| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.1 LAccepted-AOC | ₹42.1 L Quoted ₹43.7 L | L1 | Accepted-AOC Being lowest |
| 2 | L2₹46.5 L+₹2.8 L (6.48%)Rejected-Finance | ₹46.5 L+₹2.8 L (6.48%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹47.9 L+₹4.2 L (9.61%)Rejected-Finance SREE COLONY BAGDOGRA PO BAGDOGRA DIST DARJEELING WB | ₹47.9 L+₹4.2 L (9.61%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹48.3 L+₹4.6 L (10.6%)Rejected-Finance KAMARVITA AMBARI FALAKATA JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | ₹48.3 L+₹4.6 L (10.6%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹48.8 L+₹5.1 L (11.6%)Rejected-Finance | ₹48.8 L+₹5.1 L (11.6%) | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | SURESH JHA L6 | M/S S.B. CONSTRUCTION L3 | Engineers India L8 | SRI SURAJIT SENGUPTA L5 | LIBERAL ENGINEER CONSTRUCTION L2 | RAJU AICH L9 | ANJALI CONSTRUCTION L7 | R.S.V Associates L1 | ROY CONSTRUCTION AND CONSULTANCY L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling plain or corrugated steel sheeting any thickness, complete all as specified and directed. | 565 | SQM | 22 ₹12,430 | 20 ₹11,300 | 30 ₹16,950 | 18 ₹10,170 | 18 ₹10,170 | 25 ₹14,125 | 25 ₹14,125 | 25 ₹14,125 | 17 ₹9,605 Lowest |
| 2.00 | Dismantling floor hearth or wall tiling and stone slabs including cement mortar bedding ( but not backing ) removing serviceable tiles to store and rubbish off the premises etc complete all as specified and directed | 520 | SQM | 33 ₹17,160 | 32 ₹16,640 | 40 ₹20,800 | 28 ₹14,560 | 30 ₹15,600 | 38 ₹19,760 | 35 ₹18,200 | 80 ₹41,600 | 27 ₹14,040 Lowest |
| 3.00 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing complete all as specified and directed | 94 | TEN SQM | 23 ₹2,162 | 22 ₹2,068 | 30 ₹2,820 | 18 ₹1,692 | 20 ₹1,880 | 25 ₹2,350 | 25 ₹2,350 | 35 ₹3,290 | 17 ₹1,598 Lowest |
| 4.00 | Demolition of cement concrete (un reinforced) in ground floors and paving n. exc. 15 cm thickness (below or above ground level) removing rubbish off the premises etc complete all as specified and directed | 35.17 | CUM | 867 ₹30,492.39 | 840 ₹29,542.8 | 930 ₹32,708.1 | 780 ₹27,432.6 | 800 ₹28,136 | 825 ₹29,015.25 | 900 ₹31,653 | 800 ₹28,136 | 750 ₹26,377.5 Lowest |
| 5.00 | Demolition of concrete (reinforced) of any description and in any position not otherwise specifically provided for, removing rubbish off the premises etc complete all as specified and directed. | 4.5 | CUM | 867 ₹3,901.5 | 840 ₹3,780 | 930 ₹4,185 | 780 ₹3,510 | 800 ₹3,600 | 825 ₹3,712.5 | 900 ₹4,050 | 1,350 ₹6,075 | 750 ₹3,375 Lowest |
| 6.00 | Taking down chowkhats or frame with shutters (without taking off shutters from the frame) not exceeding 1.50 Sqm each, complete all as specified and directed. | 26 | EACH | 108 ₹2,808 | 105 ₹2,730 | 115 ₹2,990 | 124 ₹3,224 | 100 ₹2,600 Lowest | 127 ₹3,302 | 111 ₹2,886 | 225 ₹5,850 | 120 ₹3,120 |
| 7.00 | Taking down chowkhats or frame with shutters (without taking off shutters from frames) exceeding 1.5 sqmtr but not exceeding 4 sq m each, complete all as specified and directed. | 7 | EACH | 129 ₹903 | 125 ₹875 | 137 ₹959 | 134 ₹938 | 120 ₹840 Lowest | 137 ₹959 | 133 ₹931 | 250 ₹1,750 | 130 ₹910 |
| 8.00 | Taking down shutters from frames exceeding 1 sqmtr but not exceeding 2 sq m each complete all as specified and directed. | 4 | EACH LEAF | 593 ₹2,372 | 575 ₹2,300 | 630 ₹2,520 | 620 ₹2,480 | 550 ₹2,200 | 635 ₹2,540 | 610 ₹2,440 | 90 ₹360 Lowest | 600 ₹2,400 |
| 9.00 | Demolition and breaking up drain pipes (Salt glazed ware, AC or Reinforced concrete) set in cement mortar complete all as specified and as directed. | 50 | RM | 108 ₹5,400 | 105 ₹5,250 | 115 ₹5,750 | 95 ₹4,750 | 100 ₹5,000 | 97 ₹4,850 | 111 ₹5,550 | 10 ₹500 Lowest | 120 ₹6,000 |
| 10.00 | Demolition of brickwork built in cement mortar and removing rubbish off the premises etc complete all as specified and directed | 59.78 | CUM | 920 ₹54,997.6 | 835 ₹49,916.3 | 975 ₹58,285.5 | 840 ₹50,215.2 | 850 ₹50,813 | 950 ₹56,791 | 865 ₹51,709.7 | 500 ₹29,890 Lowest | 900 ₹53,802 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
5 Jun 2026, 6:00 pmClosed
GE SEVOKE ROAD
GE Sevoke Road Post Salugara Dist Jalpaiguri PIN 734008
SPECIAL REPAIR TO BLDG NOS TA 399 P 373 AND OPW 32 AT SEVOKE ROAD MIL STN UNDER GE SEVOKE ROAD
2026_MES_765650_1
8616/SEV OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE SEVOKE ROAD
As per tender documents
8 documents required · 8 mandatory
₹500
GE SEVOKE ROAD
₹90,000
3 Aug 2026
15 May 2026
8 Jun 2026
15 May 2026
5 Jun 2026
30 May 2026
16 May 2026 - 25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling plain or corrugated steel sheeting any thickness, complete all as specified and directed. | 565 | SQM | - | - |
| 2 | Dismantling floor hearth or wall tiling and stone slabs including cement mortar bedding ( but not backing ) removing serviceable tiles to store and rubbish off the premises etc complete all as specified and directed | 520 | SQM | - | - |
| 3 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing complete all as specified and directed | 94 | TEN SQM | - | - |
| 4 | Demolition of cement concrete (un reinforced) in ground floors and paving n. exc. 15 cm thickness (below or above ground level) removing rubbish off the premises etc complete all as specified and directed | 35.17 | CUM | - | - |
| 5 | Demolition of concrete (reinforced) of any description and in any position not otherwise specifically provided for, removing rubbish off the premises etc complete all as specified and directed. | 4.5 | CUM | - | - |
| 6 | Taking down chowkhats or frame with shutters (without taking off shutters from the frame) not exceeding 1.50 Sqm each, complete all as specified and directed. | 26 | EACH | - | - |
| 7 | Taking down chowkhats or frame with shutters (without taking off shutters from frames) exceeding 1.5 sqmtr but not exceeding 4 sq m each, complete all as specified and directed. | 7 | EACH | - | - |
| 8 | Taking down shutters from frames exceeding 1 sqmtr but not exceeding 2 sq m each complete all as specified and directed. | 4 | EACH LEAF | - | - |
| 9 | Demolition and breaking up drain pipes (Salt glazed ware, AC or Reinforced concrete) set in cement mortar complete all as specified and as directed. | 50 | RM | - | - |
| 10 | Demolition of brickwork built in cement mortar and removing rubbish off the premises etc complete all as specified and directed | 59.78 | CUM | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_857527.xls
BOQ • 0.42 MB
TENDERDOCUMENTS8616.pdf
Tender Documents • 1.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .