Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹87,032.08Accepted-AOC BINA ROAD PARASI P O KAKRI DISTT SONBHADRA UP | SONBHADRA | UP | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE BIDDER |
Tender Value
₹88,118
EMD Value
₹1,200
Closing Date
12 Aug 2022, 11:00 amClosed
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Demounting, repairing, rewinding and fitment of 01 No. AC Slip Ring Motor Sl. No. 2657357003 capacity 24.50 KW, 415 / 280V, 975 RPM of EOT Crane (35T/5T) at New Workshop of Khadia Project
2022_NCL_251552_1
KHD/G.M. (Excv)/E-Tender/22-23/421
Open Tender
Excavation Department Work
Item Rate
16 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,200
24 Nov 2022
27 Jul 2022
13 Aug 2022
27 Jul 2022
12 Aug 2022
28 Jul 2022
27 Jul 2022 - 1 Aug 2022
Amount
Labour Charge for demounting, repairing, rewinding and fitment of 01 No. AC Slip Ring Motor Sl. No. 2657357003 capacity 24.50 KW, 415 / 280V, 975 RPM of EOT Crane (35T/5T). Note; It includes 1 No. Skilled and 2 No. unskilled manpower for 10 days.
Material involved for repairing and rewinding of 01 No. AC Slip Ring Motor Sl. No. 2657357003 capacity 24.50 KW, 415 / 280V, 975 RPM of EOT Crane (35T/5T).
Cost of Super Enamel copper wire for stator winding (including less cost of scrap)
Cost of Super Enamel copper wire for armature winding (including less cost of scrap)
Cost of DGC wire 16 mm
Cost of Nomex paper 3 mil and 5 mil
Cost of Glass fibre wedge
Cost of Insulating thinner 205
Cost of Insulating varnish
Cost of Araldite 180 Gram Pack
Cost of Glass tape size: 3.4" x 50 mm
Cost of Copper Lug
Cost of Caron Brush
Cost of Brush Holder
Cost of Glass fibre sleeve size: 10mm x 1 Mtr.
Cost of soldering flux, solderring wire
Cost of Bearing NU 314 ECP
Cost of Bearing 6314-ZZ
Charges for fabrication of terminal block 06 point with brass stud and washer
Heating Charges
Labour Charges for Turning of slip ring and polishing by lathe machine. Note; It includes 1 No. Skilled and 1 No. unskilled manpower for 3 days.
Labour Charges for repairing of bearing end cover Note; It includes 1 No. Skilled and 1 No. unskilled manpower for 3 days.
Contractor Profit on Labour Charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_259945.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .