Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical GOVT ELECTRICAL CONTRACTOR C VILLAGE HAT PO BAJAURA TEHSIL BHUNTAR DISTRICT KULLU HP 175125 | KULLU | HIMACHAL PRADESH | 175125 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHANKAR LAL L2 | JAGDISH CHAND L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed in Pick-Jumper work. | 23.81 | cum | 385 ₹9,166.85 | 371 ₹8,833.51 |
| 2.00 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) excluding cost of centring & shuttering in.Foundation and Plinth. | 0.88 | Cum | 6,160 ₹5,420.80 | 6,141 ₹5,404.08 |
| 3.00Providing and laying cement concrete 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. | |||||
| 3.01 | Foundation footings bases of columns and the like and mass concrete. | 1.84 | cum | 7,320 ₹13,468.80 | 7,301 ₹13,433.84 |
| 3.02 | ii) Walls (any thickness but not less than 0.1m) including attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level) | 8.01 | cum | 7,500 ₹60,075 | 7,481 ₹59,922.81 |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete & plain conrete work in. | |||||
| 4.01 | i) Flat surfaces such as soffits of suspended floors, roofs, landings & the like. (Floors upto 200mm th.) | 4.34 | sqm | 710 ₹3,081.40 | 681 ₹2,955.54 |
| 4.02 | ii) Vertical surfaces such as walls (any thickness) partition and the like including attached pillasters, buttresses, plinth and string courses and the like. | 82.46 | sqm | 410 ₹33,808.60 | 381 ₹31,417.26 |
| 5.00Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. | |||||
| 5.01 | Suspended floors, roofs, landing and shelves and their support, balconies, beams, girders, bressumers and cantilever upto floor two level. | 0.56 | cum | 7,210 ₹4,037.60 | 7,151 ₹4,004.56 |
Tender Value
₹2.7 L
EMD Value
₹5,500
Closing Date
10 Jul 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Dharampur Distt. Solan H.P.
Construction of storage tank of 20,000 Liter Capacity at Village Taksal in Tehsil Kasauli District Solan HP Under Zila Parishad
2025_HPIPH_108996_1
JSV-EE-DMP-CB-TA-NIT/2025- 2980-3079 dated 30.06.2025
Open Tender
Civil Works
60 days
In Taksaal
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹5,500
10 Mar 2026
30 Jun 2025
10 Jul 2025
30 Jun 2025
10 Jul 2025
30 Jun 2025
30 Jun 2025 - 10 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid