| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.1 CrAccepted-AOC 494A RAILWAY COLONY 829104 KARGALI BERMO BOKARO JHARKHAND 829104 INDIA | BOKARO | JHARKHAND | 829104 | ₹1.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.1 Cr+₹3.9 L (3.67%)Rejected-Finance | ₹1.1 Cr+₹3.9 L (3.67%) | L-2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical PRAYAGRAJ | UTTAR PRADESH | 211001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical LOCATION UTTAR PRADESH UP | SHAHJAHANPUR | UTTAR PRADESH | 242001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S LALMANI MAURYA L2 | ANIL KUMAR SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling stone work in cement mortor including stacking of dismantaled materials as directed by Engineer-in-Charge . | 20 | Cum. | 100 ₹2,000 Lowest | 260 ₹5,200 |
| 2.00 | Dismantling R.C.C. 1:2:4 work including stacking of materials as directed by Engineer-in-Charge. | 54.02 | Cum. | 300 ₹16,206 Lowest | 470 ₹25,389.4 |
| 3.00 | Earth work in excavation of foundation in sand stone or other soft rock by pick axex including all lead and lift, with proper completion and disposal including dewatering if required. | 2,012.85 | Cum. | 160 ₹3,22,056 | 110 ₹2,21,413.5 Lowest |
| 4.00 | Centering & shuttering for C.C. work in different parts of structure including cost of material, labour, T&P, fixing and removal etc. | 183.38 | Sqm. | 150 ₹27,507 Lowest | 230 ₹42,177.4 |
| 5.00 | Laying C.C. 1:2:4 (M-15) with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size including cost of all material, all lead and lift, labour, T&P etc. required for proper completion of work. | 242.18 | Cum. | 5,200 ₹12,59,336 Lowest | 5,900 ₹14,28,862 |
| 6.00 | Centering & shuttering for R.C.C. work in different parts of structure including cost of all materials, labour, all lead & lift, T&P etc. required for proper completion of work. | 576.04 | Sqm. | 500 ₹2,88,020 | 410 ₹2,36,176.4 Lowest |
| 7.00 | Providing & laying TMT (Fe 550) steel bar including Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire and cost of all materials, labour, all lead & lift, T&P etc. required for proper completion of work. | 35.68 | M.T. | 62,000 ₹22,12,160 | 61,000 ₹21,76,480 Lowest |
| 8.00 | Laying R.C.C. 1:1.5:3 (M–20) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, all lead & lift, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering in construction of different parts of structure. | 345.68 | Cum. | 7,000 ₹24,19,760 | 6,600 ₹22,81,488 Lowest |
| 9.00 | Providing & laying 150mm wide& 6.00 mm thick PVC water stop seal at joints including cost of all material, labour, T&P etc. required for proper completion of work. /RM | 144.4 | R.M. | 400 ₹57,760 Lowest | 520 ₹75,088 |
| 10.00 | Laying R.C.C. 1:1:2 M–25 (as per mix design) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, all lead & lift, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering in construction of different parts of structure. | 86.91 | Cum. | 7,000 ₹6,08,370 | 6,600 ₹5,73,606 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
28 Aug 2025, 1:00 pmClosed
Superintending Engineer, B S C C C-1 Mzp
Superintending Engineer, Bansagar Canal Construction Circle-1, Mirzapur
Construction of V.R.B. and protection work at Km. 11.820, 13.008 and 22.930 of M.J.L.C
2025_UPIDC_1066939_1
02/SE/2025-26
Open Tender
Civil Works
Item Rate
180 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹2.7 L
30 Sept 2025
20 Aug 2025
28 Aug 2025
20 Aug 2025
28 Aug 2025
20 Aug 2025
Amount
Dismantling stone work in cement mortor including stacking of dismantaled materials as directed by Engineer-in-Charge .
Dismantling R.C.C. 1:2:4 work including stacking of materials as directed by Engineer-in-Charge.
Earth work in excavation of foundation in sand stone or other soft rock by pick axex including all lead and lift, with proper completion and disposal including dewatering if required.
Centering & shuttering for C.C. work in different parts of structure including cost of material, labour, T&P, fixing and removal etc.
Laying C.C. 1:2:4 (M-15) with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size including cost of all material, all lead and lift, labour, T&P etc. required for proper completion of work.
Centering & shuttering for R.C.C. work in different parts of structure including cost of all materials, labour, all lead & lift, T&P etc. required for proper completion of work.
Providing & laying TMT (Fe 550) steel bar including Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire and cost of all materials, labour, all lead & lift, T&P etc. required for proper completion of work.
Laying R.C.C. 1:1.5:3 (M–20) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, all lead & lift, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering in construction of different parts of structure.
Providing & laying 150mm wide& 6.00 mm thick PVC water stop seal at joints including cost of all material, labour, T&P etc. required for proper completion of work. /RM
Laying R.C.C. 1:1:2 M–25 (as per mix design) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, all lead & lift, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering in construction of different parts of structure.
Laying & Fixing joint filler board (18m.m. thick) including cost of all materials, labour, all lead & lift, T& P etc. required for proper completion of work.
P/F Hard stone wheel guard of size 200 x 200 x 900 mm with cost of all material, labour, all lead & lift T&P etc.
Laying 3 m.m. thick Polyplus Multyplast tar paper over bed block including cost of all materials, labours, T&P etc, required for proper completion of work.
Providing expansion joint in concrete including placing and fixing of angle iron (55x55x10) & M.S. plate (125x10) with 10mm dia anchor bars and filling with bitumen including cost of all materials, all lead and lift, labours, T&P etc. required for proper completion of work.
C.R. Stone masonary wall with 1:3 cement, coarse sand mortor including cost of all material, labour and T&P etc. including all lead and lift for proper completion of work.
Providing and fixing PVC Pipe in drainage spout & weep holes including cost of all materials, labours, all lead & lift, T&P etc, required for proper completion of work.
Supplying and laying coarse sand in filter including cost of all materials, labour, T&P, all lead & lift etc. required for proper completion of work.
Supplying and Laying graded hard stone grit 4.75 mm to 20 mm size in filter including cost of all materials, labour, T& P, all lead & lift etc. required for proper completion of work.
Supplying and Laying graded hard stone ballast 20 to 40 mm size in filter and in gaps of C.C. blocks including cost of all materials, labour, T&P, all lead & lift etc. required for proper completion of work.
Earth work in filling with proper dressing and compaction including all lead & lift etc. required for proper completion of the work.
Cement pointing 1:2 C.M.(struck deep) on stone masonary including cost of all materials, labour, all lead & lift, T&P etc required for proper completion of work.
Cement plaster 1:3 C.M. (20 mm thick) on stone masonary including cost of all materials,T&P etc required for proper completion of work.
Making construction groove in concrete surface including painting with sealing primer on joint and filling groove with sealing compound including cost of all materials, fuel for heating labour, T & P etc. required for proper completion of work.
M/S LALMANI MAURYA (BID ID -5503482)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .