Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Fee/PreQual/Technical/Finance | -37.90% | ₹7.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.7 L+₹1,231.93 (0.16%)Admitted-Fee/PreQual/Technical/Finance | -37.80% | ₹7.7 L+₹1,231.93 (0.16%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.1 L+₹46,689.99 (6.10%)Admitted-Fee/PreQual/Technical/Finance | -34.11% | ₹8.1 L+₹46,689.99 (6.10%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.2 L+₹54,081.54 (7.07%)Admitted-Fee/PreQual/Technical/Finance | -33.51% | ₹8.2 L+₹54,081.54 (7.07%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹8.3 L+₹60,487.56 (7.91%)Admitted-Fee/PreQual/Technical/Finance | -32.99% | ₹8.3 L+₹60,487.56 (7.91%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.3 L
EMD Value
₹24,680
Closing Date
15 Jun 2026, 6:00 pmClosed
EXECUTIVE ENGINEER RIGHT RIVER WORKS DIVISION SMC
EXECUTIVE ENGINEER RIGHT RIVER WORKS DIVISION REGAL LANE LAL CHOWK SMC
Construction of cement concrete lane from H/O Imtiyaz Ahmad Ganie to H/O Gh Mohammad Makroo to Bashir Ahmad Makroo Kawdara
2026_HAUDD_311637_7
SHORTTerm NOTICE INVITING ETENDER No. 02 of 2026-2027 Dated 05.06.2026 RRWD SMC
Open Tender
Civil Works
Percentage
54 days
Bashir Ahmad Makroo Kawdara
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹600
FA/CAO AC NO 0216010200000007
₹24,680
27 Jun 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 25 mm and upto 40 mm. | 451.19 | Sqm | 89.95 | ₹40,584.54 |
| 2 | Removal of damaged PVC Pipes with unhygenic material including disposal of unserviceable material complete job | 85 | Rmt | 55 | ₹4,675 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 9.91 | Cum | 1,725.2 | ₹17,096.73 |
| 4 | Providing and laying of stone soling duly hand packed with horizontal level incluindg carriage | 1.77 | Cum | 850 | ₹1,504.5 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 24.44 | Cum | 5,202.9 | ₹1,27,158.88 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.34 | Cum | 6,591.25 | ₹61,562.28 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 45.36 | Cum | 7,104.33 | ₹3,22,252.41 |
| 8 | Providing laying and fixing of PVC pipes of prince make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp: 250 mm | 280 | Rft | 380 | ₹1,06,400 |
| 9 | Providing laying and fixing of PVC pipes of prince make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp: 100mm | 50 | Rft | 150 | ₹7,500 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 3,470.04 | Kgs | 123.2 | ₹4,27,508.93 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1009042.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .