Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 CrQualified | ₹22.7 Cr | L1 | Qualified MII |
| 2 | L2₹22.7 CrQualified SOCIETY ROAD MUMBAI MUMBAI MAHARASHTRA 400056 | MUMBAI SUBURBAN | MAHARASHTRA | 400056 | ₹22.7 Cr | L2 | Qualified MII |
Tender Value
₹46.1 Cr
EMD Value
₹71.1 L
Closing Date
1 Mar 2024, 6:00 pmClosed
Supply of 04 Nos Rubber Removal Machines with Operation
5990512
GEM/2024/B/4569951
Two Packet Bid
Basic Cost for Supply of RRM,Transportation Cost,Transit Insurance Cost,Operations and Routine Main
365 days
Tamil Nadu; Kanchipuram, Tamil Nadu; 24 Paraganas North, West Bengal; West Tripura
Total value wise evaluation
BOQ
8 documents required · 8 mandatory
1 yrs
₹3
₹71.1 L
13 Apr 2024
2 Feb 2024
1 Mar 2024
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Basic Cost for Supply of RRM | As per ATC document | 1 | pieces | techchn_1 | 365 |
| 2 | Transportation Cost | As per ATC document | 1 | pieces | techchn_1 | 365 |
| 3 | Transit Insurance Cost | As per ATC document | 1 | pieces | techchn_1 | 365 |
| 4 | Operations and Routine Maintenance Cost for 1st year at the rate of 5.88 percent of Basic Cost | As per ATC document | 1 | pieces | techchn_1 | 730 |
| 5 | Operations and Routine Maintenance Cost for 2nd year at the rate of 6.23 percent of Basic Cost | As per ATC document | 1 | pieces | techchn_1 | 1095 |
| 6 | Operation and CAMC Cost for 1st year after DLP at the rate of 6.60 percent of Basic Cost | As per ATC document | 1 | pieces | techchn_1 | 1460 |
| 7 | Operation and CAMC Cost for 2nd year after DLP at the rate of 7.00 percent of Basic Cost | As per ATC document | 1 | pieces | techchn_1 | 1825 |
| 8 | Operation and CAMC Cost for 3rd year after DLP at the rate of 7.42 percent of Basic Cost | As per ATC document | 1 | pieces | techchn_1 | 2190 |
| 9 | Operation and CAMC Cost for 4th year after DLP at the rate of 7.86 percent of Basic Cost | As per ATC document | 1 | pieces | techchn_1 | 2190 |
| 10 | Operation and CAMC Cost for 5th year after DLP at the rate of 8.34 percent of Basic Cost | As per ATC document | 1 | pieces | techchn_1 | 2190 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_5990512.pdf
GEM_BID
technical_specification_of_rrm_2024-02-02-12-25-17_e67c7222c1553bdada68f63e6e76f3fa.pdf
BOQ
boq_2024-02-02-12-25-17_25a0e7451de9d7e54813ca6ba7fc28f9.csv
BOQ
RRMATCF_ff2bfb42-a4aa-4198-b3501706878844508_dgmtechchq.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid