Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹12.5 L+₹39,942 (3.30%)Rejected-Finance FLAT NO 201 LAXMI PARK NIWAS BT KAWADE ROAD GHORPADI PUNE 411036 | PUNE | MAHARASHTRA | 411036 | L2 | Rejected-Finance Other than L1 Bidder | |
| 3 | L3₹16.2 L+₹4.1 L (34.3%)Rejected-Finance NARMADA COLONY BARADARI CHOURAHA MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L3 | Rejected-Finance Other than L1 Bidder | |
| 4 | L4₹18.9 L+₹6.8 L (56.5%)Rejected-Finance | L4 | Rejected-Finance Other than L1 Bidder | |
| 5 | L5₹19.4 L+₹7.3 L (60.7%)Rejected-Finance 53 SHANTI S SANIK COLONY BAIRAGARH BHOPAL MP 462 030 | BHOPAL | BHOPAL | MADHYA PRADESH | 462030 | L5 | Rejected-Finance Other than L1 Bidder |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
25 Apr 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer Gwalior
Garrison Engineer Morar Cantt Gwalior
8752/GWL/E8 REPAIR AND MAINT OF CENTRAL AND PACKAGE TYPE AC AT MORAR CANTT UNDER GE GWALIOR
2022_MES_515322_1
8752/GWL/E8
Open Tender
Electrical and Maintenance Works
Works
180 days
Garrison Engineer Gwalior
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Garrison Engineer Gwalior
₹40,000
Yes
17 May 2022
25 Mar 2022
29 Apr 2022
25 Mar 2022
25 Apr 2022
9 Apr 2022
60 days
Amount
Repair and maint in replacement AHU filter of size down to micron and EU-4 size and CFM shall be as per site requirement complete all as specified and directed.
Taking down the existing UNSV filter from AHU upto to 10500 CFM, cleaning the cooling coil with suitable chemical and jet of water pressure with pump and remove all the scales and foreign material deposited in side coil followed with air pressure to sweep up all the particles and ensure through flow of air over the cooling coil and refixing the air filter after cleaning complete all as specified and directed.
S&F in replacement AHU blower shaft upto 10500 CFM, hollow or solid made out of hight speed steel, including machine work up to required dia and length, making slot key and hole and renewal of bracket bearings as per site requiement and testing complete all as specified and directed.
M&L in repair for pumping down the existing refrigerant gas in separate cylinder immediately after end of season and fill/re charge the gas at the starting of season carry out pressure leak test by nitrogen gas of the system of AC plant 3 x upto 85 TR for leak proof valve joint, seal other connected controls flaries etc including identify & rectify of leak defects and maintaining constant pressure of 160 lbs on low side and 200 lbs at high side at least 24 hrs complete all as specified and directed. Note : (i) Necessary leak proof empty cylinders and necessay pumps , tools need to be included in the quoted rate. (ii) If any leakage in the cylinder after pumping down, the diffiencies need to be filled by the Contractor without any extra cost.
M&L in repair for descaling of condenser tube of central AC plant of cap 1 x upto 85 TR by disconnecting the condenser from the system cleaning by descaling cloution of make (as per existing) and descaling solution, cleaning solution, cleaning condenser tube by nylon brush & MS rod of suitable size repalcement of rubber joints and unserviceablenut bolts complete all as specified and directed. Note : Necessary tools need to be included in the above quoted rate.
Taking out old perished/worn out mechanical oil seal of compessor at coupling end and replacing it with the (as per existing make), checking for no leakage of oil/gas, testing and commissioning to the entire satisfaction of Engineer in Charge complete all as specified and directed. Note : Gas & Oil required to be charged after replacement of mechanical oil seal shall measured and paid separately.
Taking out old defective burnout motor of capacity 15 HP, 3 phase, 440 V, 50 Hz from foundation and transfer it to workshop for rewinding with super enameled copper wire of existing size & guage and replacement of DE & NDE bearing so as to match the manufacturer original specification and refitting the same, testing and commissioning complete all as specified and directed.
S&F in replacement Single Phase Preventor of the LT Panel of AC Plant, 415 V, 50 Hz 3Phase complete all as specified and directed.
S&F in replacement MCCB of the LT Panel of AC Plant, 63 Amps, 3 Pole, C-Curve, AC, 415V, 50 Hz, 3Phase, c-curve complete all as specified and directed.
Supply only 407C/R22 gas for Compressor as required in servicing complete all as specified and directed.
M&L in repair & replacement of V-belt from AHU motor with the make and size as required and as per sample complete all as specified and directed.
M&L in repair, servicing of compressor of central AC plant of cap 1 x upto 85 TR including replacement of Compressor oil, suction strainer, Compressor oil repair kit and liquid filter cartige etc all as per manufacturer maint guide line complete all as specified and directed.
M&L in maint and cleaning of cooling tower of central AC Plant of capacity 1 x 225 TR by applying suitable chemicals and removing all deposited dust, foreign material, cleaning of filter and servicing of Ct fan motor, sprinklar and PVC arms complete all as specified and directed.
M&L in replacement of CT fan blade for CT motor of cooling tower of central AC Plant of capacity 1 x 65 TR of make as per site requirement or as per sample complete all as specified and directed.
M&L in repair & replacement sprinkler of cooling tower of central AC plant of cap 1 x 225 TR of make as per site requirement or as per sample complete all as specified and directed.
M&L in repair & replacement of water of water pressure indicating gauge fitted water circulation circuit (Range-0 to 100/150 lbs/sq in and 0 to 7/10.6 kg/sq cm complete all as specified and directed.
Taking out old defective burnout motor of capacity 5 to 10 HP, 3 phase, 440 V, 50 Hz from foundation and transfer it to workshop for rewinding with super enamelled copper wire of existing size & gauge and replacement of DE & NDE bearing so as to match the manufacturers original specification and refitting the same, testing and commissioning complete all as specified and directed.
M&L for filling compressor oil grade CPI 120 for compressor complete all as specified and directed.
M&L for repair in replacement micro process computerised mother board suitable for Central AC Plant upto 85 TR Panel of (as per existing make) complete all as specified and as directed.
Material and labour for comprehensive mainenance of Ductable AC 2 TR to 5 TR all as specified and directed.
Material and labour for comprehensive mainenance of CASSETTE UNIT AC 2 TR to 5 TR all as specified and directed.
M&L in repair & replacement AHU pre filter of size, down to micron and EU-4, size and CFM shall be as per site requirement complete all as speficied and directed.
M&L in repair & replacement AHU fine filter of size, down to micron and EU-4, size and CFM shall be as per site requirement complete all as speficied and directed.
M&L in repair & replacement AHU HEPA NANO filter of size, down to micron and EU-4, size and CFM shall be as per site requirement complete all as speficied and directed.
M&L in repair of cladding in external duct and exposed pipe.
M&L in repair of insulation 25 mm thick in duct and and pipe line.
M&L in repair of AHU coil suitable size.
M&L in repair of 3 way mixing valve of suitable size as per site requirement.
M&L in repair of strip type heater of capacity 3 KW.
M&L in repair and maint of chilled water pipe with MS ERW class `C' pipe (Heavy conforming to IS-1239-1958), complete with all accessories such as bends, elbows, flanges, nut bolts, air purging valves, descaling valves.
M&L repair of GSS ducting for supply and retrain complete with flanges, nut, bolts, washers of GI angle iron supports and MS rods complee comprising the following:-
24 Gauge
22 Gauge
20 Gauge
M&L in repair temperature sensor at inlet and outlet on both ends of Chiller.
M&L in repair & replacement of power contractor 25 Amps of the LT panel of AC Plant, 3 Pole, AC, 415 V, 50 HZ, 3 Phase, complete all as specified and directed.
M&L in repair & replacement of relay 25 Amps of the LT panel of AC Plant, 3 pole, AC, 415 V, 50 Hz, 3 Phase, complete all as specified and directed.
Supply and fixing of butterfly valve in repair follow :-
M&L in repair and complete overhauling and through checking of of 5TR capacity package type AC unit including leak tesing and pressure testing for 24 hours and gas changing with R-22 refrigarent including testing with Nitrogen gas etc, complete all as specified and directed by Engr-in-Charge.
S&F in repair copper control cable from blower motor (AHU to compressor) of size 8 core 2.5 Sqmm armoured.
S&F condenser pump with motor 10 HP complete fitting and testing complete.
S&F in repair compress (as per existing make)
Note:- Tenderer are advised to visit the site to access the quantum of work and make of articles before quoting the rates.
Ganga Enterprises
M/s Tirupati construction
E M CONSTROL SYSTEM
M/s Shanti Enterprises
Uma engineers
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .