ₹9,416 |
| 4.00 | Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 4.06 | cum | 2,116.84 ₹8,594.37 Lowest | 2,500 ₹10,150 |
| 5.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to work site and all labour charges for mixing,laying and curing etc.complete. | 6.99 | cum | 5,939.97 ₹41,520.39 Lowest | 6,300 ₹44,037 |
| 6.00 | R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance of materials to work site and all labour charges for mixing,laying and curing etc.complete. | 14.19 | cum | 9,532.9 ₹1,35,271.85 Lowest | 9,532.9 ₹1,35,271.85 Lowest |
| 7.00 | Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of materials to work site and all labour charges etc.complete. | 9.17 | cum | 6,426.95 ₹58,935.13 Lowest | 7,500 ₹68,775 |
| 8.00 | Cost and supply of steel with fabrication including cost of steel and binding wire complete with standard specification etc.,complete | 1.9 | MT | 65,328.95 ₹1,24,125.01 Lowest | 65,328.95 ₹1,24,125.01 Lowest |
| 9.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of materials to work site and all labour charges etc.complete. | 111.36 | Sqm | 1,095 ₹1,21,939.2 Lowest | 1,095 ₹1,21,939.2 Lowest |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then b | 80.68 | Sqm | 308.85 ₹24,918.02 Lowest | 308.85 ₹24,918.02 Lowest |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
23 Feb 2026, 3:00 pmClosed
Bdo.Avudaiyarkoil
Pt.Union Office,Avudaiyarkoil
Construction of Kalaiarangam at Kumulur Kalikovil Near in Karur Panchayat
2026_RDTN_659137_1
Avk/MLACDS/Work
Open Tender
Civil Works
Item Rate
Avudaiyarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
17 Mar 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
Construction of Kalaiarangam at Kumulur Kalikovil Near in Karur Panchayat.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to work site and all labour charges for mixing,laying and curing etc.complete.
R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance of materials to work site and all labour charges for mixing,laying and curing etc.complete.
Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of materials to work site and all labour charges etc.complete.
Cost and supply of steel with fabrication including cost of steel and binding wire complete with standard specification etc.,complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of materials to work site and all labour charges etc.complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then b
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of materials to work site and all labour charges etc.complete.
Weathering Course Concrete to 80 mm thickness (average) using 20mm size Brick jelly with slacked lime in the proportion 32:12:50 (No sand to be used) including cost and conveyance of materials to work site and all labour charges etc.complete.
Finishing top of roof with one layer of Pressed Tiles of size 20 cm x 20cm x 20mm embedded in Cement Mortor 1:3 mix mixed with Water Proofing compound and pointed with same mixed mortor to full depth of tiles including cost and conveyance of materials to
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth including cost and conveyance of materials to work site and all labour charges etc.complete.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 17 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_790794.xls
BOQ • 0.50 MB
Avk-document.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .