Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 CrAccepted-AOC | ₹18.0 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹19.5 CrRejected-Finance | ₹19.5 Cr | L2 | Rejected-Finance Not Admitted |
Tender Value
₹23.1 Cr
EMD Value
₹44.6 L
Closing Date
6 May 2021, 12:00 pmClosed
S.E., Jaunpur-Ghazipur Circle, P.W.D., Jaunpur
S.E., Jaunpur-Ghazipur Circle, P.W.D., Jaunpur
Widening and Strengthening work of Sujanganj Madhiyahun Kerakat Sultanpur Road (SH-151) ch 16.400 to 47.680
2021_CEUVZ_576791_1
1242/SETender/jnp-gzp circle/2020 date 12-03-2021
Open Tender
Civil Works
360 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹44.6 L
Yes
Jaunpur
24 Aug 2021
26 Mar 2021
6 May 2021
26 Mar 2021
6 May 2021
26 Mar 2021
26 Mar 2021
Amount
Excavation for road work in soil with hydraulic excavator of 1.00 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.. (Including all T&P, labour cess etc. but excluding G.S.T.)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with motor grader at OMC, and compacting with Soil campactor roller to achieve the desired density, complete as per MORT&H Technical Specification Clause 401. For Widening (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with Soil campactor roller to achieve the desired density. As per Technical Spec. Clause 406 For Widening (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and applying tack coat-1 with VG-10 using pressure distributor at the rate of 3.50 kg. per 10sqm area on the prepared bituminous / granular surface cleaned with mechenical broom . complete as per Clause 503 of MORTH Specification (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying Dence Graded Bituminous macadam Gr-2 with 100-120 TPH batch type HMP producing an avarage output of 75 tonnes per hour using crushed aggergates of specified grading, premixed with bituminous binder (VG-40) @ 4.50% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment rolling with smooth to achieve the desired compaction as per MORTH Specification Clause 507 complete in all respects including cost of all material, labour T&P etc as per directed by Engineer-in-charge. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and applying tack coat-2 with VG-10 using pressure distributor at the rate of 3.00 kg. per 10sqm area on the prepared bituminous / granular surface cleaned with mechenical broom . complete as per Clause 503 of MORTH Specification (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying bituminous concrete Gr-2 with 100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with VG-40 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of sub grade and earthen shoulder with approved material obtained from Roadway Cutting with all lift, lead & transporting to site spreading to required slope and compacting to meet requirement of table 300.2(Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of sub grade and earthen shoulder with approved material obtained from barrow pits with all lift, lead (1000m) & transporting to site spreading to required slope and compacting to meet requirement of table 300.2 Cartage earth from barrow pits 1 Km length. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material for Boggi action For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
RCC Grade M20 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Earth work in excavation for structures as per drawing and techincal specification clauses 304.3.13 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m. dressing of sid For RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Plain cement concrete 1 : 3 : 6 nomional mix in foundation with crushed stone aggregate 40 mm nomional size mechnically mix place in foundation and compacted by vibration including curring for 14 days. RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Brick masonry work in 1 : 3 (cement and coarse sand mortar in substructure complete excluding pointing and plastering as per drawing and Technical Specifications. As per MoRTH RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
PCC Grade M-15 Plain cement concrete in open foundation complete as per drawing and technical specifications For RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
M-20 Grade Concrete Furnishing and placing reinforced cement concrete in superstructure as per drawing and technical specifications For RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications For RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Pointing with cement mortar (1 : 3) on brick work in substructure as per technical specifications For RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Plastering with cement mortar (1 : 3) on brick work in substructure as per technical specifications. As per SI No 583 For RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying filter media with granular material as per drawing and technical specification For RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Back filling - Earth work in back filling of abutment with cartage earth upto 1.0km . As per direction of E/I For RCC Culvert (Including all material, T&P, labour cess etc. but excluding G.S.T.)
M/S UMA ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid