Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -29.50% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹63.1 L (41.8%)Admitted-Finance | -0.01% | ₹2.1 Cr+₹63.1 L (41.8%) | L2 | Admitted-Finance |
| 3 | L2₹2.1 Cr+₹63.1 L (41.8%)Admitted-Finance | -0.01% | ₹2.1 Cr+₹63.1 L (41.8%) | L2 | Admitted-Finance |
| 4 | L2₹2.1 Cr+₹63.1 L (41.8%)Admitted-Finance | -0.01% | ₹2.1 Cr+₹63.1 L (41.8%) | L2 | Admitted-Finance |
| 5 | L2₹2.1 Cr+₹63.1 L (41.8%)Admitted-Finance NEAR GOVT MEDICAL POST DIST MALKANGIRI 764045 | MALKANGIRI | MALKANGIRI | ODISHA | 764045 | -0.01% | ₹2.1 Cr+₹63.1 L (41.8%) | L2 | Admitted-Finance |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
19 Jun 2026, 5:30 pmClosed
PAITDA, MALKANGIRI
ITDA OFFICE NEAR TELEPHONE EXCHANGE MALKANGIRI
Construction of Tribal Museum at Malkangiri in Malkangiri Block
2026_STSCD_130153_1
ITDAMKG-02/2026-27
Open Tender
Civil Works - Buildings
Percentage
330 days
Malkangiri
B and A
2 documents required · 2 mandatory
₹10,000
₹2.1 L
Yes
25 Jun 2026
30 May 2026
20 Jun 2026
30 May 2026
19 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all kind of soil within 50M intial lead and 1.5M initial lift including rough dressing levelling the bed and breaking clods to maximum 5 cm to 7 cm and laying the layers not exceeding 0.3M depth and as per specification approved by the Department.and as directed by the E.I.C. | 355.85 | 1 cum | 311.53 | ₹1,10,857.95 |
| 2 | Supplying & Filling foundation trenches , plinth & ditches with clean course river sand well watered and rammed in layers not exceeding 23 c.m. in depth with all lead and lift including cost, conveyance, loading, unloading, stacking,royalties and all taxes of sand,cost & conveyance of water, cost of all Labour,labour cess,T&P required for the work etc. complete in all respect as directed by the Engineer- in -charge. | 917.05 | 1 cum | 758.9 | ₹6,95,949.25 |
| 2.01 | Supplying & filling foundation and Plinth with Excavated earth (2/3 rd Rate of excavation ) | 118.62 | 1 cum | 207.68 | ₹24,635 |
| 3 | Cement concrete in proportion (1:4:8) in foundation and floors using 4 cm size (3/2") clean hard black crusher broken granite metal free from skin & weather skin of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15 cm (6")thick to the required level, ramming, compacting to proper thickness, watering and curing etc. complete with cost conveyance, royalty and all taxes of materials, cost of labour, T &P and machineries etc. completed with all lead lift and delift including centering & shuttering if necessary, in all respect to the specification and as directed by the Engineer-in-charge. | 65 | 1 sqm | 5,545.55 | ₹3,60,460.75 |
| 3.01 | Cement concrete (1:3:6) in foundation using 40 mm size clean hard black broken granite metal of approved quality from approved quarry. Metal free from weathered & skin with cost, conveyance, royalty and taxes of all materials & Labour etc. including curing, dewatering if required complete in all respect as directed by the Engineer-in-charge. | 175.9 | 1 sqm | 5,915.35 | ₹10,40,510.07 |
| 4 | R.C.C. work of M-25 grade having a minimum compressive strength (in work test) of 200 Kg/cm.sq in 15 cm. Cubes at 28 days with IS 456 and 516 using 20 mm size down graded (20mm Not to exceed 25 %) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying and compaction with mechanical vibrators, watering and curing for 4 weeks, (Including centering, shuttering) and finishing the exposed surfaces smooth with cost, conveyance, royalties and taxes of all materials and labour with T&P, with all lead lift and delifts required for the work etc. complete in all respect with proper specification for all structural components as mentioned below and as directed by the Engineer-in-charge.
I) Foundation and Pedestal | 46.69 | 1 cum | 6,711.5 | ₹3,13,359.94 |
| 4.01 | II) Column, Pedestal to Ground level | 8.13 | 1 cum | 18,533.5 | ₹1,50,677.36 |
| 4.02 | III) Plinth Beam | 53.33 | 1 cum | 6,711.5 | ₹3,57,924.3 |
| 4.03 | IV) Column | 31.07 | 1 cum | 18,533.5 | ₹5,75,835.85 |
| 4.04 | V) Beam | 20.8 | 1 cum | 16,094.15 | ₹3,34,758.32 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_593278.xls
BOQ • 0.32 MB
DTCN2.pdf
Tender Documents • 2.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .