| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹6.0 LAdmitted-Finance | ₹6.0 L | L2 | Admitted-Finance |
| 3 | L3₹8.1 LAdmitted-Finance | ₹8.1 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Goodwill Enterprises L2 | ARIHANT ENGINEERS AND TRADERS L3 | HYDROCON ENGINEERS L1 |
|---|---|---|---|---|---|---|
| 1.01 | Hiring & Running of 15 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts Note:-Payment will be made as per site actual no. of shifts complete | 270 | Shifts | 2,99,700 ₹2,99,700 | 4,03,380 ₹4,03,380 | 2,91,600 ₹2,91,600 |
| 1.02 | Hiring of 30 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | Shifts | - | - | - |
| 1.03 | Hiring & Running of 25 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts
Note:-Payment will be made as per site actual no. of shifts complete | 270 | Shifts | 2,99,700 ₹2,99,700 | 4,03,380 ₹4,03,380 | 2,91,600 ₹2,91,600 |
| 1.04 | Hiring of 50 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | Shifts | - | - | - |
Tender Value
₹10.9 L
EMD Value
₹24,500
Closing Date
2 Mar 2026, 3:00 pmClosed
Executive Engineer (EnM)M-9
C2 A Block Opp. Geeta Mandir Janakpuri
Installation of different ratings Sewage Pumping Set/Trolley with all allied accessories on hiring basis at any location under Uttam Nagar Constituency, AC-32.
2026_DJB_287584_2
e-NIT No.27 / (EnM)M-9/ 2025-26
Open Tender
Civil Works
90 days
C2 A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB Account No. 50448339804
₹24,500
7 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Hiring & Running of 15 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge. Period :- 90 Days x 3 Shifts = 270 Shifts Note:-Payment will be made as per site actual no. of shifts complete
Hiring of 30 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement. Period: 90 Days x 3 Shift = 270 Shifts Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site.
Hiring & Running of 25 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge. Period :- 90 Days x 3 Shifts = 270 Shifts Note:-Payment will be made as per site actual no. of shifts complete
Hiring of 50 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement. Period: 90 Days x 3 Shift = 270 Shifts Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_381122.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid