Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.4 L+₹4,952.58 (1.46%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.8 L+₹45,230.33 (13.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.6 L+₹1.2 L (36.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.7 L+₹1.3 L (39.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹14,715
Closing Date
21 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
IMPROVEMENT OF ROAD FROM GRAD TO DAL AT VEERSERAN BLOCK PAHALGAM
2026_RDPR_324543_5
ENIT108of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹14,715
24 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm Indepth but exceeding 1.5m in width as well as 10 sqm in plan i/c disposal of excavated earth lead upto 50m lift upto 1.5m as directed by engineer incharge | 55.76 | SQM | 91.75 | ₹5,115.98 |
| 2 | P/L of stone soling in bed tightly hand packed. | 37.1 | Cum | 1,100 | ₹40,810 |
| 3 | Providing and laying in position cement concrete of specified grade Of 1:2:4mix ( 1 cement : 2 coarse sand : 4 graded stone agg. 20 mm nominal size incl the cost of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | 38.35 | Cum | 6,591.25 | ₹2,52,774.44 |
| 4 | Centering/ shuttering incl.propping,strutting & removalof same | 28.64 | sqm | 286.35 | ₹8,201.06 |
| 5 | Reinforcement for RCC work i/c straiteining ,cutting ,bending ,placing in position of MS bars | 1,167 | Kg | 114 | ₹1,33,038 |
| 6 | Structural steel work in single section fixed without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. In tees, R.S. joists, angles, flats and channels | 45 | Kg | 120.8 | ₹5,436 |
| 7 | P/L of RCC pipes incl. earth work & providing of proper cushion incl. all carriages 12'' Dia 2no CJ | 2 | No. | 4,290 | ₹8,580 |
| 8 | Carriage of materials by mechanical transport
Sand & Bajri at an average lead of 40 kms | 52.16 | cum | 630.74 | ₹32,899.4 |
| 9 | Carrage of cement by MT | 1 | trip | 2,000 | ₹2,000 |
| 10 | Sign board and photographic charges | 1 | LS | 1,500 | ₹1,500 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1094886.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .