Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L Quoted ₹1.3 L | L1 | Accepted-AOC As per TC recommendation and approval of competent authority. |
| 2 | L2₹1.8 L+₹52,000 (40.6%)Rejected-Finance | ₹1.8 L+₹52,000 (40.6%) | L2 | Rejected-Finance As per TC recommendation and system generated BOQ. |
| Sl No | Description | Qty | Unit | Ranjan Associates L2 | M/S ADVANCE ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of the take-up pulley floor area, removal of bent or damaged guide pipes, and dismantling of the existing take-up pulley frame structure. It also includes the complete removal of old, rusted, and damaged side support beams, bottom supports, and the chequered floor plates. Additionally, the work covers the dismantling of the counterweight area, including the removal of damaged counterweights and associated ropes. | 1 | Job | 60,000 ₹60,000 | 40,000 ₹40,000 Lowest |
| 2.00 | Fabrication of proper supports and lifting hooks for safely handling and positioning the new steel structure, including beams, channels, angles, and plates, at the required elevated location of the counterweight area. It also involves the fabrication and installation of new bottom side beams, chequered floor plates, and bottom angle/channel supports beneath the take-up floor, along with the fabrication of a new guide pipe or rail system to facilitate the movement of the take-up mechanism. | 1 | Job | 60,000 ₹60,000 | 40,000 ₹40,000 Lowest |
| 3.00 | Installation of fabricated beams, side supports, chequered plates, bottom supports, and side railings on the take-up floor platform. It also involves fixing guide rails or pipes to facilitate the take-up movement, ensuring proper alignment with the take-up pulley and counterweight structure. Additionally, the work includes the precise alignment of the take-up pulley and strengthening of the take-up pulley mounting structure to ensure stability and operational reliability. | 1 | Job | 60,000 ₹60,000 | 48,000 ₹48,000 Lowest |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | No. | - | - |
Tender Value
₹2.4 L
EMD Value
₹3,000
Closing Date
13 Nov 2025, 11:30 amClosed
Staff Officer(EnM), Amlohri Area
Office of Area General Manager, Amlohri Area, NCL, Singrauli - 486887
Minor repairing and Maintenance of take up floor structure and guide pipe/rails of conveyor 10C in Amlohri CHP Phase-II.
2025_NCL_346568_1
AML/SO/ENM/ETN/25/649
Open Tender
Miscellaneous Works
Item Rate
15 days
Amlohri Project, NCL
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
26 Jun 2026
1 Nov 2025
14 Nov 2025
1 Nov 2025
13 Nov 2025
3 Nov 2025
1 Nov 2025 - 8 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.09 MB
BOQ_359249.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .