| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.6 LAccepted-AOC NO 2 16 KANGAYAMPALAYAM SULFUR PO COIMBATORE 641 401 | COIMBATORE | COIMBATORE | TAMIL NADU | 641401 | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹49.6 L+₹6,600 (0.13%)Rejected-Finance | L2 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 3 | L3₹49.7 L+₹9,750 (0.20%)Rejected-Finance | L3 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 4 | L4₹49.8 L+₹24,100 (0.49%)Rejected-Finance NO 9 DR SEVALIYE SHIVAJI GANESAN NAGAR 3RD STREET DINDIGUL 624 001 | DINDIGUL | DINDIGUL | TAMIL NADU | 624001 | L4 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 5 | L5₹50.1 L+₹49,480 (1.00%)Rejected-Finance 7 345 C 1 AERO NAGAR KANGEYAMPALAYAM KADAMPADI SULUR COIMBATORE TAMIL NADU 641401 | COIMBATORE | TAMIL NADU | 641401 | L5 | Rejected-Finance BEING NOT LOWEST TENDER |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
19 Aug 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF SULUR
Garrison Engineer AF Sulur Military Engineer Services Kangayampalayam Post Sulur Coimbatore 641 401
REPAIR TO CERTAIN CONNECTED WAYS FLEXIBLE RIGID AREA HARDSTANDING AND OTHER MISC ITEMS IN TECHNICAL AREA AT AF STN SULUR
2020_MES_365394_1
8337/E8
Open Tender
Miscellaneous Works
Item Rate
180 days
GE AF SULUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
GE AF SULUR
₹98,000
Yes
29 Aug 2020
30 Jul 2020
20 Aug 2020
30 Jul 2020
19 Aug 2020
13 Aug 2020
30 Jul 2020 - 12 Aug 2020
60 days
Amount
SCHEDULE A BOQ
Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc., including removing debris material to out side MD land complete all as specified and directed.
Brickwork with flyash bricks, straight or curved on plan to any radius, built in cement mortar (1:6) all as specified and directed.
Walling of random rubble, granite and trap (harder stones), uncoursed, well bonded, bedded and solidly hearted, built in cement mortar 1:6 complete all as specified and as directed.
Extra over stone walling for hammer dressing to face stone and dressing of face with maximum depressing on face from straight edge held against the dressed surface n ex 20 mm all as specified of random rubble ,uncoursed or brought upto courses.
Extra over stone walling for hammer dressing to face stone and dressing of face with maximum depressing on face from straight edge held against the dressed surface n ex 40 mm all as specified of random rubble ,uncoursed or brought upto courses.
Raised pointing to random or polygonal rubble, uncoursed or brought upto courses in CM 1:4
Plain cement concrete (1:2:4) type B1 (20mm graded stone aggregate) as in coping including necessary form work all as specified and directed.
Rendering 15 mm thick in two layers on brick or stone or concrete surfaces,first coat 10mm thick in cement mortar 1:6 and 2nd coat 5mm thick in cement mortar 1:4 mixed with water proofing compound as per manufacturer instructions finished even and smooth without using extra cement complete all as specified and directed. Note: (a) Water proofing compound shall be measured and paid seperately. (b) The unit rate quoted is deemed to included for Removing of accumulated earth of any width and depth upto 15 cm cleaning/cutting the grass with hand operated petrol/kerosene driven grass cutting machine and removing the grass waste around 3 m from plinth protection to outside MD land Note: Periodicity of cutting of grass shall be before commencement of work and after completion of repairs.
Demolition of cement concrete (reinforced) in drains or any position not otherwise specifically provided for complete all as specified and directed.
Cement concrete 1:2:4 type B-2 (using 40mm graded stone aggregate) as in surface channels and drains including necessary form work. Note : Necessary form work and reinforcement shall be measured and paid separately vide relevant items of this schedule
Reinforced Cement Concrete 1:1½:3 using 20mm graded stone aggregate as in foundation for drain and the like all as specified and as directed.
Reinforced Cement Concrete 1:1½:3 using 20mm graded stone aggregate as in walls, slab for drain and the like any thickness all as specified and as directed. Note for items 12 & 13 : Necessary form work and reinforcement shall be measured and paid separately vide relevant items of this schedule.
Form work to sides of concrete foundaions, footings, bases of columns, rafta and raft beams, sides and soffits of foundation and plinth beams and work vertical or to better finished rough all as directed.
Form work to faces of walls, slab, abutments, parapets and similar work including attached pillasters, buttresses etc vertical or to better finished fair all as directed.
TMT bars 10mm dia and over cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed0 not less than 0.9mm dia all as directed.
Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in any type of soil, complete all as specified and directed. Note: 5% of the quoted rate shall be considered for adjustment in rate for every 3 cm or part thereof above or below of 15 cm average depth of surface excavation.
Scarifying or picking gravelled macadam or bituminous macadam surfaces in area not exc 400 sqm, exc 50 mm and n.exc 100 mm deep including removing to outside MD land complete all as specified and directed
Rolling and consolidating formation surfaces in cutting to the required gradient and camber including filling in depression and hollow, watering, leveling etc., complete using power roller exceeding 8 tonne and not exceeding 12 tonne capacity all as specified and as directed. Note: Rolling and consolidation the formation surfaces to the required gradient and camber under optimum moisture conditions to achieve at least 98% of maximum dry density determined using modified proctor density determination method as per relevant IS code.
Water bound macadam (WBM) of granite, trap or basalt 75mm thick (compacted thickness) with coarse granite aggregate of grading 2 (63 to 40 mm size) rolled and consolidated using 8 to 12 tonne capacity power roller to gradient and chamber required, spread all as directed by the Engineer-in-Charge.
Preparing unsurfaced WBM surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc., as directed.
Applying evenly a priming/tack coat with rapid setting bitumen cationic emulsion conforming to IS-8887 @ 6.0Kg/10 Sqm over unsurfaced WMM all as specified and as directed.
Bituminous Macadam (BM) of grade VG-30 with 4.0 % (minimum) binder content by weight of total mix, using hot mix plant and laid by using mechanical paver, rolled and compacted to required camber and gradient using power roller of 8 to 10 tonne capacity power roller complete for roads all as specified.
Note:- (i) The actual binder content for BM used shall be as per optimised content based on approved job mix formula irrespective of what ever indicated in BOQ. (ii) Price adjustment shall be done on MINUS side only based on paid vocher (without considering the permissible tolerance on minus side) with reference to binder content indicated in BOQ. (iii) No prices adjustment for Bitumen shall be done for variation on plus side.
Precast kerb stone as in PCC 1:3:6 type C1 using 20 mm graded stone aggregate and set in CM 1:4 including removing the old damaged kerb stone from the site and deposit out side MD land where directed etc including making good the disturbed portion of road or path complete all as specified and as directed. Note :- The unit rate is deemed to be included for (a) Demolition of concrete and removing rubish material to out side MD land. (b) Necessary form work.
Speed bump (SB-01) made out of plastic material so that it can bear maximum load on it. Two highly reflective reflectors moulded in PMMA material welded with ABS base plate through ultrasonic welding process and then fixed on speed bump so that dust and water canot tocu reflectors inside area. Metalic bolts are used for installation on road. size of size L=250mm, W=750mm, H=75mm) including taking down and removing rubbish material to outside MD land complete all as specified and directed.
Preparation of new decorated plastered or unplastered surface of wall, brooming down or steel wire brushing down smoke soot, moulds mass, efflorescent , trading, oil, greasy spots and applying two coats of cement base paint over one coat of primer complete all as specified and as directed.
Polycarbonate solar cat eye, 1.75 to 2.5 Hz frequency upto 800m visibility, 3 x 2 bright LEDs, 125 mm x 125mm x 75mm size, with 50mm high shank, fixed on existing road with approved adhesive all as per manufacturer's instructions and as directed.
Renewing cement concrete tiles in patches, area n exc 5 sq.m. Including removing and cleaning old tiles, preparing beds and laying or setting, jointing and pointing new or old tiles complete all as directed. Note : The rate included for cutting out broken tiles, removing and cleaning loose tiles, preparing bed removing rubbish, roming and replaing old with new tiles to match, complete with all cuttings etc, that may be required. New tiles required is deemed to be included all as directed. The unit rate is also including necessary beding in cement mortor.
75 mm thick , Moorum/ red bajri filling in road side berms, laid in layers n exc. 15 cm thick, spread, levelled and rammed/ rolled including watering to required level and gradient complete all as specified and as directed. Note: (i) Moorum/red bajri required shall be brought from outside MD land (ii) Compaction of moorum filling shall be carried out under optimum moisture conditions up to the standard proctor density not less than 98 percent. (iii) Measurements shall be taken after consolidation earth and 5% deduction shall be made for payments.
Bituminous Premixed Semi dense asphaltic Concrete, 30 mm consolidated thickness, using paving bitumen of Grade VG – 30, with 5.5% binder content by weight of total mix using paving bitumen, rolled and compacted ro required camber and gradient using Hot Mix Plant and Mechanical Paver, rolled and compacted with power road roller of 8 to 12 ton capacity to required camber and gradient complete all as specified and directed.
Note:- (i) The actual binder content for BM used shall be as per optimised content based on approved job mix formula irrespective of what ever indicated in BOQ. (ii) Price adjustment shall be done on MINUS side only based on paid vocher (without considering the permissible tolerance on minus side) with reference to binder content indicated in BOQ. (iii) No prices adjustment for Bitumen shall be done for variation on plus side.
Preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surfaces with gunny bags or using air compressor to remove all loose dirt etc to remove all dirt etc. and applying evenly a priming / tack coat with bituminous primer VG-10 at the rate of 2.5 KG per 10 Sq.m complete all as specified and directed.
Plain cement concrete (1:4:8) type D2 (40mm graded stone aggregate) as in foundation, filling and mass concrete including demolition of existing concrete and disposal to outside MD land all as specified and directed.
TMT bars 6 to 8mm dia and over cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed0 not less than 0.9mm dia all as directed.
Walling of squared rubble ,regular coursed well bonded ,bedded and solidly hearted builtb in CM 1:6 including demolition of existing concrete all as specified.
Walling of squared rubble, regular coursed well bonded ,bedded and solidly hearted builtb in CM 1:6 except stone all as specified. Note :- Stone obtain from demolition material shall be reused.
Preparation of old concrete/precast cement concrete surfaces of any description including removing caked mud, making good disturbed tiles with cement paste etc and applying one coat of apex paint.
Providing 75mm thick plain cement concrete 1:4:8 type D2 (using 40 mm graded crushed stone aggregate) as in sub base to tiles complete including demolition of existing concrete all as specified and directed .
Chequered cement concrete tiles 30cmx30cmx25mm thick machine pressed set jointed and pointed in neat cement slurry as in floors and cut and polished using gray cement and pigments over screed bed or bedding layer of mortar 15mm thick for laying floor finishes in cement mortar (1:4). Note : (a) The Unit rate quoted is included for Demolition of Stone Slabs and tiles of any description or thickness in floors, aprons etc laid bedded and pointed in any mortar (b) The manufacturer's test certificate and individual test certificate of Tiles must be submitted for approval by the concerned authority prior to installation.
Preparation of old decorated plastered or unplastered surface of wall/ concrete surfaces, brooming down or steel wire brushing down smoke soot, moulds mass, efflorescent , trading, oil, greasy spots and applying one coat of cement base paint complete all as specified and as directed.
Levelling of road side berm by filling, spreading with existing sand/Moorum at lower area and cutting at raise area the with mechanical machine and rolling of surface with road roller of capacity 8-10 tonne, including removal of extra cutting material ,boulders and other materials from area and all as specified and directed. Note :- The unit rates quoted by the tenderer shall be deemed to inclusive for (i) The work in cutting and filling shall be carried out as instructed by the Engineer-in-Charge. (ii) Black cotton soil/ vegetable soils and soils obtained from top 30 cm cutting shall not be used for filling and shall be disposed off as directed by Engineer-in-Charge. (iii) Boulders or soft materials are encountered in cut slopes these shall be excavated to the approved depth as directed and the resulting cavities with suitable material and thoroughly compacted as directed. (iv) Cutting and filling shall be cleared of shurbs, vegetation, grass, bush, weed, trees and saplings not exceeding 30 cm in girth, measured at a height of one metre above ground level.
Cat eye made of ABS body with scratch and abrasion resistant micro prismatic polycarbonate and ultrasonically welded lens. Temperature resistant body and lens (90X110X17mm) colour white/ red/ yellow fixing to road by using bitumen or epoxy etc complete including taking down existing one all as specified and as directed. (Make : .(Make: 3M /Simsonite / Tata BP)
Repair to pot holes any depth, not exc 1 sq m each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting round edges to at least 25 mm in depth, making good by filling in screened & graded road metal, watering and well ramming (including supply of road metal)
100mm thick, plain cement concrete (1:2:4), type B-1 (using 20 mm graded mechanically crushed stone aggregates), as in hardstanding including making joints at 3.00 metre intervals and at each corner, the joint shall be filled with mastic filling (to full depth) comprising of one part heated hot blown bitumen 85/25 & two parts heated sand (by volume), surface finished even and smooth without using extra cement, including demolition of existing concrete and removal of debris out of MD land complete all as specified and as directed. Note :- The concrete shall be laid at a stretch not exceeding 3 metre in length and width of joint shall not be more than 12 mm.
Delineator made out of round MS pipe 2"dia and 3' ft long with five bands of reflective tape HIP grade. Three red (1"X6") and two white (2"X6") with jail and one coat of steel primer and two coats of synthetic enamel paint including excavating post holes of 15 x15x 15 CM and embedded in PCC 1:3:6 and including taking down and removing rubbish material to outside MD land complete all as specified and directed.
MS Joist, channel, angle, or tee sections, fixed independently, without connecting plates, etc. (cut to ordinary lengths i.e. within 20mm of the length indicated) including dismantling of existing one all as directed by Engineer-in-Charge.
Preparation of new or previously untreated steel surfaces of any description, over 10 cm width or girth, not otherwise described and applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer complete all as specified and directed.
Note :- (a) All aluminium paint, shall be of 1st quality manufactured by the standard firms of make as specified.
(b) The contractor shall inform the GE, within three weeks of the acceptance of the tender, the brand/names of the manufacturers of paint proposed to be used in the works and submit samples thereof and obtain prior written approval of GE before their use in works.
(c) The contractor shall when so required by the GE, produce certificate from the manufacturer or their representative to establish that the brands of paints purchased by the contractor from them, satisfy the requirements of the relevant Indian Standards. Tint of paint, will be approved by the GE.
(d) Paints shall be obtained direct from approved manufacturer or from their authorized agents only of respective brands mentioned below and brought to site in sealed containers. The paint so procured shall be of first quality of any approved make as per list of makes specified. i. Berger Paints (Luxol), ii. Jenson & Nicholson (Brolac), iii. Shalimar Paints(Superlac), iv. Goodlass Nerolac (Nerolac), v. Asian Paints(Apcolite)
(e) Unless otherwise specified the tints of paint shall be as approved by the GE
(f) The contractor shall submit samples of the paints proposed for the work along with results of tests conducted in approved laboratory as directed by the Engineer-in-Charge for approval.
Forming construction joint, 25mm deep and 8 mm wide in repairs (using diamond cutter), applying one coat of white wash to the exposed vertical faces of slab, providing polyethylene rod 10mm dia and sealed with Polyurethane sealant (Minimum depth above polyethylene rod shall be of 10 mm) complying with BS: 5212 (For type 'FB' fire & fuel resistance) & BS : 4254 and EN-141875 - 2003 (For hydrolysis / water resistance test), priming the sides, minimum movement accommodation factor (MAF)±30% with ten years performance guarantee) and applying masking tape on edge of joint to prevent accidental spillage of sealant on top surfaces to give neat finish to the sealant and removing the masking tape after sealant is applied by mechanical means complete all as specified and directed.
Forming contraction (Dummy) joints, cutting with diamond cutter to a depth of 100 mm and 3mm wide in repairs initially and top 25mm portion cut to 8mm wide to accommodate polyethylene rod 8mm wide and sealant , provision of closed cell polyethylene rod of 10 mm dia sealed with (10mm depth minimum above polyethylene rod) polyeurethane sealant complying with BS 5212 (For type 'FB' fire & fuel resistance) & BS 4254 and EN-141875 - 2003 (For hydrolysis / water resistance test) priming the sides with two coats and with minimum MAF ± 30% (with ten years performance guarantee) and applying masking tape on edges of joint to prevent accidental spillage of sealant on top surfaces to give neat finish to the sealant and removing masking tape after the application of sealant by mechanical means all as specified and directed.
Forming 25 mm thick expansion joint, filled with compressible synthetic filler board, on top of filler board for complete width of joint, provision of closed cell polyethylene rod 30 mm dia, filled with polyurethane sealant (Minimum depth above polyethylene rod shall be of 10 mm) complying with BS-5212 (For type 'FB' fire & fuel resistance) & BS-4254, and EN - 141875 - 2003 (for hydrolysis / water resistance test) priming the sides, with minimum MAF ±30 % (with ten years performance guarantee) and applying masking tape on edges of joint to prevent accidental spillage of sealant and removing the masking tape after sealant is applied by mechanical means in repairs all as specified and directed.
Removing excavated material (soil) to a distance exceeding 1.5 Km but not exceeding 5 Km and depositing where directed at a level n.exc. 1.5 m above the starting point complete all as specified and as directed.
GOVINDAN KUTTY and CO
D.R ASSOCIATES
P Natesan and Co
p.chinnasamy
KRISHNA ENTERPRISES
Neptune Engineers and Builders
The Asian and Co
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .