Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.1 CrAccepted-AOC KOLASIB MIZORAM | NA | NA | 796186 | 1 | Accepted-AOC L1 | |
| 2 | 2₹23.1 Cr+₹22,069.65 (<0.01%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹24.3 Cr+₹1.2 Cr (5.27%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | 4₹25.7 Cr+₹2.6 Cr (11.1%)Rejected-Finance | 4 | Rejected-Finance 4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Non Responsive. Please Check Minutes of Evaluation |
| Sl No | Description | Qty | Unit | Laltlanmawia L1 | Zosangzuala L3 | Northeast Consultancy Services L2 | Nidhi Creative Infrastructure (P) Ltd. L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Construction of unlined side drain
Earthwork in excavation for structures as per drawing and technical Specification Clause 305.1. including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material.
I. Ordinary soil
(i) Upto 3m depth | 4,876.2 | cum | 458.33 ₹22,34,908.75 | 408.7 ₹19,92,902.94 | 415.12 ₹20,24,232.52 | 350 ₹17,06,670 Lowest |
| 2.00 | Earthwork in excavation for structures as per drawing and technical Specification Clause 305.1. including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material. | 61.2 | cum | 458.33 ₹28,049.8 | 408.7 ₹25,012.44 | 415.12 ₹25,405.65 | 180 ₹11,016 Lowest |
| 3.00 | Providing concrete for plain/reinforced
concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
I. PCC Grade M10
ii) Nominal mix 1:3.6 (Hand mixing) | 15.3 | Cum | 12,342.66 ₹1,88,842.7 | 10,411.02 ₹1,59,288.61 | 11,179.23 ₹1,71,042.22 | 9,639 ₹1,47,476.7 Lowest |
| 4.00 | Brick masonry work in cement mortar in
foundation complete excluding pointing
and plastering as per drawing and
technical specifications Clauses 600,
1202 & 1203
I. Brick masonry in 1:3 cement mortar | 13.5 | Cum | 14,412.28 ₹1,94,565.78 | 16,491.68 ₹2,22,637.68 | 1,327.35 ₹17,919.22 Lowest | 19,608.16 ₹2,64,710.16 |
| 5.00 | Compacting Original Ground.
(ii) Compacting original ground supporting subgrade.
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers for subgrade construction as per Technical Specification Clause 303.5.2. | 13,975.5 | Cum | 89.33 ₹12,48,431.42 Lowest | 112.58 ₹15,73,361.79 | 94 ₹13,13,697 | 119.1 ₹16,64,482.05 |
| 6.00 | Scarifying Existing Bituminous Surface.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Existing BT 3.75m Damaged & Existing BT 3.00m | 59,895 | Sqm | 21.78 ₹13,04,513.1 | 15.46 ₹9,25,976.7 Lowest | 18 ₹10,78,110 | 22.92 ₹13,72,793.4 |
| 7.00 | Lime Stabilisation for Improving Subgrade
Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum 70 per cent of contents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per Technical Specification Cluase 403.
A. By Manual Means | 4,658.5 | Cum | 1,268.72 ₹59,10,332.12 Lowest | 1,417.73 ₹66,04,495.21 | 1,270.72 ₹59,19,649.12 | 1,334.6 ₹62,17,234.1 |
| 8.00 | Granular Sub-Base with well graded material (Table 400.1)
(A) By Mix in Place Method.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix-in-place method with rotavator at OMC, and compacting with smooth wheeled roller to achieve the desired density, complete as per technical specification clause 401.
(i) For Grading I Material. | 5,823.13 | Cum | 3,242.44 ₹1,88,81,133.43 Lowest | 3,885.03 ₹2,26,23,015.32 | 3,611.11 ₹2,10,27,944.92 | 4,500 ₹2,62,04,062.5 |
| 9.00 | Water Bound Macadam Sub-base/base
2) WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100KN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill up the entertices of coarse aggregate, watering and compacting to the required density grading 2 as per technical specification clause 405.
B) By Mechanical means. | 10,617.75 | Cum | 4,719.72 ₹5,01,12,807.03 Lowest | 5,138.05 ₹5,45,54,530.39 | 4,975 ₹5,28,23,306.25 | 4,995 ₹5,30,35,661.25 |
| 10.00 | (3) WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
B) By Mechanical means. | 10,617.75 | Sqm | 4,638.32 ₹4,92,48,522.18 Lowest | 5,138.05 ₹5,45,54,530.39 | 4,917.74 ₹5,22,15,333.88 | 4,995 ₹5,30,35,661.25 |
Tender Value
₹25.7 Cr
EMD Value
₹25.7 L
Closing Date
20 May 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive Officer, MiRRDA
Tuikhuatlang, Aizawl, Mizoram
Upgradation and Maintenance of Bairabi to Zamuang Road
2024_MZPWD_133720_1
1/MiRRDA/2024
Open Tender
Civil Works - Roads
Item Rate
540 days
Bairabi
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹25.7 L
14 Aug 2024
8 Apr 2024
21 May 2024
8 Apr 2024
20 May 2024
8 Apr 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of unlined side drain
Earthwork in excavation for structures as per drawing and technical Specification Clause 305.1. including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material.
I. Ordinary soil
(i) Upto 3m depth | 4,876.2 | cum | - | - |
| 2 | Earthwork in excavation for structures as per drawing and technical Specification Clause 305.1. including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material. | 61.2 | cum | - | - |
| 3 | Providing concrete for plain/reinforced
concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
I. PCC Grade M10
ii) Nominal mix 1:3.6 (Hand mixing) | 15.3 | Cum | - | - |
| 4 | Brick masonry work in cement mortar in
foundation complete excluding pointing
and plastering as per drawing and
technical specifications Clauses 600,
1202 & 1203
I. Brick masonry in 1:3 cement mortar | 13.5 | Cum | - | - |
| 5 | Compacting Original Ground.
(ii) Compacting original ground supporting subgrade.
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers for subgrade construction as per Technical Specification Clause 303.5.2. | 13,975.5 | Cum | - | - |
| 6 | Scarifying Existing Bituminous Surface.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Existing BT 3.75m Damaged & Existing BT 3.00m | 59,895 | Sqm | - | - |
| 7 | Lime Stabilisation for Improving Subgrade
Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum 70 per cent of contents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per Technical Specification Cluase 403.
A. By Manual Means | 4,658.5 | Cum | - | - |
| 8 | Granular Sub-Base with well graded material (Table 400.1)
(A) By Mix in Place Method.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix-in-place method with rotavator at OMC, and compacting with smooth wheeled roller to achieve the desired density, complete as per technical specification clause 401.
(i) For Grading I Material. | 5,823.13 | Cum | - | - |
| 9 | Water Bound Macadam Sub-base/base
2) WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100KN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill up the entertices of coarse aggregate, watering and compacting to the required density grading 2 as per technical specification clause 405.
B) By Mechanical means. | 10,617.75 | Cum | - | - |
| 10 | (3) WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
B) By Mechanical means. | 10,617.75 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_209681.xls
BOQ • 0.26 MB
143129675.pdf
Tender Documents • 0.54 MB
143129677.html
Tender Documents • 0.05 MB
BZRoad.pdf
Tender Documents • 1.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .